Howard County and Baltimore County are neighbors with very different fee mechanics. Howard meters square footage - $0.25 per square foot for additions, plus a $50 filing fee and a 10% technology fee. Baltimore County charges flat fees by size band - an addition is $85 up to 600 square feet and $130 over, with no technology fee. On additions, where both counties itemize, Baltimore County is consistently cheaper. The big caveat: Baltimore County's published fee schedule is dated 2018, so confirm current figures before relying on them.

Key Takeaways
  • Howard prices additions per square foot ($0.25/sq ft + $50 filing + 10% technology fee); Baltimore County charges flat by size band ($85 up to 600 sq ft, $130 over).
  • A 400 sq ft addition: about $160 in Howard vs a flat $85 in Baltimore County.
  • An 800 sq ft addition: about $270 in Howard vs a flat $130 in Baltimore County.
  • Baltimore County's flat-by-size-band fees are cheaper for additions because they do not scale with each square foot and carry no technology fee.
  • New construction is not directly comparable: Howard charges $0.25/sq ft (about $810 for a 2,400 sq ft house), while Baltimore County lists a Category D minimum of $231 with the residential per-square-foot rate unpublished.
  • Neither county adds a statewide Maryland levy. Howard's schedule is current (July 1, 2025); Baltimore County's is dated November 26, 2018 - a source-age caveat applies to Baltimore figures.

Howard vs Baltimore County: Fee Structure Side by Side

Fee Element Howard County (DILP) Baltimore County (PAI)
Addition $0.25 / sq ft + $50 filing $85 (≤600 sq ft) / $130 (over)
Deck Priced per sq ft (no separate deck line) $85 (≤600 sq ft) / $119 (over)
New 1-2 family dwelling $0.25 / sq ft (+ $100 filing) Category D, $231 minimum (per-sq-ft rate unpublished)
Residential solar Electrical trade permit (separate) Flat $79
Fence Confirm with DILP Flat $25 (residential)
Technology fee 10% of permit fee None
State levy None (Maryland) None (Maryland)
Fee schedule effective July 1, 2025 (FY2026) November 26, 2018 (verify current)

Baltimore County's flat-by-size-band model means a 200 sq ft and a 600 sq ft addition pay the same $85; Howard's per-square-foot model charges more as the addition grows. Baltimore County's schedule dates to November 2018 - older than any other verified Maryland county on this site - so confirm figures with PAI before relying on them.

Shared-Assumption Worked Examples

Each example assumes the same addition size for both counties. Trade permits are excluded on both sides.

Example 1: Room Addition - 400 sq ft

Fee Component Howard County Baltimore County
Building permit fee 400 × $0.25 = $100.00 Flat $85.00 (≤600 sq ft)
Filing fee $50.00 included
Technology fee (10%) $10.00 $0.00
Total $160.00 $85.00

Note: Baltimore County's flat $85 (any addition up to 600 sq ft) is well below Howard's $160. Baltimore figures are from a November 2018 schedule.

Example 2: Larger Addition - 800 sq ft

Fee Component Howard County Baltimore County
Building permit fee 800 × $0.25 = $200.00 Flat $130.00 (over 600 sq ft)
Filing fee $50.00 included
Technology fee (10%) $20.00 $0.00
Total $270.00 $130.00

Note: Baltimore County's flat $130 (any addition over 600 sq ft) stays well under Howard's per-square-foot total, and the gap widens as the addition grows.

New Construction - Not Directly Comparable

A new 2,400 sq ft house is about $810 in Howard County ($600 permit at $0.25/sq ft + $60 technology fee + $100 filing + $50 guaranty). Baltimore County lists residential new construction under Fee Category D with a $231 stated minimum, but its actual per-square-foot residential rate is not published on the fee schedule, so a true head-to-head total cannot be computed. We do not publish a single Baltimore County new-home figure here. Both counties also assess large separate impact and school charges on new homes, excluded throughout.

Which County Is Cheaper for Your Project?

