Swimming Pool Permit Cost in Killeen, TX (2026)
Residential swimming pool permit fees for the City of Killeen, Texas (Bell County, Central Texas, at the gateway to Fort Cavazos), pulled directly from the Development Services FY2026 Permit Fee Schedule, effective October 1, 2025 through September 30, 2026. Killeen prices a below-ground (in-ground) pool permit at a flat $245.00, and an above-ground pool at a flat $80.00 - the same regardless of pool size, because each is a single flat line, not a valuation-based fee. Texas has no statewide permit levy. This is the current schedule, so there is no source-age caution here.
This guide covers: The City of Killeen residential swimming pool permit fees as printed in the current FY2026 Development Services fee schedule - a flat $245.00 for a below-ground (in-ground) pool and a flat $80.00 for an above-ground pool. Those figures are exact from the schedule effective October 1, 2025 and are the same regardless of pool size, because each is a single flat line. Killeen's schedule explicitly states that swimming pools are NOT included in the per-square-foot new-construction fee, so the pool permit stands on its own line.
This guide does NOT cover: the cost of the pool or its installation, the required pool electrical work (a separate $50.00 electrical trade permit), pool plumbing/gas heater work (separate trade permits), a required safety-barrier fence (Killeen prices fences at $0.25 per linear foot, $70 minimum), or HOA approvals. Killeen also adds a $10.00 Tech/Application Fee to permits marked with an asterisk on the schedule; whether the pool line carries that asterisk is not confirmed from the extract, so it is disclosed here rather than folded into the flat figure.
A residential in-ground (below-ground) swimming pool permit in Killeen, TX is a flat $245.00, and an above-ground pool is a flat $80.00 - the same regardless of pool size, because each is a flat line rather than a valuation-based fee. The required pool electrical work is a separate $50.00 trade permit. Killeen adds a $10.00 Tech/Application Fee to asterisked permits; whether the pool line is asterisked is not confirmed, so it is disclosed rather than added. Texas has no statewide levy. These figures come from the Development Services FY2026 fee schedule effective October 1, 2025, the current schedule. Verify with Killeen Building Inspections (254-501-7762) before filing.
- Killeen charges a flat $245.00 for a below-ground (in-ground) pool permit and a flat $80.00 for an above-ground pool - the same fee regardless of pool size, because each is a single flat line, not a valuation-based schedule.
- The pool permit does NOT include the required electrical work - that is a separate $50.00 electrical trade permit, disclosed here and not folded into the flat figure.
- Killeen's schedule states swimming pools are excluded from the $0.20 per-square-foot new-construction fee, so the pool line stands on its own.
- Killeen adds a $10.00 Tech/Application Fee to asterisked permits. Whether the pool line carries that asterisk is not confirmed from the extract, so the $10 is disclosed rather than added to $245.00 or $80.00.
- Among verified Texas cities, Killeen's in-ground $245 sits in the upper-middle for a flat pool permit - above Temple's $110, and below Arlington's $275 and Pearland's $350.
- The figures come from the Killeen Development Services FY2026 Permit Fee Schedule (effective October 1, 2025 - September 30, 2026) - the current schedule. Verify before relying on them.
Killeen Pool Permit Fee Structure
The residential pool permit is a single flat line - $245.00 in-ground, $80.00 above-ground - priced the same regardless of pool size. There is no valuation calculation on the pool line and no statewide levy. Pool electrical, a possible $10 Tech/Application Fee, and a safety-barrier fence are priced separately - shown below. All figures are from the current FY2026 schedule effective October 1, 2025.
| Item | Fee | How It Is Calculated |
|---|---|---|
| Swimming pool - below-ground (in-ground) | $245.00 | Flat line - same at any pool size. |
| Swimming pool - above-ground | $80.00 | Flat line - same at any pool size. |
| Pool electrical (bonding, equipment) | $50.00 | Separate standalone electrical trade permit - not included in the pool line. |
| Tech / Application Fee (if asterisked) | $10.00 | Added per application to asterisked permits; whether the pool line is asterisked is not confirmed - disclosed, not folded. |
| Safety-barrier fence | $0.25 / LF ($70 min) | A required pool-barrier fence is priced on the separate fence line. |
| State percentage levy | None | Texas has no statewide permit levy. |
Source: City of Killeen Development Services FY2026 Permit Fee Schedule (effective October 1, 2025 - September 30, 2026). The $245.00 in-ground and $80.00 above-ground pool permits are exact on the current schedule. Pool electrical is a separate $50.00 trade permit; a $10.00 Tech/Application Fee applies to asterisked permits (pool-line applicability not confirmed - disclosed). Confirm with Building Inspections.
