Building Permit Guides (2026)

Project-specific permit guides using actual fee formulas from official .gov fee schedules. Know what is required and what it costs before you start.

About These Guides
  • Each guide covers permit requirements by project type and includes actual fee formulas where available.
  • Fee data is sourced from official .gov fee schedule documents - not generic cost ranges.
  • Virginia coverage is live for Fairfax County. Additional jurisdictions are being added.
  • Use the fee calculator for a quick estimate, then verify directly with your building department before filing.
Live Guides

Virginia, DC & Maryland Permit Cost Guides

Jurisdiction-specific fee guides with verified formulas from official fee schedules.

Hampton, VA Live
Hampton Deck Permit Cost (2026)
0.39% of construction value, $50 minimum. A $15,000 deck is $69.67 all-in. Official schedule revised August 2025.
Newport News, VA Live
Newport News Deck Permit Cost (2026)
0.44% of construction value, $56.10 minimum. A $15,000 deck is $67.32 all-in. City Code Section 13-26.
Roanoke City, VA Live
Roanoke City Deck Permit Cost (2026)
Value-based: $45 + $5 per $1,000. A $15,000 deck is $115 (building permit), plus a 2% state levy. Plan review 10% only if plans required.
Roanoke County, VA Live
Roanoke County Deck Permit Cost (2026)
Value-based: $40 + $6 per $1,000 over $5,000. A $15,000 deck is $107.00 all-in with the 5% technology fee and 2% levy.
Spotsylvania County, VA Live
Spotsylvania County Deck Permit Cost (2026)
Flat $160 deck permit, with or without electric, at any project value. $205-$240 with processing. Schedule effective July 1, 2025.
Manassas City, VA Live
Manassas City Deck Permit Cost (2026)
Decks bill under the all-inclusive R-5 rate of $0.45/SF ($100 minimum). A 300 SF deck is $135, with electrical bundled and no separate plan-review fee. Schedule effective July 1, 2025.
Fauquier County, VA Live
Fauquier County Deck Permit Cost (2026)
Decks bill under the $0.16/SF accessory line ($100 minimum), so most decks are about $112 after the 10% tech surcharge and 2% state levy. Schedule effective July 1, 2025.
Harford County, MD Live
Harford County Shed Permit Cost (2026)
$20 flat at 200 sq ft and under (no inspection); $0.15/sq ft + $100 application fee above. Official DILP schedule.
Chesapeake, VA Live
Chesapeake Pool Permit Cost (2026)
In-ground pool $275 all-in; above-ground $198.50. Itemized flat fee. Official schedule revised Dec 31, 2025.
Montgomery County, MD Live
Montgomery County Deck Permit Cost (2026)
Flat $194.67 for decks 500 sq ft or under; $0.767865/sq ft above. No Maryland state levy. FY2022 DPS schedule.
Carroll County, MD Live
Carroll County Deck Permit Cost (2026)
Flat $60 at any size (category B). No Maryland state levy. Deck electrical is a separate permit. 2021 fee schedule.
Carroll County, MD Live
Carroll County Finished Basement Permit Cost (2026)
Flat $85 at any value (category C). No Maryland state levy. Electrical and plumbing are separate permits. 2021 fee schedule.
Carroll County, MD Live
Carroll County Pool Permit Cost (2026)
Flat $120 in-ground · $60 above-ground (category D). No Maryland state levy. Pool electrical is a separate permit. 2021 fee schedule.
Harford County, MD Live
Harford County Demolition Permit Cost (2026)
Flat $175 residential · $275 commercial. No Maryland state levy or technology fee. Current DILP schedule, effective 2025.
Montgomery County, MD Live
Montgomery County Demolition Permit Cost (2026)
Flat $156.82 residential demolition. No Maryland state levy or technology fee. DPS schedule (FY2022 printed date - verify current).
Montgomery County, MD Live
Montgomery County Shed Permit Cost (2026)
$118.96 flat up to 200 sq ft, then $0.767865/sq ft. No Maryland state levy. DPS schedule (FY2022 printed date - verify current).
Montgomery County, MD Live
Montgomery County Finished Basement Permit Cost (2026)
Alteration rate $0.681345/sq ft + 50% filing fee (min $286.60). ~$1,022 for 1,000 sq ft. DPS schedule (FY2022 - verify current).
Montgomery County, MD Live