Scenario Lower Fee Why
Addition up to 600 sq ft Baltimore ($85 vs $160 at 400 sq ft) Flat fee does not scale with size; no technology fee
Addition over 600 sq ft Baltimore ($130 vs $270 at 800 sq ft) Flat $130 stays fixed; Howard keeps charging per sq ft
New 1-2 family dwelling Not directly comparable Baltimore's residential per-sq-ft rate is unpublished
Confidence / currency Howard (FY2026 schedule) Baltimore's published schedule dates to November 2018
Solar / fence Baltimore lists flat fees ($79 / $25) Howard routes solar through a separate electrical permit

On additions, Baltimore County is the cheaper of the two at every comparable size, because its flat fees ignore square footage and it adds no technology fee. The trade-off is currency: Howard's FY2026 schedule is current, while Baltimore County's is dated November 2018, so its figures should be confirmed with PAI before you rely on them.

Practitioner Insight

For additions, this comparison has a clear winner: Baltimore County's flat fees - $85 up to 600 square feet, $130 over - are simply lower than Howard County's per-square-foot charge of $0.25 plus a $50 filing fee and a 10% technology fee, and the gap grows as the addition gets bigger. Baltimore County's flat-by-size-band approach also makes budgeting trivial: there is no square-footage math, and a 200 or 600 square foot addition pays the same fee. Two cautions keep this from being a slam dunk. First, Baltimore County's published fee schedule is dated November 26, 2018, the oldest of any verified Maryland county on this site, so the $85 and $130 figures should be confirmed with the Department of Permits, Approvals and Inspections at 410-887-3900. Second, new construction is genuinely not comparable: Howard's $0.25/sq ft yields a clean number, but Baltimore County only publishes a Category D $231 minimum without the residential per-square-foot rate, so we do not put a Baltimore new-home total head-to-head. Howard County's schedule (410-313-2455) is current as of July 1, 2025.

Frequently Asked Questions

Baltimore County is cheaper for an addition. A 400 sq ft addition is a flat $85 in Baltimore County vs about $160 in Howard County; an 800 sq ft addition is a flat $130 vs about $270. Baltimore County charges flat fees by size band, while Howard charges $0.25 per square foot plus a $50 filing fee and a 10% technology fee. Note Baltimore County's schedule dates to 2018.
Howard County prices a new house at $0.25 per square foot, which gives a clear number (about $810 for a 2,400 sq ft house). Baltimore County's fee schedule lists residential new construction under Fee Category D with a $231 minimum but does not publish the per-square-foot rate that applies above the minimum, so we cannot compute a comparable Baltimore new-home total. We do not publish a single Baltimore new-home figure to avoid implying a number the schedule does not state.
Howard adds a 10% technology fee on the permit fee; Baltimore County does not add a technology fee. Neither county adds a statewide Maryland levy - Maryland has no equivalent of Virginia's 2% USBC levy. The $50 Maryland Home Builder Guaranty Fund fee applies to new-home permits in both counties.
Baltimore County's published building permit fee schedule is dated effective November 26, 2018 - over seven years old and the oldest of any verified Maryland county on this site. It is the version currently served on the county PAI website, but you should confirm the $85, $130, and other figures with PAI at 410-887-3900 before relying on them for a budget.
Howard County's fee schedule is current, effective July 1, 2025 (FY2026). Baltimore County's published schedule is dated November 26, 2018, so a source-age caveat applies. See the Howard County and Baltimore County pages for full detail.

Sources

Official Sources
Next Step

See each county's full fee page, or compare more Maryland jurisdictions.

Verify current fees with each county before budgeting or filing. Howard County DILP: 410-313-2455. Baltimore County PAI: 410-887-3900 (November 2018 schedule - confirm current rates).
Disclaimer: All fee information on PermitPrice is informational only and not an official permit quotation. Actual fees are determined by each county at the time of application. Baltimore County's published schedule is dated November 26, 2018; its residential new-construction per-square-foot rate is unpublished, so no Baltimore new-home total is shown. Impact, excise, and school facility charges and trade permits are excluded from the figures on this page.

Written by: Munib Ur Rehman

Data verified against official fee schedule documents.