Swimming Pool Permit Cost in Georgetown, TX (2026)
Residential swimming pool permit fees for the City of Georgetown, Texas (Williamson County seat, about 26 miles north of Austin on the I-35 corridor), pulled directly from the city's Building Inspections Construction Fee Schedule. Georgetown prices a swimming pool - in-ground, above-ground, or spa/hot tub as a flat $100.00 permit fee plus a $10.00 technology fee - about $110.00 all-in, the same at any size, because it is a single flat line. Texas has no statewide levy. One source-currency note up front: the fee schedule is marked "Revised 10.2.23" (effective October 1, 2023, more than 24 months old), so confirm the current pool fee with Building Inspections at 512-930-2550 before budgeting.
This guide covers: The City of Georgetown residential swimming pool building permit fee as published on the Building Inspections Construction Fee Schedule - a flat $100.00 permit fee for an in-ground pool, above-ground pool, or spa/hot tub, plus the $10.00 technology fee Georgetown adds to miscellaneous residential permits, for about $110.00 all-in. The fee is the same regardless of pool size, because it is a single flat line.
Important note on source currency: the Georgetown Construction Fee Schedule footer reads "Revised 10.2.23" - effective October 1, 2023, which is more than 24 months old. It is the current published schedule linked from the city's Development Services pages and no newer revision was located, but confirm the current pool fee with Building Inspections at 512-930-2550 before relying on it for a load-bearing budget.
This guide does NOT cover: pool construction and equipment cost, the required pool electrical bonding (a separate standalone trade permit, $50 + $10 tech), a required safety-barrier fence, water/sewer or impact fees, or HOA approvals. These are separate and are not included in the pool building permit fee.
A residential swimming pool permit in Georgetown, TX - in-ground, above-ground, or spa/hot tub - is a flat $100.00 permit fee plus a $10.00 technology fee - about $110.00 all-in, the same at any size, because it is a single flat line. Pool electrical bonding, if a separate permit is required, is a standalone trade permit ($50 + $10 tech). Texas adds no state levy. These figures come from the Construction Fee Schedule marked "Revised 10.2.23" (effective October 1, 2023, more than 24 months old), so confirm current rates with Building Inspections at 512-930-2550 before filing.
- Georgetown charges a flat $100.00 swimming pool permit fee plus a $10.00 technology fee - about $110.00 all-in - the same for an in-ground pool, above-ground pool, or spa/hot tub, and the same regardless of pool size, because it is a single flat line.
- Pool electrical bonding, where the city requires a separate permit for it, is a standalone trade permit ($50 + $10 tech), not part of the pool building line.
- Source-currency caveat: the Construction Fee Schedule is marked "Revised 10.2.23" (effective October 1, 2023, more than 24 months old). It is the current published schedule, but confirm the pool fee with Building Inspections at 512-930-2550 before filing.
- A required safety-barrier fence, impact fees, and utility connections are separate from the flat pool permit and can add materially to a project budget.
- Among verified Texas cities, Georgetown's ~$110 all-in pool permit is at the low end - well below Killeen's $245 in-ground, Round Rock's $350, and San Marcos's $278 building-side.
- Texas has no statewide percentage permit levy - unlike Virginia's 2% USBC add-on - so the flat figure plus the $10 tech fee is the whole pool building permit.
Georgetown Pool Permit Fee Structure
The residential pool permit is a flat fee, priced the same regardless of pool type or size, with a flat technology fee added. Pool electrical bonding may be a separate standalone trade permit. There is no statewide levy. All figures are from the Georgetown Building Inspections Construction Fee Schedule marked "Revised 10.2.23" (effective October 1, 2023) - confirm current rates before relying on them.
| Item | Fee | How It Is Calculated |
|---|---|---|
| Swimming pool permit (in-ground / above-ground / spa / hot tub) | $100.00 | Flat line - same at any pool type or size. |
| Technology fee | $10.00 | Flat add-on to miscellaneous residential permits. |
| Typical all-in pool permit | $110.00 | $100.00 permit + $10.00 technology fee. |
| Pool electrical bonding (if separate permit required) | $50.00 + $10.00 | Standalone electrical trade permit; not part of the pool building line. |
| Plan review (flat pool permit) | None | No plan-review fee applies to a flat miscellaneous residential permit. |
| State percentage levy | None | Texas has no statewide permit levy. |
Source: City of Georgetown Building Inspections Construction Fee Schedule (Revised 10.2.23, effective October 1, 2023). The $100.00 pool permit and $10.00 technology fee are exact on the schedule, but the schedule is more than 24 months old - confirm the current pool fee with Building Inspections at 512-930-2550 before filing.