Montgomery County Retaining Wall Permit Cost (2026)
Flat $194.67 at any length or height. No Maryland state levy. DPS schedule (FY2022 printed date - verify current).
Montgomery County, MD Live
Montgomery County Addition Permit Cost (2026)
$0.767865/sq ft + filing fee (50% or $286.60). ~$593.75 for a 400 sq ft addition. DPS schedule (FY2022 - verify current).
Baltimore County, MD Live
Baltimore County Solar Permit Cost (2026)
Flat $79 at any system size. No Maryland state levy. Electrical interconnection separate. PAI schedule (2018 printed date - verify current).
Baltimore County, MD Live
Baltimore County Deck Permit Cost (2026)
$85 up to 600 sq ft, $119 over. No Maryland state levy. Deck electrical separate. PAI schedule (2018 printed date - verify current).
Carroll County, MD Live
Carroll County Solar Permit Cost (2026)
Flat $60 (category F) at any system size. No Maryland state levy. Electrical interconnection separate. 2021 schedule - verify current.
Montgomery County, MD Live
Montgomery County Pool Permit Cost (2026)
Flat $313.64 in-ground (fence included) · $232.52 above-ground. No Maryland state levy. FY2022 DPS schedule.
Montgomery County, MD Live
Montgomery County Fence Permit Cost (2026)
Flat $77.87 fence permit. No Maryland state levy. Height and zoning limits set by county code. FY2022 DPS schedule.
Harford County, MD Live
Harford County Pool Permit Cost (2026)
In-ground $200 + $0.10/ft fence (about $215) · above-ground or hot tub $160. No Maryland state levy. Official DILP schedule.
Spotsylvania County, VA Live
Spotsylvania County Pool Permit Cost (2026)
Flat $430 in-ground · $150 above-ground or hot tub · $240 above-ground with deck, plus an $80 or $45 processing fee. Schedule effective July 1, 2025.
Harford County, MD Live
Harford County Fence Permit Cost (2026)
$20 for a fence up to 250 ft, plus $0.10/ft over 250. No Maryland state levy, no tech fee. Official DILP schedule.
Montgomery County, MD Live
Montgomery County Solar Permit Cost (2026)
Flat $227.12 rooftop solar building permit. No Maryland state levy. Electrical interconnection separate. FY2022 DPS schedule.
Virginia Live
Virginia Permit Cost Guide
How permit fees work in Virginia
Fairfax: $688.50 for $15K deck
Virginia Live
Deck Permit Cost in Virginia
Fairfax: $688.50 · Loudoun: ~$402.90
$15,000 deck · 2 jurisdictions
Virginia Live
Pool Permit Cost in Virginia (2026)
Fairfax $413.10 all-in · Chesterfield $108.14 · Henrico $255 for a $30k pool. Flat fee vs value-based formulas compared.
Norfolk City Live
Norfolk Pool Permit Cost (2026)
In-ground $192.50 all-in · Above-ground $116 · Pool barrier $116 separate. Flat-fee schedule with electrical and plumbing trade permits explained.
Fairfax County Live
Fairfax Pool Permit Cost (2026)
In-ground $413.10 all-in · Flat $270 + 50% plan review + 2% levy. Pool barrier filed as alteration; trade permits priced separately.
Richmond City Live
Richmond Pool Permit Cost (2026)
$30k pool ~ $237.62 all-in · $63 base + $6.07/$1,000 over $2,000 + 2% state levy. Same value formula for all residential work.
Richmond City Live
Richmond Deck Permit Cost (2026)
$15k deck ~ $144.75 all-in · Value-based formula, no separate plan review, no fee cap. Source-age caveat: June 2022 schedule.
Chesterfield County Live
Chesterfield Shed Permit Cost (2026)
257-400 sq ft = $114 + $50 env eng + 2% levy ~ $166.28 all-in · Sheds 256 sq ft and under: no permit required.
Henrico County Live
Henrico Pool Permit Cost (2026)
$30k pool = $255 all-in · $100 + $6/$1k over $5k formula, capped at $680. Verified December 2025 schedule.
Chesterfield County Live
Chesterfield Deck Permit Cost (2026)
$166.28 all-in flat · $114 building permit + $50 env eng site inspection + 2% levy on $114. Same fee at any deck value.
Virginia Beach City Live
Virginia Beach Deck Permit Cost (2026)
400 sq ft uncovered deck = $102.32 all-in · $50 + $4/100 sq ft + $25 counter plan review + $10 tech + 2% levy. Cheapest in VA cluster.
Norfolk City Live
Norfolk Deck Permit Cost (2026)
