Shed Permit Cost in New Braunfels, TX (2026)

Shed and accessory-building permit fees for the City of New Braunfels, Texas (Comal and Guadalupe counties), pulled directly from Appendix D of the Code of Ordinances - the Building Permit Fee Schedule A Residential. The schedule prints "Shed, Storage Building, Car Port" at a flat $75.00 built on site and $50.00 pre-built. It is not a per-square-foot rate. That $75.00 (or $50.00) is the exact printed building line. Adding one $35.00 inspection and the 3% technology fee, then applying the Sec. B(k) round-down, produces a modeled all-in estimate of about $113.00 for a built-on-site shed. Texas has no statewide permit levy. Two cautions control this page: the adopted fees are more than two years old (last amended October 9, 2023), and whether the $50.00 application fee and 25% plan review attach to a built-on-site accessory building is a department determination - both are disclosed below.

Shed - Built on Site
$75.00 flat (exact printed line)
Shed - Pre-Built
$50.00 flat (exact printed line)
Inspection Fee
$35.00 per residential inspection
Technology Fee
3% on review, building, zoning and development fees
State / City Percentage Levy
None (Texas has no state levy)
Fee Schedule Effective
Fees date to Oct 9, 2023 - verify current
What This Guide Covers - and What It Does Not

This guide covers: The City of New Braunfels, Texas (Comal and Guadalupe counties) residential shed permit line as printed in Appendix D, Building Permit Fee Schedule A Residential - "Shed, Storage Building, Car Port" at a flat $75.00 built on site or $50.00 pre-built. Those building lines are exact from the published schedule. The $113.00 all-in figure is a modeled estimate, not a printed schedule number: it assumes one $35.00 inspection and the 3% technology fee apply to the $75.00 built-on-site line, then rounds down per Sec. B(k).

Built on site vs pre-built: the schedule distinguishes a shed "built on site" ($75.00) from a "pre-built" shed ($50.00). A pre-built shed is a factory-made unit delivered and set in place; built-on-site means framed and assembled on the lot. Confirm which your project is - the two lines differ by $25.00 before add-ons.

Disclosed ambiguity - the $50.00 application fee and 25% plan review: the schedule prints a $50.00 permit application fee and a 25% plan review (capped at $2,500.00) "for all new construction, additions and substantial alterations." A built-on-site accessory building may be classified as new construction, which would add the $50.00 application fee and potentially the 25% plan review. Because the schedule does not state whether a shed is treated that way, the $113.00 headline estimate excludes them, and a conditional higher scenario that includes them is shown in the worked examples. Confirm the classification with the Building Division.

Source-age caution - fees are more than two years old: the building-permitting fee section was last amended by Ordinance No. 2023-76 on October 9, 2023 - over two years before this guide - and the city has publicized development-fee amendments effective April 1, 2024. Treat every figure here as a starting point and confirm the current amount with the Building Division before budgeting.

This guide does NOT cover: shed size, height, and setback rules; whether a very small shed under a code threshold is exempt from a permit; HOA approvals; shed material and labor cost; electrical for a powered shed (a separate permit with a $15.00 issuance fee); impact fees and New Braunfels Utilities (NBU) charges; and any separate Comal or Guadalupe county fees.

Key Takeaways
  • New Braunfels, Texas prints "Shed, Storage Building, Car Port" at a flat $75.00 built on site and $50.00 pre-built in Appendix D, Building Permit Fee Schedule A Residential. Those building lines are the exact printed figures.
  • The modeled all-in estimate for a built-on-site shed is about $113.00: ($75.00 shed + $35.00 inspection) x 1.03 technology fee = $113.30, rounded down to $113.00 under Sec. B(k). A pre-built shed models to about $87.00. Both are labeled estimates, not printed totals.
  • The shed fee is not per square foot and not tiered by shed size. The schedule prints one flat built-on-site line and one flat pre-built line, with no square-footage breakdown and no residential minimum or maximum permit fee.
  • A built-on-site shed may be classified as new construction, which would add the $50.00 application fee and a 25% plan review. Because the schedule does not state whether a shed is treated that way, those are disclosed and shown as a conditional, not folded into the $113.00 headline.
  • Texas has no statewide percentage permit levy - unlike Virginia's 2% USBC add-on - though New Braunfels applies a 3% technology fee. Electrical for a powered shed is a separate permit with a $15.00 issuance fee.
  • The adopted building-permit fees date to October 9, 2023 (Ordinance No. 2023-76) and the city has publicized development-fee amendments effective April 1, 2024 - confirm current amounts with the Building Division. For same-city context, see the New Braunfels fence permit guide and the New Braunfels flatwork and driveway guide.

