Demolition permit fees for the City of Frisco, Texas (Collin and Denton counties), pulled directly from the Permit, Inspection and Miscellaneous Consolidated Fee Schedule (footer "Updated 10-7-2025"). The schedule prints one residential demolition line: Demolition permit = $50.00. Unlike Frisco's new-construction and deck lines, which are priced per square foot, demolition is a flat fee that does not scale with the size of the building - a small detached garage and a full house carry the same $50.00 line. There is no technology fee and no percentage surcharge on the demolition line, and Texas has no statewide permit levy, so the printed $50.00 is the full city permit fee. The $300.00 non-refundable application fee is printed for new construction and additions, not a stand-alone demolition, so it is not added here. One currency note controls this page: Frisco's own citywide fee page references a successor schedule dated March 2, 2026, while Building Inspections still links the 10-7-2025 schedule as the active building-permit document - confirm before you file.
This guide covers: The City of Frisco, Texas (Collin and Denton counties) residential building demolition permit fee as printed on the Permit, Inspection and Miscellaneous Consolidated Fee Schedule (Updated 10-7-2025) - "Demolition permit" at a flat $50.00. That $50.00 figure is exact from the published schedule. There is no technology fee or percentage surcharge on the line, so the printed $50.00 is the full city permit fee.
The fee is flat - it does not scale with building size: the schedule charges $50.00 for a residential building demolition regardless of the structure's square footage. A detached garage, a shed, and a full single-family house are all the same $50.00 line. Frisco's per-square-foot pricing applies to new construction, additions, decks, and general alterations - not to a demolition. The same schedule prints a separate "Pool demolition" line, also $50.00.
The $300.00 non-refundable application fee is not added: the schedule prints a $300.00 non-refundable application fee for residential new construction and additions (and $50.00 for alterations), described verbatim as "not an additional permit fee but a non-refundable portion of the same building permit fee." A stand-alone demolition is neither new construction nor an addition, so that fee is excluded here.
This guide does NOT cover: utility disconnections and cut/cap charges (electric, water, sewer, and gas usually must be disconnected before demolition); asbestos survey and notification requirements (a state and federal requirement under Texas and EPA NESHAP rules, handled outside the city permit); septic-system abandonment; tree-preservation, erosion-control, and floodplain review; right-of-way and dumpster/roll-off placement permits; interior-only strip-out tied to a remodel (which may fall under Frisco's general-alterations line at $75 + $0.45 per gross square foot instead of this demolition line); impact and development fees; any separate Collin or Denton county fees; and the contractor's actual teardown, hauling, and disposal costs.
A residential demolition permit in Frisco, TX is a flat $50.00 on the Permit, Inspection and Miscellaneous Consolidated Fee Schedule - the exact printed rate, and it does not change with the size of the building. There is no technology fee or percentage surcharge on the demolition line, and Texas has no statewide levy, so $50.00 is the full city permit fee. The $300.00 non-refundable application fee is printed for new construction and additions, not a stand-alone demolition, so it is not added. Utility disconnections, an asbestos survey, and hauling costs are separate. Frisco's citywide fee page references a March 2, 2026 successor schedule while Building Inspections still links the 10-7-2025 document - confirm the current rate with the Building Inspections Division before budgeting.
- Frisco, Texas prints one residential demolition line - "Demolition permit" at a flat $50.00 - on the Permit, Inspection and Miscellaneous Consolidated Fee Schedule (Updated 10-7-2025). That $50.00 is the exact printed figure.
- The fee is flat and does not scale with building size: a detached garage, a shed, and a full house are all the same $50.00 line. Frisco's per-square-foot pricing applies to new construction, additions, decks, and general alterations, not to a demolition.
- There is no technology fee and no percentage surcharge on the demolition line, and Texas has no statewide permit levy, so the printed $50.00 is the full city permit fee - there is nothing to add on top of it.
- The $300.00 non-refundable application fee is printed for residential new construction and additions (and $50.00 for alterations), not for a stand-alone demolition, so it is not added to this estimate.
