How Much Is a Shed Permit? (2026)
What a building permit costs for a backyard shed or other accessory structure, compared across every jurisdiction PermitPrice has verified, and why many sheds need no permit at all.
A shed permit costs between $25.00 and $402.90 for a $5,000, 160 sq ft storage shed across the 11 jurisdictions PermitPrice has verified in MD, TX, VA. The median is $100.00. There is no national or statewide shed permit fee: every county and city sets its own, and the 16x spread in this table comes from three different pricing methods, not from the size of the project.
- Across 11 verified jurisdictions, a permit for a $5,000, 160 sq ft storage shed runs from $25.00 (Arlington, TX) to $402.90 (Loudoun County, VA). The median is $100.00.
- 3 of the 11 jurisdictions charge a flat fee, from $50.00 to $402.90. 3 price the permit on the project value; those are where the highest totals appear. 5 price it by floor area or size tier.
- Most jurisdictions exempt small sheds entirely, usually below 120, 200 or 256 sq ft with no plumbing or electrical. Above the local threshold a building permit is required and the fees below apply. The exemption size is set locally and is stated on each jurisdiction page.
- A shed with power or water adds separate electrical or plumbing permits. The building permit fee alone is what this page compares.
- Every figure here is computed from the jurisdiction's own published fee schedule with the same inputs; the effective date of each schedule is shown in the table, and 4 of the 11 rows carry a source-age or undated-schedule caveat.
This guide covers: the residential building permit fee for a $5,000, 160 sq ft storage shed, computed with the same inputs for every jurisdiction in PermitPrice's verified data set that publishes a fee line for this project type (11 of 64 covered jurisdictions). Each row links to the jurisdiction page with the full schedule, the worked example and the official source.
This guide does NOT cover: trade permits (electrical, plumbing, mechanical), zoning or setback review, HOA approval, impact or utility connection fees, reinspection fees, or commercial work. A shed with power or water adds separate electrical or plumbing permits. The building permit fee alone is what this page compares.
Coverage note: PermitPrice covers Virginia, Maryland, Texas and Washington, DC. Jurisdictions outside those states, and covered jurisdictions whose schedule has no separate line for this project type, are not in the table. The range is a range of verified fee schedules, not a national average.
Three Ways Jurisdictions Price a Shed Permit
The dollar figures look arbitrary until you see the formula behind each one. Every jurisdiction in the table uses one of three methods, and the method matters more than the project.
Shed Permit Cost by Jurisdiction
All-in building permit fee for a $5,000, 160 sq ft storage shed, lowest to highest. Each total is computed by PermitPrice's calculator engine from the jurisdiction's published schedule with identical inputs, so the rows are directly comparable. Click a jurisdiction for its full fee schedule and source.
| Jurisdiction | Method | Line items | All-in total | Schedule effective | Data quality |
|---|---|---|---|---|---|
| Arlington, TX | Flat by size tier | Building Permit Fee $25.00 | $25.00 | Sep 1, 2025 | Verified |
| Round Rock, TX | Flat fee | Building Permit Fee $50.00 | $50.00 | Undated schedule | Verified |
| Killeen, TX | Flat fee | Building Permit Fee $70.00 | $70.00 | Oct 1, 2025 | Verified |
| Baltimore County, MD | Flat by size tier | Building Permit Fee $85.00 | $85.00 | Nov 26, 2018 | Source-age |
| College Station, TX | Per sq ft | Building Permit Fee $89.60 | $89.60 | Oct 1, 2025 | Verified |
| Grand Prairie, TX | Flat by size tier | Building Permit Fee $100.00 | $100.00 | Sep 2, 2025 | Verified |
| Henrico County, VA | Value tiers | Building Permit Fee $100.00 + 2% VA levy $2.00 | $102.00 | Undated schedule | Verified |
| Anne Arundel County, MD | Flat by value tier | Building Permit Fee $103.00 + application fee $43.00 | $146.00 | Oct 1, 2024 | Verified |
| Fairfax County, VA | Percent of cost | Building Permit Fee $150.00 + 2% VA levy $3.00 + 10% technology surcharge $15.00 | $168.00 | Jul 1, 2026 | Verified |
| Frederick County, MD | Flat by size tier | Building Permit Fee $144.00 + Filing Fee $33.00 + automation fee $11.00 | $188.00 | Jul 1, 2026 | Verified |
| Loudoun County, VA | Flat fee | Building Permit Fee $395.00 + 2% VA levy $7.90 | $402.90 | Jul 1, 2022 | Source-age |
Verified = computed from the official fee schedule linked on the jurisdiction page. Source-age = the official schedule is dated before 2024 and may have been superseded; the jurisdiction page discloses the caveat. Undated schedule = the official source shows no printed effective date. Totals use each jurisdiction's own rounding.
What Drives the 16x Difference
The same shed costs $25.00 to permit in Arlington, TX and $402.90 in Loudoun County, VA. Four things account for almost all of that gap.
- Percentage pricing. A schedule that charges a percent of project value scales with your budget; a flat fee does not. For a $5,000 shed, percentage schedules produce the top of the table.
- Stacked surcharges. Virginia adds a 2% state levy on every permit. Some jurisdictions add a separate plan review or filing fee (often 50% of the permit), an application fee, or a technology fee. Each is a line on the invoice that a headline "permit fee" leaves out.
- Minimum fees. Where a percentage or per-square-foot rate would produce a tiny number, the schedule's minimum applies instead. Small projects in those jurisdictions pay the minimum plus surcharges.
- Schedule age. Fee schedules are typically re-adopted each fiscal year (July 1 in Virginia and Maryland, October 1 in many Texas cities). A jurisdiction whose published schedule is several years old may charge more today than the table shows; those rows are flagged.
When These Numbers May Not Apply
- Your project cost or size differs from the example. Flat-fee rows do not change; percentage and per-square-foot rows do. Use the jurisdiction page or the calculator with your own inputs.
- The building official substitutes a valuation. Percent-of-value jurisdictions may replace a low declared cost with a valuation table figure, raising the permit fee.
- The schedule has been re-adopted. Rows flagged Source-age or Undated may be higher today. The jurisdiction page shows the last date PermitPrice verified the schedule.
- Work started before the permit. After-the-fact permits, reinspection fees and penalties are outside every figure on this page.
- Special districts. Historic overlays, floodplains and HOA covenants add review steps and sometimes fees that the building permit schedule does not include.
Frequently Asked Questions
-
Fairfax County, VA official fee schedule Effective Jul 1, 2026 · Last verified Sep 18, 2026
-
Frederick County, MD official fee schedule Effective Jul 1, 2026 · Last verified Jun 8, 2026
-
Killeen, TX official fee schedule Effective Oct 1, 2025 · Last verified Jul 2, 2026
The remaining 8 jurisdictions in the table cite their official schedule, with effective and verified dates, on their linked pages.