New Braunfels Shed Permit Fee Structure

The shed permit is a flat building line - $75.00 built on site or $50.00 pre-built - the exact printed figures. There is no per-square-foot residential rate and no statewide levy. To model a realistic out-the-door cost, one $35.00 inspection and the 3% technology fee are added, then Sec. B(k) rounds the total down to the nearest whole dollar. The $50.00 application fee and the 25% plan review are printed for new construction, additions, and substantial alterations, so they are shown below as a possible department add-on for a built-on-site shed rather than folded into the headline.

Item Fee How It Is Calculated
Shed / storage building / carport - built on site $75.00 Exact flat building line on Schedule A Residential. Same at any shed size when framed and assembled on the lot.
Shed / storage building / carport - pre-built $50.00 Exact flat building line for a factory-made unit delivered and set in place.
Residential inspection fee $35.00 Per residential inspection. Re-inspections are $35.00, doubling for each subsequent re-inspection. One inspection is assumed in the all-in estimate.
Technology fee 3% Applied to all review, building, zoning and development related fees - so 3% on the shed line plus inspection in the estimate.
Permit application fee $50.00 - conditional Printed for new construction, additions, and substantial alterations. A built-on-site shed may be classified as new construction - disclosed as a conditional add-on, not in the headline.
Plan review fee 25% - conditional 25% of permit cost (max $2,500.00), tied to the same categories. Shown as a conditional add-on for a built-on-site shed classified as new construction.
Sec. B(k) round-down To nearest $1 Applied once at the end. $113.30 rounds down to $113.00.
State / city percentage levy None Texas has no statewide permit levy. The only percentage add-on is the city's 3% technology fee.

Source: City of New Braunfels (TX) Code of Ordinances, Appendix D - Fee Schedule, Sec. B(a) Building Permit Fee Schedule A Residential; building-permitting section last amended by Ordinance No. 2023-76 on October 9, 2023. The $75.00 built-on-site and $50.00 pre-built shed lines, the $35.00 inspection fee, the 3% technology fee, the $50.00 application fee, the 25% plan review, and the Sec. B(k) round-down all appear on the city schedule. The $113.00 figure assumes the application fee and plan review do NOT apply - confirm the current amounts and that classification with the Building Division, especially given the fees date to October 9, 2023.

Worked Examples - Real Shed Projects in New Braunfels

The shed permit is a flat building line, so the permit cost does not change with shed size. The all-in estimate adds one $35.00 inspection and the 3% technology fee, then rounds down. The only case that moves higher is a conditional one - if the Building Division classifies a built-on-site shed as new construction. Every figure below is direct arithmetic from the published schedule, with exact lines and modeled estimates labeled separately.

Example 1: Pre-built storage shed delivered and set

A homeowner buys a factory-made storage shed that is delivered and set on a prepared pad.

  • Pre-built shed permit line (exact): $50.00
  • Residential inspection fee: $35.00
  • Subtotal: $85.00 × 1.03 technology fee = $87.55
  • Sec. B(k) round-down: $87.55 → $87.00
  • All-in estimate: $87.00

The $50.00 pre-built line is exact; the $87.00 is a modeled estimate assuming one inspection and the 3% technology fee. Confirm current amounts with the Building Division.

Example 2: Built-on-site storage building

A larger storage building framed and assembled on the lot - the same flat line whatever its footprint.