- Bigger costs usually sit outside the permit: utility disconnections and cut/cap charges, a required asbestos survey, septic abandonment, tree and erosion control, and the contractor's teardown, hauling, and disposal are all separate from the $50.00 city fee.
- Confirm currency before filing: Frisco's citywide fee page references a March 2, 2026 successor schedule while Building Inspections still links the 10-7-2025 document. For same-city context, see the Frisco shed permit guide and the Frisco deck permit guide.
Frisco Demolition Fee Structure
The residential demolition permit is a single flat line at $50.00 - the exact printed rate, the same for any size of building. There is no per-square-foot component, no technology fee, and no percentage surcharge on the demolition line, and Texas has no statewide levy, so the printed $50.00 is the full city permit fee. The $300.00 non-refundable application fee and Frisco's per-square-foot pricing are written for new construction and additions, so they are shown below as NOT added to a demolition. Every line in the table is exactly as printed on the schedule.
| Item | Fee | How It Is Calculated |
|---|---|---|
| Demolition permit (residential) | $50.00 flat | Exact flat line on the schedule. The same $50.00 applies to a garage, a shed, or a full house - it does not scale with square footage. |
| Pool demolition | $50.00 flat | Separate printed line for demolishing a pool, also flat $50.00. Shown for context; it is a distinct permit from a building demolition. |
| Technology / percentage surcharge | None | Frisco lists no technology fee or percentage surcharge on the demolition line, so $50.00 is the full city permit fee. |
| Non-refundable application fee | $300.00 - not added | Printed for residential new construction and additions ($50.00 for alterations), described as a non-refundable portion of the building permit fee. A demolition is none of those, so it is excluded. |
| Per-square-foot pricing | Not applicable | Frisco's tiered per-gross-square-foot pricing applies to new construction, additions, decks, and general alterations, not to the flat demolition line. |
| Utility cut/cap & asbestos survey | Separate | Electric, water, sewer, and gas disconnections and a required asbestos survey are handled outside this permit line. Not part of the $50.00. |
| State percentage levy | None | Texas has no statewide permit levy. There is no percentage add-on to the Frisco demolition fee. |
Source: City of Frisco (TX) Permit, Inspection and Miscellaneous Consolidated Fee Schedule, footer "Updated 10-7-2025." The flat $50.00 residential demolition permit, the separate $50.00 pool-demolition line, and the $300.00 non-refundable application fee (for new construction/additions) all appear on the city schedule. Frisco's own citywide fee page references a successor schedule effective March 2, 2026 while Building Inspections still links the 10-7-2025 document - confirm the current rate with the Building Inspections Division before budgeting.
Worked Examples - Real Demolition Projects in Frisco
Because the residential demolition permit is a flat $50.00, the building line is the same whether you are tearing down a shed or a whole house - the size of the structure does not change the fee. The examples below show where the flat $50.00 applies and where a different line may apply instead. Every figure is the exact printed line from the published schedule.
A homeowner tears down an old detached garage. Demolition is a flat fee, so building size does not matter.
- Residential demolition line: $50.00
- Technology fee / percentage surcharge: none
- Permit total: $50.00
The $50.00 line is exact and is the full city permit fee. Utility disconnections and hauling are separate.
A full house demolition ahead of a rebuild - the same flat $50.00 line as the garage.
- Residential demolition line: $50.00
- Same flat fee - the schedule does not scale demolition by square footage
- Permit total: $50.00
Same $50.00 permit as a small structure. A house teardown carries much larger separate costs - utility cut/cap, asbestos survey, and disposal - none of which are in the $50.00 city fee.
A homeowner guts a kitchen and bath down to the studs but keeps the house standing.
- This may not be a "building demolition" at all: interior-only strip-out tied to a remodel commonly falls under Frisco's general-alterations line at $75 + $0.45 / gross sq ft (max $550), not the $50.00 demolition line.
- Which line applies is a department determination - confirm before you file.
The flat $50.00 line is for demolishing a building or structure. A gut-remodel that keeps the building may be permitted as a general alteration instead - ask the Building Inspections Division which applies to your scope.