200 sq ft uncovered deck = $152.00 all-in · 3-tier flat schedule ($50/$100/$125 by area) + $35 plan review + $15 processing + 2% levy. July 2021 source.
Washington DC Live
Washington DC Pool Permit Cost (2026)
Pool up to 15,000 gal = $286.00 all-in · $260 base + 10% Enhanced Fee. Larger pools add $33 per 1,000 gal. Live DOB rate, plumbing and electrical trades separate.
Fairfax County Live
Fairfax Shed Permit Cost (2026)
Sheds 256 sq ft and under exempt · 260 sq ft with electrical = $550.80 all-in · 3% of value + 50% PR + 2% levy. Trade permits filed separately.
Loudoun County Live
Loudoun Deck Permit Cost (2026)
Any deck under 1,000 sq ft = $402.90 all-in · bundled $395 flat (building + plan review + zoning) + 2% levy. Same fee regardless of size or value. July 2022 schedule.
Prince William County Live
Prince William Deck Permit Cost (2026)
Deck 250 sq ft or under = $107.24 all-in · deck over 250 sq ft = $266.31 all-in. Surcharge stack baked into printed totals. FY26 schedule, effective July 1, 2025.
Alexandria Live
Alexandria Deck Permit Cost (2026)
Flat $100 base for any deck · about $132 all-in with the city's ~30% surcharge stack (estimated). FY26 Permit Center schedule, effective July 1, 2025.
Loudoun County Live
Loudoun Shed Permit Cost (2026)
Any shed under 1,000 sq ft = $402.90 all-in · bundled $395 flat + 2% levy. Same fee regardless of size or value. July 2022 schedule, source-age caveat applies.
Norfolk City Live
Norfolk Shed Permit Cost (2026)
320 sq ft shed = $101.00 all-in · $0.15/sq ft (min $50) + $35 plan review + $15 processing + 2% levy. Cheapest verified VA jurisdiction for small sheds. July 2021 source.
Henrico County Live
Henrico Shed Permit Cost (2026)
320 sq ft at $8k = $120.36 all-in · $100 base + $6/$1,000 over $5,000, capped $680 + 2% levy. Value-based formula; cap activates at $116,667. Verified Dec 2025.
Washington, DC Live
DC Shed Permit Cost (2026)
Any new shed = $71.50 all-in · flat $65 Section a + 10% DOB Enhanced. Size-independent, value-independent. Cheapest DMV jurisdiction. Verified live April 2026.
Loudoun County Live
Loudoun Addition Permit Cost (2026)
Any addition under 1,000 sq ft = $402.90 all-in · bundled $395 + 2% levy. Over 1,000 sq ft: 1% of value + $335 PR + 2% levy. July 2022 schedule, source-age caveat applies.
Washington DC Live
DC Addition Permit Cost (2026)
Priced as new construction: $0.03/cubic foot + $0.002/sq ft GBF + 10% Enhanced. 500 sq ft sunroom $133.10. 800 sq ft addition $212.96. Volume-based, not value-based.
Washington DC Live
DC Alteration Permit Cost (2026)
4-tier formula. Tier 3: $30 + 2% value + 10% Enhanced + 0.13% Green Building Fee. $30k kitchen $735.90. $50k whole-home $1,204.50. Bundled plan review.
Fairfax County Live
Fairfax Alteration Permit Cost (2026)
3% of value + 50% plan review + 2% state levy = ~4.59% effective rate, uncapped. $15k bathroom $688.50. $30k kitchen $1,377. $50k whole-home $2,295. Min $110.16.
Henrico County Live
Henrico Alteration Permit Cost (2026)
$100 base + $6/$1k over $5k, capped $680 + 2% levy. $30k kitchen $255. High-value alterations capped at $693.60 all-in. Cheapest verified DMV jurisdiction for luxury renovations.
Virginia Statewide Live
Virginia Alteration Permit Cost (2026)
9x cost spread across 6 verified VA jurisdictions. $30k kitchen: Norfolk $152, Henrico $255, Loudoun $402.90, Fairfax $1,377. Pricing-method comparison + worked examples.
Richmond City Live
Richmond Alteration Permit Cost (2026)
$63 + $6.07/$1k over $2k + 2% levy. $15k bathroom $144.75. $30k kitchen $237.62. $100k gut $671.02. Uncapped 0.607% slope. June 2022 schedule.
Virginia Beach Live
Virginia Beach Alteration Permit Cost (2026)
$50 + $5/$1k + $100 PR + $10 tech + 2% on BP. $15k bathroom $237.50. $30k kitchen $314. $100k gut $671. July 2025 schedule (most current).
Norfolk City Live
Norfolk Alteration Permit Cost (2026)
Flat $100 BP + $35 PR + $15 + 2% on BP = $152 all-in regardless of value. Cheapest verified DMV at any value over $9.5k. Re-roof/siding need no permit.
Loudoun County Live
Loudoun Alteration Permit Cost (2026)
