Demolition Permit Cost in Lubbock, TX (2026)

Demolition permit fees for the City of Lubbock, Texas (Lubbock County, West Texas), pulled directly from the Building Safety Fee Schedule for fiscal year October 1, 2025 - September 30, 2026 (Adopted Budget Ordinance No. 2024-O0111). The schedule prints one residential demolition line: Demolition = $75.00, which is also the schedule's $75.00 citywide minimum permit fee. Demolition is a flat fee that does not scale with the size of the building - a small detached garage and a full house carry the same $75.00 line. There is no technology surcharge and no percentage add-on, and Texas has no statewide permit levy, so the printed $75.00 is the full city permit fee. The adopted schedule is current - it is the fiscal year in effect.

Residential Demolition Fee
$75.00 flat (exact printed line)
Relationship to Minimum Fee
Equals the $75.00 citywide minimum permit fee
Scales With Building Size?
No - flat $75.00 regardless of square footage
Technology / Percentage Surcharge
None - $75.00 is the full city permit fee
State Percentage Levy
None - Texas has no statewide permit levy
Fee Schedule Effective
FY Oct 1, 2025 - Sept 30, 2026 - current
What This Guide Covers - and What It Does Not

This guide covers: The City of Lubbock, Texas (Lubbock County) residential building demolition permit fee as printed on the Building Safety Fee Schedule (FY Oct 1, 2025 - Sept 30, 2026) - "Demolition" at a flat $75.00, which equals the schedule's citywide minimum permit fee. That $75.00 figure is exact from the published schedule. There is no technology surcharge or percentage add-on, so the printed $75.00 is the full city permit fee.

The fee is flat - it does not scale with building size: the schedule charges $75.00 for a residential demolition regardless of the structure's square footage. A detached garage, a shed, and a full single-family house are all the same $75.00 line. Lubbock's per-square-foot pricing applies to new construction, additions, and alterations, not to a demolition.

Lubbock's building permit covers the building trade only: unlike some Texas cities, Lubbock issues electrical, mechanical, and plumbing as separate permits. A demolition itself is a single $75.00 building-side line; if a utility must be capped under an electrical or plumbing permit, that would be billed separately (each subject to its own $75.00 minimum). The 25% plan review the schedule prints is explicitly for commercial permits, not a residential demolition.

This guide does NOT cover: utility disconnections and cut/cap charges (electric, water, sewer, and gas usually must be disconnected before demolition); asbestos survey and notification requirements (a state and federal requirement under Texas and EPA NESHAP rules, handled outside the city permit); septic-system abandonment; Engineering, Planning, Environmental Health, and Fire Marshal fees on their own separate schedules; right-of-way and dumpster/roll-off placement permits; interior-only strip-out tied to a remodel (which may fall under the per-square-foot alteration line instead of this demolition line); impact fees; and the contractor's actual teardown, hauling, and disposal costs.

Key Takeaways
  • Lubbock, Texas prints one residential demolition line - "Demolition" at a flat $75.00 - on the Building Safety Fee Schedule (FY Oct 1, 2025 - Sept 30, 2026). That $75.00 is the exact printed figure, and it equals the schedule's citywide minimum permit fee.
  • The fee is flat and does not scale with building size: a detached garage, a shed, and a full house are all the same $75.00 line. Lubbock's per-square-foot pricing applies to new construction, additions, and alterations, not to a demolition.
  • There is no technology surcharge and no percentage add-on, and Texas has no statewide permit levy, so the printed $75.00 is the full city permit fee.
  • Lubbock's building permit covers the building trade only - electrical, mechanical, and plumbing are separate permits (each with its own $75.00 minimum). The 25% plan review on the schedule is for commercial permits, not a residential demolition.
  • Bigger costs usually sit outside the permit: utility disconnections and cut/cap charges, a required asbestos survey, septic abandonment, and the contractor's teardown, hauling, and disposal are all separate from the $75.00 city fee.
  • The adopted schedule is current (fiscal year October 1, 2025 - September 30, 2026). For same-city context, see the Lubbock driveway permit guide and the Lubbock fence permit guide.

