Skip to main content

Baltimore County, MD Building Permit Fees (2026)

Residential building permit fees from the official Baltimore County Department of Permits, Approvals and Inspections (PAI) fee schedule. Baltimore County charges flat fees by structure type and size: decks, additions, fences, and solar are fixed dollar amounts regardless of construction value. Maryland adds no statewide percentage levy. Important: the published PAI schedule is dated effective November 26, 2018, so confirm current rates before budgeting.

Jurisdiction
Baltimore County, MD
Fee Structure
Flat fees by structure type and area
State Levy
None (Maryland has no statewide levy)
Fee Schedule Dated Effective
November 26, 2018
Source Extracted
June 1, 2026 (PAI fee PDF)
Fee Status
Official PAI schedule - 2018 printed date, verify current
What This Page Covers - and What It Does Not

This page covers: Baltimore County residential building permit fees from the official PAI building permit fee schedule (BPP 15 Attachment A) - flat fees for decks, additions, accessory structures, fences, residential solar, fireplaces/wood stoves, and foundation-only permits, plus the area-based fee categories for new construction.

This page does NOT cover: Trade permits (electrical, plumbing-gas fitting) on separate schedules; zoning, development, and appeals fees (a separate county schedule); the investigation fee for work started without a permit; and impact/development fees.

Important note on fee schedule age: The PAI building permit fee PDF currently published by Baltimore County is dated effective November 26, 2018 - over seven years old at extraction. It is the version the county currently serves, but confirm current rates with PAI at 410-887-3900 before relying on any figure. All permit fees are rounded up to the nearest dollar.

Key Takeaways
  • Baltimore County charges flat fees by structure type and size, not by construction value.
  • A deck is $85 (up to 600 sq ft) or $119 (over 600 sq ft); an addition is $85 (up to 600 sq ft) or $130 (over 600 sq ft or second floor).
  • A residential fence is $25, residential solar is $79, and a fireplace or wood stove is $21.
  • New one- and two-family construction is Fee Category D with a $231 minimum (area-based).
  • Maryland has no statewide percentage levy, and Baltimore County applies no percentage technology fee.
  • The published PAI fee schedule is dated effective November 26, 2018 - confirm current rates with PAI before relying on any figure.

Baltimore County Residential Building Permit Fee Schedule

All fees below are the PAI building permit fee. Maryland adds no statewide levy. All permit fees are rounded up to the nearest dollar.

Project Type PAI Building Permit Fee Notes
Deck - up to 600 sq ft $85.00 Flat fee
Deck - over 600 sq ft $119.00 When construction plans required
Addition - up to 600 sq ft $85.00 Flat fee
Addition - over 600 sq ft or second floor $130.00 Flat fee
Accessory structure - up to 1,000 sq ft $85.00 Flat fee
Accessory structure - over 1,000 sq ft $130.00 Flat fee
Fence - residential $25.00 Commercial $85.00
Solar power system - residential $79.00 Flat fee
Fireplace / wood stove $21.00 Flat fee
Foundation only - residential $135.00 Commercial $225.00
New one- and two-family construction (Fee Category D) $231.00 minimum Area-based; multi-family $119/unit new

Source: Baltimore County PAI Building Permit Fee Schedule (BPP 15 Attachment A, Rev 11/18), dated effective November 26, 2018. Extracted June 1, 2026. All fees rounded up to the nearest dollar. Confirm current rates with PAI at 410-887-3900 before filing.

How Baltimore County Calculates Building Permit Fees

Methodology - Baltimore County Residential Building Permit
Step What Happens Baltimore County Rule
1. Identify the structure type Match the project to the PAI line item. Decks, additions, accessory structures, fences, solar, fireplaces each have a fixed fee.
2. Check the size threshold Some flat fees step up by area. Deck/addition $85 up to 600 sq ft, higher above; accessory $85 up to 1,000 sq ft.
3. New construction uses fee categories For new buildings, apply the area-based category. Residential one/two-family is Category D, $231 minimum.
4. No value calculation The fee does not scale with construction value. A $5,000 deck and a $40,000 deck are both $85 (up to 600 sq ft).
5. No state levy or technology fee Maryland and Baltimore County add no percentage charge. The PAI flat fee is the building permit cost; fees are rounded up to the nearest dollar.

Worked Examples

Example 1: Deck, up to 600 sq ft

Fee Calculation - Deck Permit in Baltimore County, MD
Fee Component Rule Applied Amount
PAI Building Permit - deck (≤600 sq ft) Flat fee $85.00
State Levy Maryland has none $0.00
Estimated Total Flat deck fee $85.00

Note: Any deck up to 600 sq ft is a flat $85 regardless of value; over 600 sq ft is $119. Source: PAI schedule (2018 printed date - verify current).

Example 2: Room Addition, up to 600 sq ft

Fee Calculation - Room Addition in Baltimore County, MD
Fee Component Rule Applied Amount
PAI Building Permit - addition (≤600 sq ft) Flat fee $85.00
State Levy Maryland has none $0.00
Estimated Total Flat addition fee $85.00

Note: An addition over 600 sq ft or adding a second floor is $130. Trade permits separate. Source: PAI schedule (2018 - verify current).

