Deck Permit Cost in Killeen, TX (2026)
Residential deck permit fees for the City of Killeen, Texas, pulled directly from the Development Services permit fee schedule effective October 1, 2025 to September 30, 2026. Killeen prices an uncovered deck as a flat $70.00 permit fee - any size, any project value - plus a $10.00 technology/application fee charged per application, for an all-in total of $80.00. Texas has no statewide permit levy and Killeen adds no city surcharge. One important scope note up front: covered decks and roofed patio covers are NOT itemized as a separate flat line on the Killeen schedule - whether a covered or attached deck falls under the residential addition line ($0.20 per square foot, $200 minimum, plus $0.04 per square foot plan review) is a department classification call. For a covered deck, call Building Inspections at 254-501-7762 before budgeting.
This guide covers: City of Killeen, Texas (Bell County) residential deck permit fees as published on the Development Services permit fee schedule effective October 1, 2025 to September 30, 2026. An uncovered deck is a flat $70.00 permit fee regardless of size or project value, plus the $10.00 technology/application fee charged per application - $80.00 all-in. The deck line is asterisked on the schedule; the $10.00 fee applies per application and supports the city's online-permitting transition.
Covered decks are a classification question, not a fee lookup: the schedule has no separate flat line for a covered deck or roofed patio cover. Its residential per-square-foot line - "New and Additions: Single Family, Duplex, and Townhouse" at $0.20 per square foot (minimum $200) plus $0.04 per square foot plan review plus the $10 tech fee - may or may not apply to a covered or attached deck depending on how the department classifies the project. This guide does not print a computed covered-deck total, because the classification is the department's call. Call 254-501-7762 for a covered deck.
This guide does NOT cover: Deck contractor labor and material costs. HOA architectural approvals. Covered-deck or patio-cover totals (see the classification note above). Impact or tap fees - they do not apply to this schedule's deck line, though the page-standard disclaimer still applies. Whether your specific deck triggers other review - route structural or attachment questions to Building Inspections at 254-501-7762 before filing.
Source-currency note: the figures come from the official permit fee schedule PDF marked effective October 1, 2025 to September 30, 2026 (the current FY2026 schedule). Rates can change at the fiscal-year rollover - confirm with Building Inspections at 254-501-7762 if you are filing on or after October 1, 2026.
A Killeen, TX permit for an uncovered deck costs $80.00 all-in: a flat $70.00 permit fee at any size or project value, plus a $10.00 technology/application fee charged per application. Texas adds no state levy. Covered decks and roofed patio covers are not itemized as a separate flat line on the schedule - classification is the department's call, so call Building Inspections at 254-501-7762 before budgeting a covered deck. Figures are from the official fee schedule effective October 1, 2025 to September 30, 2026.
- Killeen prices an uncovered deck as a flat $70.00 permit fee - a 100 sq ft deck and a 600 sq ft deck pay the same, and an $8,000 project and a $20,000 project pay the same. Neither size nor value changes the fee.
- Every application carries a $10.00 technology/application fee (the deck line is asterisked on the schedule; the fee supports the city's online-permitting transition), so the real all-in uncovered-deck number is $80.00, not $70.00.
- Covered decks and roofed patio covers have NO separate flat line on the Killeen schedule. Whether a covered or attached deck falls under the residential addition line ($0.20/sq ft, $200 minimum, plus $0.04/sq ft plan review) is a department classification call - this guide deliberately prints no covered-deck total. Call 254-501-7762.
- Adding standalone trade work changes the math: a standalone electrical permit is $50.00 plus its own $10.00 tech fee ($60.00), and a $90.00 plan review applies when two or more permit types are requested at the same time.
- Texas has no statewide percentage permit levy - unlike Virginia's 2% USBC add-on - and Killeen adds no city surcharge on top of the schedule fees.
- For context: Killeen's $80.00 all-in uncovered deck is cheaper than Round Rock's $125 flat uncovered-deck fee and Frederick County, MD's $157 all-in deck permit (500 sq ft or under, effective July 1, 2026).
- The figures come from the official Killeen permit fee schedule effective October 1, 2025 to September 30, 2026 - a dated, current FY2026 document. Confirm with Building Inspections at 254-501-7762 if filing after the fiscal-year rollover.
Killeen Deck Permit Fee Structure
Killeen prices an uncovered deck as a single flat line plus a per-application technology fee. There is no per-square-foot rate and no valuation formula on the uncovered-deck line - the only variables are whether the deck is covered (a classification call, see below) and whether the project adds standalone trade permits.
| Item | Permit Fee | How It Is Calculated |
|---|---|---|
| Uncovered deck | $70.00 | Flat fee per permit. Applies regardless of size or project value. |
| Technology / application fee | $10.00 | Charged per application (the deck line is asterisked on the schedule); supports the city's online-permitting transition. |
| All-in uncovered deck total | $80.00 | $70.00 permit fee + $10.00 tech/application fee. |
| Covered deck / roofed patio cover | Not itemized | No separate flat line on the schedule. Whether it falls under the residential addition line ($0.20/sq ft, $200 minimum, plus $0.04/sq ft plan review plus $10 tech) is a department classification call - call 254-501-7762. |
| Standalone electrical permit (e.g. hot tub circuit) | $50.00 + $10.00 = $60.00 | Standalone electrical permit fee plus its own tech/application fee. |
| Plan review (multiple permit types) | $90.00 | Applies when two or more permit types are requested at the same time. |
| Failed inspection penalty | $50.00 | Per occurrence, for failed inspections. |
| State / city percentage levy | None | Texas has no statewide permit levy; Killeen adds no city surcharge. |
Source: City of Killeen Development Services Permit Fees, effective October 1, 2025 to September 30, 2026 (current FY2026 schedule). Confirm rates with Building Inspections at 254-501-7762, especially if filing on or after October 1, 2026.