Lubbock Demolition Fee Structure

The residential demolition permit is a single flat line at $75.00 - the exact printed rate, which also equals the schedule's citywide minimum permit fee, the same for any size of building. There is no per-square-foot component, no technology surcharge, and no percentage add-on, and Texas has no statewide levy, so the printed $75.00 is the full city permit fee. Lubbock's building permit covers the building trade only, and the 25% plan review is written for commercial permits, so both are shown below in context. Every line in the table is exactly as printed on the schedule.

Item Fee How It Is Calculated
Demolition permit (residential) $75.00 flat Exact flat line on the schedule. The same $75.00 applies to a garage, a shed, or a full house - it does not scale with square footage.
Minimum permit fee $75.00 The schedule's citywide minimum permit fee is $75.00. The demolition line equals it, so there is nothing added to bring it up to a minimum.
Technology / percentage surcharge None Lubbock lists no technology surcharge or percentage add-on, so $75.00 is the full city permit fee.
Plan review (25% commercial) Not added The 25% plan-review fee is explicitly for commercial building permits. It does not attach to a residential demolition.
Electrical / mechanical / plumbing Separate ($75 min each) Lubbock issues trade permits separately. A demolition is a building-side line; if a utility cap requires a trade permit, that is billed separately, each subject to the $75.00 minimum.
Utility cut/cap & asbestos survey Separate Electric, water, sewer, and gas disconnections and a required asbestos survey are handled outside this permit line. Not part of the $75.00.
State percentage levy None Texas has no statewide permit levy. There is no percentage add-on to the Lubbock demolition fee.

Source: City of Lubbock (TX) Building Safety Fee Schedule, fiscal year October 1, 2025 - September 30, 2026 (Adopted Budget Ordinance No. 2024-O0111). The flat $75.00 residential demolition permit, the $75.00 citywide minimum permit fee, and the commercial 25% plan review all appear on the schedule. Lubbock's building permit covers the building trade only; electrical, mechanical, and plumbing are separately issued permits - confirm the current rate with the Department of Building Safety before budgeting.

Worked Examples - Real Demolition Projects in Lubbock

Because the residential demolition permit is a flat $75.00, the building line is the same whether you are tearing down a shed or a whole house - the size of the structure does not change the fee. The examples below show where the flat $75.00 applies and where a different line may apply instead. Every figure is the exact printed line from the published schedule.

Example 1: Detached garage or accessory building

A homeowner tears down an old detached garage. Demolition is a flat fee, so building size does not matter.

  • Residential demolition line: $75.00
  • Technology / percentage surcharge: none
  • Permit total: $75.00

The $75.00 line is exact and is the full city permit fee. Utility disconnections and hauling are separate.

Example 2: Full single-family house teardown

A full house demolition ahead of a rebuild - the same flat $75.00 line as the garage.

  • Residential demolition line: $75.00
  • Same flat fee - the schedule does not scale demolition by square footage
  • Permit total: $75.00

Same $75.00 permit as a small structure. A house teardown carries much larger separate costs - utility cut/cap, asbestos survey, and disposal - none of which are in the $75.00 city fee.

Example 3: Interior-only strip-out for a remodel

A homeowner guts a kitchen and bath down to the studs but keeps the house standing.

  • This may not be a "demolition" at all: interior-only strip-out tied to a remodel commonly falls under Lubbock's alteration/remodel line at $0.15 / sq ft of work area (subject to the $75.00 minimum), not the $75.00 demolition line.
  • Which line applies is a department determination - confirm before you file.

The flat $75.00 line is for demolishing a building or structure. A gut-remodel that keeps the building may be permitted as an alteration instead - ask the Department of Building Safety which applies to your scope.