  • Built-on-site shed permit line (exact): $75.00
  • Residential inspection fee: $35.00
  • Subtotal: $110.00 × 1.03 technology fee = $113.30
  • Sec. B(k) round-down: $113.30 → $113.00
  • All-in estimate: $113.00

A 64-square-foot shed and a 200-square-foot shed both carry the flat $75.00 line and the same $113.00 all-in estimate. The application fee and plan review are excluded here - see Example 3 for the conditional case.

Example 3: Conditional - built-on-site shed classified as new construction

This shows the highest reasonable reading, so a homeowner is not surprised at the counter. It applies only if the Building Division treats the built-on-site shed as new construction of an accessory building.

  • Built-on-site shed permit line: $75.00
  • Application fee (if it applies): $50.00
  • Residential inspection fee: $35.00
  • Plan review (25% of the $75.00 permit, if it applies): $18.75
  • Subtotal: $178.75 × 1.03 = $184.11 → round down $184.00
  • Conditional estimate: $184.00

This is a labeled conditional estimate, not the headline figure, and it applies only if the department classifies the shed as new construction. The plan review here is modeled as 25% of the $75.00 permit line; confirm the exact base and whether these fees apply with the Building Division.

When This Estimate May Not Apply

The $75.00 (built on site) and $50.00 (pre-built) cover the residential shed permit lines as printed, and $113.00 is a modeled all-in estimate. Route your project to the Building Division before relying on these figures if any of the following applies:

  • The Building Division classifies your built-on-site shed as new construction. Then the $50.00 application fee applies (plus the 3% technology fee), and the 25% plan review may apply too - lifting the estimate toward the $184.00 conditional. This is the single largest variable on the page.
  • The adopted fees have been amended since October 9, 2023. The building-permit schedule was last amended by Ordinance No. 2023-76 on October 9, 2023, and the city has publicized development-fee amendments effective April 1, 2024. Confirm the current amount before budgeting.
  • Your shed is very small. A shed under a code-defined size threshold may not require a permit at all. That is a code question set by the city, not decided on this page - confirm before assuming a fee applies.
  • Your shed has power. Electrical for a powered shed is a separate permit on the electrical schedule with a $15.00 issuance fee, not in the shed line.
  • Your job needs more than one inspection. The estimate assumes a single $35.00 inspection. Re-inspections are $35.00, doubling for each subsequent re-inspection.
  • Impact, utility, or county fees apply. Impact fees, New Braunfels Utilities (NBU) connection charges, and any separate Comal or Guadalupe county fees are outside the building-permit line.

Shed size, height, and setback rules, HOA approvals, and material and labor costs are excluded from the shed-permit figures on this page, and the page-standard disclaimer applies. Because the adopted fees date to October 9, 2023, always verify current amounts with the New Braunfels Building Division before budgeting.

New Braunfels Shed Permit Cost vs Other Verified Texas Cities

Texas cities price shed and accessory-building permits differently - some flat, some per square foot, some by valuation. Scope differs, so each figure below notes its basis, and each department should be verified separately.

City Shed Fee Basis Residential Shed Permit
New Braunfels, TX Flat: $75 built on site / $50 pre-built, + $35 insp, ×1.03 $75.00 line / ~$113.00 all-in
League City, TX Outdoor / accessory structure, per square foot $0.75 / sq ft ($150 min)
Conroe, TX No flat accessory line - valuation or $0.64/sq ft Not a flat line - ask the department

Scope note: New Braunfels' $75.00 (built on site) and $50.00 (pre-built) are exact printed shed lines; the ~$113.00 all-in is a modeled estimate adding a $35.00 inspection and a 3% technology fee, rounded down. League City charges a shed as an outdoor/accessory structure at $0.75 per square foot with a $150.00 minimum, so a 200-square-foot shed there is a $150.00 building line. Conroe prints no flat accessory-structure line, so a shed falls under its residential $0.64 per square foot rate or a valuation determination. Compare the basis, not just the number, and confirm current figures with each department - New Braunfels' adopted fees date to October 9, 2023.