Worked Examples - Real Pool Projects in Killeen
Because each pool permit is a flat fee, the permit cost does not change with pool size. The examples below use the current FY2026 schedule amounts.
A homeowner installs an in-ground gunite pool with attached spa in a Killeen backyard.
- Below-ground pool permit: $245.00
- Texas state levy: $0.00 (none)
- Pool building permit: $245.00
The same $245.00 applies whether the pool is small or large. Pool electrical is a separate $50 permit, and a barrier fence is separate.
The same in-ground pool including its required electrical bonding and equipment permit.
- Below-ground pool permit: $245.00
- Separate electrical trade permit: $50.00
- Pool + electrical: $295.00 (plus a possible $10 tech fee)
The $295.00 combines the two separate permit lines. If the pool line is asterisked, add a $10 Tech/Application Fee - confirm before budgeting.
A homeowner sets up a larger above-ground pool that requires a permit.
- Above-ground pool permit: $80.00
- Separate electrical (if a pump circuit is added): $50.00
- Above-ground pool line: $80.00
The above-ground pool permit is a flat $80.00. Any added electrical circuit is a separate $50 trade permit; a required barrier fence is separate.
When This Estimate May Not Apply
The flat $245.00 (in-ground) and $80.00 (above-ground) cover the pool building permit on Killeen's current FY2026 schedule. Route your project to Building Inspections before relying on these figures if any of the following applies:
- Pool electrical is required. Bonding and equipment wiring is a separate $50.00 electrical trade permit, not included in the pool line.
- A pool heater or gas/plumbing work is added. Gas and plumbing trade permits ($50.00 each standalone) are separate from the pool building permit.
- A safety-barrier fence is needed. Killeen prices fences at $0.25 per linear foot ($70 minimum) on a separate line.
- The pool permit line is asterisked. If it is, add a $10.00 Tech/Application Fee - confirm the asterisk status with the department.
- The property is in a flood plain. Killeen charges a separate Flood Plain Permit ($150 for 1-2 family lots) where it applies.
- The schedule changes. Confirm the current amounts before budgeting a later job.
Pool electrical, heater/gas/plumbing trade permits, a safety-barrier fence, a possible $10 Tech/Application Fee, and flood-plain requirements are all excluded from the flat pool building permits on this page, and the page-standard disclaimer applies - always verify with Killeen Building Inspections before budgeting.
Killeen Pool Permit Cost vs Other Verified Texas Cities
Texas cities price swimming pool permits mostly as flat lines, and the amounts range widely. The table below compares Killeen's flat in-ground pool permit with other verified Texas cities. Scope differs, so each figure notes its basis; pool electrical is usually a separate trade permit everywhere.
| City | Pool Fee Basis | In-Ground Pool Permit |
|---|---|---|
| Grand Prairie, TX | Flat line | $100.00 |
| Temple, TX | Flat line | $110.00 |
| Killeen, TX | Flat line | $245.00 |
| San Marcos, TX | Flat (+$15 tech) | $263.00 |
| Arlington, TX | Flat line | $275.00 |
| Pearland, TX | Flat line | $350.00 |
Scope note: Killeen's $245.00 is a flat in-ground pool line - upper-middle among verified Texas cities, above Grand Prairie's $100 and Temple's $110, and below San Marcos's $263 (plus a $15 tech fee), Arlington's $275 and Pearland's $350. Each figure is the pool building-permit line; pool electrical is a separate trade permit in each city.
See Killeen's full residential fee schedule, or compare another verified Texas city.
Frequently Asked Questions
Who to Contact
| Department | City of Killeen - Development Services, Building Inspections |
| Phone | 254-501-7762 |
| Location | Killeen, TX 76540 (Bell County, Central Texas) |
| Fee schedule | Killeen Development Services Permit Fee Schedule (FY2026, effective October 1, 2025) |
Sources
-
City of Killeen Development Services Permit Fees (FY2026, effective October 1, 2025 - September 30, 2026) City of Killeen official permit fee schedule (PDF, CivicPlus DocumentCenter). Primary source for the $245.00 below-ground and $80.00 above-ground pool permits, the $50.00 electrical trade permit, the $10.00 Tech/Application Fee provision, and the $0.25/LF fence line. Extracted July 2, 2026 current schedule
-
Texas Local Government Code, Chapter 214 Texas statute (.gov) confirming municipal building-regulation authority and that Texas imposes no statewide percentage building-permit levy. Context for the "no statewide levy" statement. Verified September 2026.