When This Estimate May Not Apply

The flat $75.00 covers the residential demolition permit line as printed. Route your project to the Department of Building Safety before relying on this figure if any of the following applies:

  • You are gutting the interior but keeping the building. An interior-only strip-out for a remodel commonly falls under Lubbock's alteration/remodel line at $0.15 per square foot of work area (subject to the $75.00 minimum), not the flat $75.00 demolition line. Confirm which the department applies.
  • A utility cap requires a trade permit. Lubbock issues electrical, mechanical, and plumbing separately. If capping a service requires a trade permit, that is a separate charge, each subject to the $75.00 minimum.
  • Your project is commercial. Commercial building permits are priced differently and add a 25% plan review. This guide covers the residential demolition line only.
  • The fiscal-year schedule has been superseded. These fees are from the FY October 1, 2025 - September 30, 2026 schedule. Lubbock adopts a new fee schedule each fiscal year - confirm the current rate before budgeting.
  • The structure may contain asbestos. A pre-demolition asbestos survey and notification are required by state and federal (EPA NESHAP) rules for many structures - handled outside the city permit and not in this estimate.
  • Site work is involved. Utility disconnections, septic abandonment, right-of-way or roll-off dumpster placement, and fees on the Engineering, Planning, Environmental Health, or Fire Marshal schedules may each carry separate requirements or fees.

Utility disconnections, asbestos survey and abatement, septic abandonment, Engineering/Planning/Environmental Health/Fire Marshal fees, right-of-way and dumpster permits, impact fees, and the contractor's teardown, hauling, and disposal costs are excluded from the figure on this page, and the page-standard disclaimer applies. Always verify the current rate with the Lubbock Department of Building Safety before budgeting.

Lubbock Demolition Permit Cost vs Other Verified Texas Cities

Texas cities price residential demolition differently, and several print a single flat fee. Scope differs, so each figure below notes its basis, and each department should be verified separately.

City Demolition Fee Basis Residential Demolition Permit
Lubbock, TX Flat line = $75 minimum fee $75.00 flat
Frisco, TX Flat "demolition permit" line $50.00 flat
Grand Prairie, TX Flat "demolition permit" line $50.00 flat
New Braunfels, TX Flat line + 3% tech fee $100.00 (~$103-$139 all-in)

Scope note: all four cities print a flat demolition fee. Frisco and Grand Prairie are the lowest at $50.00, Lubbock prints $75.00 (its citywide minimum permit fee), and New Braunfels prints $100.00 plus a 3% technology fee. None of these include utility cut/cap, asbestos survey, or hauling. Compare the basis, not just the number, and confirm current figures with each department.

Next Step

See Lubbock's full residential fee schedule, or price other Lubbock projects.

Frequently Asked Questions

The residential demolition permit is a flat $75.00 on the Lubbock Building Safety Fee Schedule - the exact printed rate, which also equals the schedule's citywide minimum permit fee, the same for any size of building. There is no technology surcharge or percentage add-on and Texas has no statewide levy, so $75.00 is the full city permit fee. The schedule is current for fiscal year October 1, 2025 - September 30, 2026.
Lubbock prints "Demolition" as a flat $75.00 line, and the schedule's citywide minimum permit fee is also $75.00. Because the demolition line already equals the minimum, there is nothing added to bring it up to a floor - the two figures are simply the same $75.00. A number of Lubbock's small flat residential permits (fence, re-roof, flatwork, foundation) are also set at the $75.00 minimum.
No. The residential demolition line is a flat $75.00 regardless of square footage, so a small detached garage and a full single-family house carry the same permit fee. Lubbock's per-square-foot pricing applies to new construction, additions, and alterations, not to a demolition.
Often not as a "demolition." The flat $75.00 line is for demolishing a building or structure. An interior-only strip-out that keeps the house standing is commonly permitted under Lubbock's alteration line at $0.15 per square foot of work area (subject to the $75.00 minimum) instead. Which line applies is a department determination, so confirm your scope with the Department of Building Safety before filing.
Most of the real teardown cost. The $75.00 permit does not include utility disconnections and cut/cap charges (electric, water, sewer, gas), a required pre-demolition asbestos survey, septic-system abandonment, right-of-way or roll-off dumpster permits, or the contractor's demolition, hauling, and disposal. Trade permits (electrical, mechanical, plumbing) are separate, each subject to the $75.00 minimum. Budget those separately - they typically dwarf the city permit fee.
Often, yes - but that requirement comes from state and federal rules (Texas asbestos regulations and the EPA NESHAP program), not from this city fee line. Many structures must be surveyed for asbestos and, where present, have it abated before demolition, with notification filed. It is a separate process and cost outside the $75.00 Lubbock permit. Confirm the current requirements with the appropriate agency and your contractor.
No. Lubbock issues electrical, mechanical, and plumbing as separate permits from the building permit, each subject to its own $75.00 minimum. The $75.00 demolition line is a building-side permit. If capping electric, gas, water, or sewer requires a trade permit, that is a separate charge - confirm with the department and your utility provider which disconnects are needed.
They come from the Building Safety Fee Schedule for fiscal year October 1, 2025 - September 30, 2026 (Adopted Budget Ordinance No. 2024-O0111), which is the fiscal year in effect - so the schedule is current. Lubbock adopts a new fee schedule each fiscal year, so confirm the current rate with the Department of Building Safety. See all Lubbock permit fees and all Texas cities.