Example 3: Residential Solar Power System

Fee Calculation - Residential Solar in Baltimore County, MD
Fee Component Rule Applied Amount
PAI Building Permit - residential solar Flat fee $79.00
State Levy Maryland has none $0.00
Estimated Total Flat solar fee $79.00

Note: Residential solar is a flat $79; an electrical permit for the interconnection is separate. Source: PAI schedule (2018 - verify current).

Example 4: New Detached House (Fee Category D)

Fee Calculation - New One/Two-Family Home in Baltimore County, MD
Fee Component Rule Applied Amount
PAI Building Permit - new one/two-family (Category D) Area-based minimum $231.00
State Levy Maryland has none $0.00
Estimated Building Permit Total Category D minimum $231.00

Note: $231 is the stated residential minimum for new one- and two-family construction; the actual fee is area-based and may be higher for a larger home. Trade permits, zoning/development fees, and impact fees are separate and excluded. Source: PAI schedule (2018 - verify current).

Practitioner Insight

Baltimore County's flat-fee model is the simplest in the Baltimore metro: a deck is $85, a fence is $25, solar is $79 - the same whether the job is small or expensive. That predictability is a real advantage for homeowners, but it also means the building permit fee tells you little about the total project cost, since trade permits and any zoning or development fees are billed separately.

The one caution on this page is age. The PAI fee PDF the county currently publishes is dated effective November 26, 2018. We record what the county serves, but a seven-year-old schedule should be confirmed before you write a check - call PAI at 410-887-3900 to verify the current figure for your structure type. Remember, too, that all Baltimore County permit fees are rounded up to the nearest dollar.

Baltimore County Department of Permits, Approvals and Inspections

Department

Permits, Approvals and Inspections (PAI)

Baltimore County Government

Phone

410-887-3900

PAI main line

Department Website

baltimorecountymd.gov/departments/pai

Fees, forms, inspections

Online Portal

Online Permit, Licensing and Registration

Apply at cityworkspro.baltimorecountymd.gov

Verify current fees with the Baltimore County Department of Permits, Approvals and Inspections before budgeting or filing. The published PAI fee schedule is dated effective November 26, 2018; call 410-887-3900 to confirm current rates before submitting an application.

When This Estimate May Not Apply

Fee schedule age

The PAI building permit fee PDF is dated effective November 26, 2018 - more than seven years old. Baltimore County may have adjusted rates since; confirm the current figure with PAI before relying on any number.

Trade permits are separate

Electrical and plumbing-gas fitting permits carry their own PAI schedules and are not included above.

Zoning, development, and impact fees

Zoning, development, and appeals fees are a separate county schedule, and impact/development fees are not part of the building permit fee.

New-construction area pricing

$231 is the residential minimum for Fee Category D; the actual new-construction fee is area-based and can be higher for larger homes.

Frequently Asked Questions

Baltimore County charges flat fees by structure type. A deck is $85 (up to 600 sq ft), a fence is $25, residential solar is $79, and an addition is $85 (up to 600 sq ft). New one- and two-family construction is a $231 minimum. The fees do not change with construction value, and Maryland adds no statewide levy.
A deck up to 600 square feet is a flat $85. A deck over 600 square feet is $119 when construction plans are required. The fee is the same regardless of what the deck costs to build.
The PAI building permit fee PDF that Baltimore County currently publishes is dated effective November 26, 2018. PermitPrice records the schedule's own printed effective date. Because it is more than seven years old, we flag a source-age caveat and recommend confirming current rates with PAI at 410-887-3900.
No. Maryland has no statewide percentage building-permit levy, and Baltimore County applies no percentage technology fee. The flat PAI fee (rounded up to the nearest dollar) is the building permit cost.
A residential solar power system is a flat $79 building permit fee. A separate electrical permit applies for the interconnection. Commercial roof-mounted solar is priced per square foot instead.
Through the county's Online Permit, Licensing and Registration portal at cityworkspro.baltimorecountymd.gov. For help call PAI at 410-887-3900. Confirm the current fee for your structure type before submitting, since the published schedule carries a 2018 printed date.

Sources

Official Sources - Extracted June 2026
Next Step

Compare Baltimore County's flat fees against Anne Arundel County's value-based table, or see the rest of the Maryland and DMV jurisdictions.

Maryland Permit Fees Hub → All Permit Guides → Compare Jurisdictions →

Permit Fees Are One Part of Your Project Budget

Once you know your Baltimore County permit cost, two related numbers complete your total budget picture:

Property tax impact after your project closes

A permitted deck or addition raises your assessed value in Baltimore County. See the ongoing property tax impact at CountyTaxTools.com.

Development and impact fees

New construction in Baltimore County can trigger development and impact fees beyond the permit. Research them at ZoneFee.com.

Always verify current fees directly with the Baltimore County Department of Permits, Approvals and Inspections before budgeting or filing. The published PAI schedule is dated effective November 26, 2018. Call 410-887-3900 to confirm current rates.
Disclaimer: All fee information on PermitPrice is informational only and not an official permit quotation. Actual fees are determined by Baltimore County PAI at the time of application. The published fee schedule carries a 2018 printed effective date; confirm current rates before relying on any figure. Trade permits, zoning/development fees, and impact fees are excluded from the figures on this page.

Written by: Munib Ur Rehman

Data verified against official fee schedule documents.