Worked Examples - Real Deck Projects in Killeen
Because Killeen's uncovered-deck line is flat, the square footage and project value never change the fee. The only things that move the total are additional permit types and the plan-review trigger.
A homeowner builds a 200 sq ft pressure-treated wood deck off the back door, valued at $8,000. No roof or cover, no electrical, no plumbing.
- Uncovered deck permit: flat fee = $70.00
- Technology/application fee: $10.00
- Texas state levy: $0.00 (none)
- Total all-in deck permit: $80.00
Neither the 200 sq ft footprint nor the $8,000 project value affects the fee - the uncovered-deck line does not scale with size or value.
A homeowner builds a large 500 sq ft uncovered deck - two and a half times the footprint of Example 1.
- Uncovered deck permit: flat fee = $70.00
- Technology/application fee: $10.00
- Texas state levy: $0.00 (none)
- Total all-in deck permit: $80.00
Still $80.00 - the fee is flat. A 500 sq ft uncovered deck pays exactly what a 200 sq ft uncovered deck pays.
A homeowner builds an uncovered deck and adds a standalone electrical permit for a hot tub circuit. This is a two-permit scenario, and the total depends on how the permits are filed.
- Uncovered deck permit + tech fee: $80.00 ($70.00 + $10.00)
- Standalone electrical permit + tech fee: $60.00 ($50.00 + $10.00)
- Subtotal, two permits: $140.00
- Plan review IF two or more permit types are requested at the same time: $90.00
- Scenario total with simultaneous filing: $230.00
Scenario-dependent: the $90.00 plan review is quoted from the schedule and applies "when two or more permit types are requested at the same time." If the plan-review trigger does not apply to your filing, the two-permit subtotal is $140.00. Confirm how your specific filing is handled with Building Inspections at 254-501-7762.
When This Estimate May Not Apply
The $80.00 all-in figure covers the standard uncovered residential deck case on the FY2026 schedule. Route your project to Building Inspections at 254-501-7762 before relying on these figures if any of the following applies:
- The deck is covered or has a roofed patio cover. Covered decks are not itemized as a separate flat line on the Killeen schedule. Whether the project is classified under the residential addition line ($0.20/sq ft, $200 minimum, plus $0.04/sq ft plan review plus $10 tech) is the department's call - this guide prints no covered-deck total for that reason.
- The project is really a room addition or enclosed sunroom. Enclosing a deck or patio into conditioned space is an addition, priced by the per-square-foot residential line, not the flat deck line.
- The project adds standalone trade permits. A standalone electrical permit is $50.00 plus $10.00 tech ($60.00), and a $90.00 plan review applies when two or more permit types are requested at the same time - see the scenario-dependent worked example above.
- An inspection fails. The schedule lists a $50.00 failed inspection penalty per occurrence, on top of the permit fees.
- You are filing on or after October 1, 2026. The schedule is effective October 1, 2025 to September 30, 2026; rates can change at the fiscal-year rollover.
Impact and tap fees do not apply to this schedule's deck line, but the page-standard disclaimer still applies - always verify with Killeen Building Inspections before budgeting.
Killeen Deck Permit Cost vs Other Verified Jurisdictions
Killeen's flat uncovered-deck fee is easy to compare against other flat-fee jurisdictions - but read the basis column carefully, because each jurisdiction defines its flat line differently, and the source vintages differ.
| Jurisdiction | Deck Fee Basis | Typical Deck Permit |
|---|---|---|
| Killeen, TX - uncovered deck | $70 flat + $10 tech fee (any size or value) | $80.00 all-in |
| Round Rock, TX - uncovered deck | $125 flat (any size, no elec/plumbing) | $125.00 |
| Round Rock, TX - covered deck | $200 flat / $300 with elec or plumbing | $200.00 - $300.00 |
| Frederick County, MD | $157 all-in (≤500 sq ft, eff. July 1, 2026) | $157.00 |
| Dallas, TX | Decks not itemized on fee schedule | Not directly comparable |
Killeen's $80.00 all-in uncovered deck is cheaper than Round Rock's $125 flat uncovered-deck fee - but note the vintage difference: Killeen's figure comes from a dated FY2026 schedule (effective October 1, 2025 to September 30, 2026), while Round Rock's flat menu comes from current department pages that carry no printed effective date. Frederick County, MD's $157 all-in deck permit (500 sq ft or under) takes effect July 1, 2026. Dallas does not itemize decks as a separate fee line, so no single Dallas figure is directly comparable here.
See how Killeen compares head-to-head against Round Rock across project types.
Frequently Asked Questions
Who to Contact
| Department | City of Killeen Development Services - Building Inspections |
| Phone | 254-501-7762 |
| Address | 100 E Avenue C, Killeen, TX 76541 |
| Hours | Monday to Friday, 8 a.m. to 5 p.m. |
| Online permit portal | MGO Connect (mgoconnect.org) |
Sources
-
City of Killeen Development Services - Permit Fees (effective October 1, 2025 to September 30, 2026) Effective October 1, 2025 to September 30, 2026 - Killeen, TX - Primary source for the $70.00 uncovered deck fee, the $10.00 technology/application fee, the $50.00 standalone electrical permit, the $90.00 multi-permit plan review, the $50.00 failed inspection penalty, and the residential addition per-square-foot line ($0.20/sq ft, $200 minimum, $0.04/sq ft plan review). Stable CivicPlus document ID serving the current schedule. current FY2026 schedule
-
City of Killeen - Building Inspections department page Retrieved July 2026 - Killeen, TX - Department contact information, hours, and permitting-process reference.
Confirm your specific Killeen deck permit cost or compare against Round Rock.