Bundled $395 (BP+PR+zoning) + 2% levy = $402.90 all-in under 1,000 sq ft. Over 1,000 sq ft: 1% formula + $335 PR. Bundled structure unique in DMV.
Virginia (statewide) Live
Virginia Demolition Permit Cost (2026)
Cross-jurisdiction guide. $66 (Norfolk flat) to $2,295 (Fairfax 3% formula) for $50k demolition. 4 verified VA jurisdictions plus DC compared.
Fairfax County Live
Fairfax Demolition Permit Cost (2026)
3% of declared value + 50% plan review + 2% levy. $8k garage $367.20 (Appendix Q example). $15k house $688.50. $50k full home $2,295. Uncapped.
Henrico County Live
Henrico Demolition Permit Cost (2026)
$100 base + $6/$1k over $5k, capped $680, + 2% levy. $5k $102; $15k $163.20; $50k $377.40. Cap activates at $101,667 declared. $693.60 ceiling.
Richmond City Live
Richmond Demolition Permit Cost (2026)
Flat $184 + 2% levy = $187.68 all-in regardless of declared value. Separate from Richmond's value-based formula. June 2022 schedule.
Norfolk City Live
Norfolk Demolition Permit Cost (2026)
Flat $50 BP + $15 processing + 2% on $50 = $66 all-in. Cheapest verified VA demolition jurisdiction at any declared value. July 2021 schedule.
Virginia (statewide) Live
Virginia Garage Permit Cost (2026)
Detached garage fees by jurisdiction: Fairfax from $110.16 (per sq ft), Henrico $163.20-$438.60 (by value), Chesterfield flat $340.70, DC $71.50.
Fairfax County Live
Fairfax Garage Permit Cost (2026)
Per-sq-ft new construction ($0.143/sq ft wood frame, $72 min) + 50% PR + 2% levy. Most detached garages hit the $110.16 floor; 720 sq ft $157.53.
Henrico County Live
Henrico Garage Permit Cost (2026)
$100 + $6/$1k over $5k, capped $680, + 2% levy. $15k $163.20; $25k $224.40; $60k $438.60. Cap activates at $101,667 declared. $693.60 ceiling.
Chesterfield County Live
Chesterfield Garage Permit Cost (2026)
Flat $285 BP + $50 Environmental Engineering + 2% levy = $340.70 all-in, the same at any garage size or declared value. FY2025-2026 schedule.
Washington, DC Live
DC Garage Permit Cost (2026)
Flat $65 + 10% DOB Enhanced = $71.50 all-in for a standard detached garage. Cheapest DMV jurisdiction. Large garages may reclassify to $0.03/cu ft.
Virginia (statewide) Live
Virginia Roof Permit Cost (2026)
Re-roof permit costs by jurisdiction for a $15,000 job: Fairfax $688.50, DC $384.45, Virginia Beach $237.50, Richmond $144.75. Norfolk requires no permit ($0).
Fairfax County Live
Fairfax Roof Permit Cost (2026)
Full re-roof billed at 3% of value + 50% plan review + 2% levy. A $15,000 re-roof is $688.50 all-in; the floor is $110.16. Repair under 25% may be exempt.
Norfolk City Live
Norfolk Roof Permit Cost (2026)
Norfolk requires no permit for a residential re-roof ($0) - the rare VA exception. Structural roof framing files as a $152 alteration; commercial re-roof $150.
Washington, DC Live
DC Roof Permit Cost (2026)
Re-roof follows the alteration tier formula: $30 + 2% of value + 10% Enhanced Fee + 0.13% Green Building Fee. A $15,000 re-roof totals $384.45 all-in.
Fairfax County Live
Fairfax Fence Permit Cost (2026)
Most residential fences need no permit ($0, under 7 feet). Over 7 feet, in a floodplain, or in a historic district: 3% of value, with a $110.16 floor.
Washington, DC Live
DC Fence Permit Cost (2026)
Every private-property fence needs a permit in DC, but the fee is a flat $33 + 10% Enhanced = $36.30 - regardless of fence size, height, or material.
Virginia (statewide) Live
Virginia Retaining Wall Permit Cost (2026)
Retaining wall fees by jurisdiction for a $10,000 wall: Chesterfield flat $116.28, Fairfax $459 (3% of value), DC $506 ($46 per $1,000 of cost).
Fairfax County Live
Fairfax Retaining Wall Permit Cost (2026)
Walls over 4 feet need a permit: 3% of value + 50% plan review + 2% levy. A $6,500 wall is $298.35 all-in; the floor is $110.16.
Chesterfield County Live
Chesterfield Retaining Wall Permit Cost (2026)
Flat $114 building permit + 2% levy = $116.28 all-in for any retaining wall, whatever its value. A $50 site-inspection fee may apply.
Washington, DC Live
DC Retaining Wall Permit Cost (2026)