When This Estimate May Not Apply
The flat $50.00 covers the residential building demolition permit line as printed. Route your project to the Building Inspections Division before relying on this figure if any of the following applies:
- You are gutting the interior but keeping the building. An interior-only strip-out for a remodel commonly falls under Frisco's general-alterations line at $75 + $0.45 per gross square foot (max $550), not the flat $50.00 demolition line. Confirm which the department applies.
- The active schedule has changed. Frisco's citywide fee page references a successor consolidated fee schedule effective March 2, 2026, while Building Inspections still links the 10-7-2025 document as the active building-permit schedule. Confirm the current rate before budgeting.
- Utilities are still connected. Electric, water, sewer, and gas usually must be disconnected before a teardown, and utility cut/cap charges are separate from the $50.00 permit.
- The structure may contain asbestos. A pre-demolition asbestos survey and notification are required by state and federal (EPA NESHAP) rules for many structures - handled outside the city permit and not in this estimate.
- Site work is involved. Septic abandonment, tree preservation and erosion control, floodplain review, and right-of-way or roll-off dumpster placement may each carry separate requirements or fees.
- Your project is commercial. This guide covers the residential demolition line; commercial teardowns should be confirmed directly with the department.
Utility disconnections, asbestos survey and abatement, septic abandonment, erosion and tree-protection review, right-of-way and dumpster permits, impact and development fees, any Collin or Denton county fees, and the contractor's teardown, hauling, and disposal costs are excluded from the figure on this page, and the page-standard disclaimer applies. Always verify the current rate with the Frisco Building Inspections Division before budgeting.
Frisco Demolition Permit Cost vs Other Verified Texas Cities
Texas cities price residential demolition differently, and several print a single flat fee. Scope differs, so each figure below notes its basis, and each department should be verified separately.
| City | Demolition Fee Basis | Residential Demolition Permit |
|---|---|---|
| Frisco, TX | Flat demolition line, no surcharge | $50.00 flat |
| Grand Prairie, TX | Flat "demolition permit" line | $50.00 flat |
| Lubbock, TX | Flat line = $75 minimum fee | $75.00 flat |
| New Braunfels, TX | Flat line + 3% tech fee | $100.00 (~$103-$139 all-in) |
Scope note: all four cities print a flat demolition fee, and Frisco ties Grand Prairie for the lowest at $50.00 with no surcharge. Lubbock prints a flat $75.00 (its citywide minimum permit fee), and New Braunfels prints a flat $100.00 plus a 3% technology fee. None of these include utility cut/cap, asbestos survey, or hauling. Compare the basis, not just the number, and confirm current figures with each department - Frisco's active schedule may change with the referenced March 2, 2026 successor.
See Frisco's full residential fee schedule, or price other Frisco projects.
Frequently Asked Questions
Who to Contact
| Department | City of Frisco, Texas - Development Services Department, Building Inspections Division |
| County | Collin and Denton counties, Texas (DFW Metroplex) |
| Phone | 972-292-5301 |
| Address | George A. Purefoy Municipal Center, 6101 Frisco Square Boulevard, 3rd Floor, Frisco, TX 75034 |
| Ask them | Whether the 10-7-2025 schedule or the referenced March 2, 2026 successor is the current active fee document, whether your interior strip-out is a demolition or a general alteration, and what utility cut/cap and asbestos-survey steps are required |
| Fee schedule | City of Frisco Permit, Inspection and Miscellaneous Consolidated Fee Schedule (PDF) |
Sources
-
City of Frisco, TX - Permit, Inspection and Miscellaneous Consolidated Fee Schedule (PDF) Frisco, TX (Collin and Denton counties) - official consolidated fee schedule, footer "Updated 10-7-2025." Primary source for the flat $50.00 residential demolition permit, the separate $50.00 pool-demolition line, and the $300.00 non-refundable application fee for new construction/additions. Building Inspections links this document as the active building-permit schedule; the citywide fee page references a March 2, 2026 successor Updated 10-7-2025 - confirm 2026 successor
-
Texas Local Government Code, Chapter 214 Texas statute (.gov) confirming municipal building- and demolition-regulation authority and that Texas imposes no statewide percentage building-permit levy. Context for the "no statewide levy" statement. Verified September 2026.