Worked Examples - Real Pool Projects in Georgetown
Because the pool permit is a flat fee, the building-permit cost does not change with pool size. The examples below use the schedule's published amounts; confirm currency before budgeting.
A homeowner builds a standard in-ground gunite pool in the backyard.
- Pool permit fee: $100.00
- Technology fee: $10.00
- Building permit all-in: $110.00
The same $110 all-in applies whether the pool is small or large. Pool electrical bonding, if a separate permit is required, adds $50 + $10 tech.
A homeowner sets an above-ground pool or a hot tub / spa.
- Pool / spa / hot tub permit: $100.00
- Technology fee: $10.00
- Building permit all-in: $110.00
Georgetown uses one flat line for in-ground, above-ground, and spa/hot tub, so the building permit is the same $110 all-in regardless of type.
A pool build needs a separate electrical bonding permit for pumps and lighting.
- Pool permit (flat + tech): $110.00
- Electrical trade permit (flat + tech): $60.00
- Typical combined: $170.00 (two separate permits)
The $170 is two separate permits, not a merged fee, and applies only where the city requires a standalone electrical permit for pool bonding. Confirm whether your pool build needs it with Building Inspections.
When This Estimate May Not Apply
The flat $100 permit + $10 technology fee figure comes from Georgetown's Construction Fee Schedule. Route your project to Building Inspections before relying on this figure if any of the following applies:
- The rates may have changed. The schedule is marked "Revised 10.2.23" (effective October 1, 2023, more than 24 months old) - confirm the current pool fee at 512-930-2550 before budgeting.
- You have not accounted for the pool electrical. Pool electrical bonding may be a separate standalone trade permit ($50 + $10 tech), not part of the pool building permit.
- A safety-barrier fence is required. Pool enclosure/barrier requirements are handled separately from the pool building permit.
- Impact, water/sewer, or utility fees apply. Georgetown's water/wastewater impact fees are large and billed separately from the pool building permit.
- HOA or deed-restriction rules apply. Placement and approval rules are handled separately from the flat permit fee.
- The pool ties into a larger deck or structure project. Attached decks, covers, or outdoor kitchens may carry their own permit lines.
The source-currency caveat, separate pool electrical, safety-barrier requirements, impact/utility fees, HOA rules, and attached structures are all excluded from or may change the pool building permit figure on this page, and the page-standard disclaimer applies - always verify with the Georgetown Building Inspections office before budgeting.
Georgetown Pool Permit Cost vs Other Verified Texas Cities
Texas cities mostly price residential in-ground pool permits as a flat building-permit line, but the amounts range widely. The table below compares Georgetown's flat pool line (with its $10 tech fee) against other verified Texas cities. Each is the pool building permit only; separate electrical/bonding permits are extra where they apply.
| City | Pool Fee Basis | In-Ground Pool Permit |
|---|---|---|
| Georgetown, TX | Flat + $10 tech | $110.00 |
| Irving, TX | Flat line | $240.00 |
| Killeen, TX | Flat line | $245.00 |
| San Marcos, TX | Flat + $15 tech | $278.00 |
| Round Rock, TX | Flat line | $350.00 |
Scope note: Georgetown's ~$110 all-in pool permit is at the low end among verified Texas cities - well below Irving's $240, Killeen's $245, San Marcos's $278 building-side, and neighboring Round Rock's $350. All are flat pool building-permit lines; pool electrical/bonding is a separate permit where it applies. Georgetown's figure is from a schedule effective October 1, 2023 - confirm currency.
See Georgetown's full residential fee schedule, or compare another Georgetown project type.
Frequently Asked Questions
Who to Contact
| Department | City of Georgetown - Building Inspections (Development Services) |
| Phone | 512-930-2550 |
| Location | 1 Industrial Ave., Georgetown, TX 78626 (Williamson County, ~26 miles north of Austin) |
| Fee schedule | Georgetown Building Inspections Construction Fee Schedule (Rev 10.2.23) |
Sources
-
City of Georgetown - Building Inspections Construction Fee Schedule (Revised 10.2.23) City of Georgetown official fee schedule (extracted July 2, 2026). Primary source for the $100.00 swimming pool (in-ground/above-ground/spa/hot tub) permit, the $10.00 technology fee, and the $50 standalone trade permit. Marked "Revised 10.2.23" (effective October 1, 2023). verify currency
-
Texas Local Government Code, Chapter 214 Texas statute (.gov) confirming municipal building-regulation authority and that Texas imposes no statewide percentage building-permit levy. Context for the "no statewide levy" statement. Verified September 2026.