Billed at $46 per $1,000 of construction cost + 10% Enhanced Fee. A $10,000 wall totals $506 all-in. No Green Building Fee on this line.
Virginia (statewide) Live
Virginia Solar Permit Cost (2026)
No statewide waiver - solar permit fees are set locally. Fairfax waives the building permit ($0); the required electrical permit runs about $385.56.
Fairfax County Live
Fairfax Solar Permit Cost (2026)
Building permit waived ($0), but the required electrical permit is not: $378 + 2% levy = $385.56 all-in for a typical 8 kW system on a 200-amp service.
Washington, DC Live
DC Solar Permit Cost (2026)
Flat $36.30 Instant Permit ($33 + 10% DOB Enhanced Fee) for residential PV systems up to 15 kW. Larger systems file a standard permit.
Fairfax County Live
Fairfax Electrical Panel Permit Cost (2026)
Priced by service amperage, not cost: $378 for a standard 200-amp service + 2% levy = $385.56 all-in. Tiers run $341 to $633, $135 minimum.
Washington, DC Live
DC Electrical Panel Permit Cost (2026)
A qualifying residential heavy-up is a flat $64.90 Instant Permit ($59 + 10% Enhanced). Standard service permits start at $42.90, $22 minimum.
Fairfax County Live
Fairfax Water Heater Permit Cost (2026)
Plumbing permit by fixture count: a single water heater is the 1-5 fixture tier at $340 + 2% levy = $346.80 all-in. Verified Appendix Q FY2025.
Washington, DC Live
DC Water Heater Permit Cost (2026)
A single plumbing fixture at $26 + 10% DOB Enhanced Fee = $28.60. Instant Permit eligible; no state levy. Verified dob.dc.gov.
Fairfax County Live
Fairfax HVAC Permit Cost (2026)
Mechanical permit by zone count: a single-zone system is $135 + 2% levy = $137.70 all-in. Tiers run to $660 for 5+ zones. Verified Appendix Q FY2025.
Washington, DC Live
DC HVAC Permit Cost (2026)
Priced by equipment class: a residential AC or heat pump is Class E at $50.60 (up to 10 tons), Instant Permit eligible. No state levy. Verified dob.dc.gov.
Fairfax County Live
Fairfax Addition Permit Cost (2026)
$50,000 addition = $2,295.00 all-in · 3% of value + 50% plan review + 2% state levy. $110.16 minimum permit fee. Verified FY2025 Appendix Q.
Virginia (statewide) Live
Virginia Addition Permit Cost (2026)
$50k addition = $196.70 (VA Beach) up to $2,295 (Fairfax) · six verified jurisdictions, formulas, worked examples, 2% state levy.
Henrico County Live
Henrico Addition Permit Cost (2026)
$50k addition = $377.40 all-in · $100 base + $6/$1k over $5k, capped at $680. Plan review bundled. $693.60 cap at $101,667 declared.
Chesterfield County Live
Chesterfield Addition Permit Cost (2026)
$456.98 all-in flat for any addition · $399 building permit + $50 site fee + 2% levy. Same fee at $5k or $250k. Verified FY2025-2026.
Virginia Beach City Live
Virginia Beach Pool Permit Cost (2026)
$30k in-ground pool = $314.00 all-in · $50 + $5/$1k of value + $100 plan review + $10 tech + 2% levy. Barrier and electrical separate.
Richmond City Live
Richmond Addition Permit Cost (2026)
$50k addition = $361.45 all-in · $63 base + $6.07/$1k over $2k + 2% levy. No cap. June 2022 schedule verified.
Norfolk City Live
Norfolk Addition Permit Cost (2026)
500 sq ft addition = $126.50 all-in · $0.15/sq ft + $35 plan review + $15 processing + 2% levy. July 2021 schedule.
Virginia Beach City Live
Virginia Beach Addition Permit Cost (2026)
500 sq ft heated addition = $121.70 all-in · $50 + $7/100 sq ft + $25 counter PR + $10 tech + 2% levy. Rev. Jul-2025.
Henrico County Live
Henrico Deck Permit Cost (2026)
$15k deck = $163.20 all-in · $100 + $6/$1k over $5k formula, capped at $680. Plan review bundled. Verified December 2025 schedule.
Chesterfield County Live
Chesterfield Pool Permit Cost (2026)
$108.14 flat any pool value · $57 building permit + $1.14 levy + $50 env eng. Cheapest verified VA jurisdiction for pools.
Washington DC Live
Washington DC Deck Permit Cost (2026)
$5k=$150.15 · $15k=$384.45 · $25k=$618.75 · $50k=$1,204.50. Alteration tier formula + 10% Enhanced Fee + Green Building Fee scaling examples.
Virginia Live
Shed Permit Cost in Virginia
No permit under 256 sq ft · $102-$291 if required
3 jurisdictions verified