Who to Contact

Department City of Lubbock, Texas - Department of Building Safety
County Lubbock County, Texas (West Texas / South Plains)
Phone 806-775-2087 / 806-775-3155
Address 1314 Avenue K, 1st Floor Annex, Lubbock, TX 79401
Ask them Whether your interior strip-out is a demolition or an alteration, which utility cut/cap and trade-permit steps are required, what asbestos-survey steps apply, and whether a new fiscal-year fee schedule has superseded FY 2025-2026
Fee schedule City of Lubbock Building Safety Fee Schedule, FY 2025-2026 (PDF)

Sources

Official Sources - Recorded September 2026
  • City of Lubbock, TX - Building Safety Fee Schedule (FY 2025-2026, PDF) Lubbock, TX (Lubbock County) - official Building Safety Fee Schedule for fiscal year October 1, 2025 - September 30, 2026 (Adopted Budget Ordinance No. 2024-O0111). Primary source for the flat $75.00 residential demolition permit, the $75.00 citywide minimum permit fee, the building-trade-only scope, and the commercial 25% plan review Verified
  • Texas Local Government Code, Chapter 214 Texas statute (.gov) confirming municipal building- and demolition-regulation authority and that Texas imposes no statewide percentage building-permit levy. Context for the "no statewide levy" statement. Verified September 2026.
Always verify current demolition permit fees directly with the City of Lubbock (TX) Department of Building Safety before budgeting or filing. The figures on this page come from the Building Safety Fee Schedule for fiscal year October 1, 2025 - September 30, 2026 (Adopted Budget Ordinance No. 2024-O0111). The schedule prints a flat $75.00 residential demolition permit, which equals the citywide $75.00 minimum permit fee, with no technology surcharge or percentage add-on, so $75.00 is the full city permit fee; Texas has no statewide levy. Lubbock's building permit covers the building trade only; electrical, mechanical, and plumbing are separate permits. Utility disconnections, an asbestos survey, and hauling are separate and often far larger. Lubbock adopts a new fee schedule each fiscal year, so confirm the current rate before submitting.
Disclaimer: All fee information on PermitPrice is for informational purposes only and is not an official permit quotation. Actual permit fees are determined by the City of Lubbock, Texas Department of Building Safety at the time of application. The flat $75.00 residential demolition permit, the $75.00 citywide minimum permit fee, and the commercial 25% plan review are as printed on the Building Safety Fee Schedule for fiscal year October 1, 2025 - September 30, 2026 (Adopted Budget Ordinance No. 2024-O0111). The $75.00 demolition line is exact and does not scale with building size; it equals the citywide minimum permit fee, and there is no technology surcharge or percentage add-on, so $75.00 is the full city permit fee; Texas has no statewide levy. Lubbock's building permit covers the building trade only - electrical, mechanical, and plumbing are separate permits, each subject to the $75.00 minimum - and the 25% plan review is for commercial permits, so neither is added to a residential demolition. Utility disconnections and cut/cap charges, a required asbestos survey and any abatement, septic abandonment, Engineering, Planning, Environmental Health, and Fire Marshal fees, right-of-way and dumpster permits, impact fees, and the contractor's teardown, hauling, and disposal costs are separate and excluded. Verify all fees directly with the department before filing.

Written by: Munib Ur Rehman

Data verified against official fee schedule documents.