Project-Type Guides

Permit requirement guides by residential project type. Each guide will cover what triggers a permit, what exemptions apply, and how the fee is calculated across multiple Virginia jurisdictions.

Project Type Permit Required? Fairfax County Fee Guide Status
Deck / Patio Cover Yes - attached decks over 200 sqft; all decks over 30 inches off grade 3% of cost · min $72 Live →
Swimming Pool (In-Ground) Yes - all in-ground pools require a building permit $108-$413 · varies by county Live →
Roof Replacement Typically not required for like-for-like replacement in most VA jurisdictions Verify with LDS Guide in progress
Room Addition Yes - all additions require a building permit 3% of cost · min $72 Guide in progress
Basement Finish Yes - finished basement space requires a building permit 3% of cost · min $72 Guide in progress
Fence Conditional - required if over 7 ft or in certain overlay districts 3% of cost · conditional Guide in progress
Shed / Accessory Structure Conditional - required over a certain floor area (256 sq ft in Chesterfield; verify in other jurisdictions) $102-$291 · varies by county Live →
Solar Panels Yes - building permit required but building fee waived in Virginia $0 building · ~$378 electrical Guide in progress
Kitchen Remodel Yes if structural changes or new electrical/plumbing circuits added 3% of cost · min $72 Guide in progress
ADU (Accessory Dwelling Unit) Yes - new ADU construction requires building and trade permits $0.143/sqft wood frame Guide in progress

Permit requirement thresholds above reflect Fairfax County rules. Other Virginia jurisdictions may have different thresholds. Always verify with your local building department before starting any project.

Always verify permit requirements and current fees with your local building department before starting any project. Permit thresholds, exemptions, and fee schedules change regularly. Contact your county or city Land Development Services or Building Inspections office for current requirements. Primary official fee schedules: Fairfax County Appendix Q (FY2025) and DC DOB fee schedule.
Disclaimer: All permit requirement information and fee data on PermitPrice is for informational purposes only. Actual permit requirements and fees are determined by the local building department. Requirements and fees can change without notice. Verify directly with the applicable building department before budgeting, filing, or starting any construction work.

Written by: Munib Ur Rehman

Data verified against official fee schedule documents.