Next Step

See New Braunfels' full residential fee schedule, or price other New Braunfels projects.

Frequently Asked Questions

The residential shed line is a flat $75.00 built on site or $50.00 pre-built on Appendix D of the New Braunfels Code of Ordinances - the exact printed figures. Adding one $35.00 inspection and the 3% technology fee to the built-on-site line, then rounding down per Sec. B(k), gives a modeled all-in estimate of about $113.00. If the department classifies a built-on-site shed as new construction, the $50.00 application fee and a 25% plan review may apply on top. Note the adopted fees date to October 9, 2023 - confirm current amounts with the Building Division.
The schedule prints two lines: a shed "built on site" at $75.00 and a "pre-built" shed at $50.00. Built on site means framed and assembled on the lot; pre-built means a factory-made unit delivered and set in place. The two differ by $25.00 before the inspection and technology fee. Confirm which category your project falls into with the Building Division.
Because $75.00 is printed on the schedule as the built-on-site shed line, while $113.00 is modeled. The $113.00 comes from arithmetic - ($75.00 + $35.00) x 1.03 = $113.30, rounded down to $113.00 - and it assumes exactly one inspection and that the 3% technology fee applies. Those assumptions are reasonable but not printed as a single shed total, so we label $113.00 an estimate rather than an exact figure.
The schedule prints the $50.00 application fee and the 25% plan review "for all new construction, additions and substantial alterations." A built-on-site shed may be classified as new construction of an accessory building, which would add them. Because the schedule does not state whether a shed is treated that way, this guide excludes them from the $113.00 headline and shows a conditional estimate of about $184.00 that includes them. Ask the Building Division which classification applies to your shed.
That is a code question, not a fee question, and this page does not decide it. Many jurisdictions exempt a small accessory building under a size threshold from a building permit, but the threshold is set by the city's adopted code. Ask the New Braunfels Building Division whether your specific shed size requires a permit before assuming the $75.00 or $50.00 line applies.
Not as written. The schedule prints a single flat built-on-site line and a single flat pre-built line, with no per-square-foot tier and no residential minimum or maximum permit fee. A small shed and a large one carry the same flat line. What can change the total is the built-on-site versus pre-built distinction and, conditionally, whether the department treats a built-on-site shed as new construction.
The technology fee is 3% applied to all review, building, zoning and development related fees on the New Braunfels schedule. In the built-on-site all-in estimate it is charged on the $75.00 shed line plus the $35.00 inspection - so $110.00 x 1.03 = $113.30, which Sec. B(k) rounds down to $113.00. It is a city fee, not a state levy; Texas has no statewide permit percentage.
They come from Appendix D of the Code of Ordinances, with the building-permitting section last amended by Ordinance No. 2023-76 on October 9, 2023 - more than two years before this guide. The city has publicized development-fee amendments effective April 1, 2024, so the adopted building-permit amounts may have changed. Treat every figure here as a starting point and confirm the current amount with the Building Division before filing. See all New Braunfels permit fees and all Texas cities.

Who to Contact

Department City of New Braunfels, Texas - Building Division
County Comal and Guadalupe counties, Texas
Phone 830-221-4000
Ask them Whether your shed is built-on-site or pre-built, whether it is classified as new construction (triggering the $50.00 application fee and 25% plan review), whether a small shed is exempt, and whether the adopted fees have changed since October 9, 2023
Fee schedule New Braunfels Code of Ordinances - Appendix D, Fee Schedule (Municode)

Sources

Official Sources - Recorded July 2026
  • City of New Braunfels, TX - Code of Ordinances, Appendix D (Fee Schedule) New Braunfels, TX (Comal and Guadalupe counties) - official Code of Ordinances on Municode, Sec. B(a) Building Permit Fee Schedule A Residential. Primary source for the $75.00 built-on-site and $50.00 pre-built shed lines, the $35.00 inspection fee, the 3% technology fee, the $50.00 application fee, the 25% plan review, and the Sec. B(k) round-down. Building-permitting section last amended by Ordinance No. 2023-76 on October 9, 2023; recorded July 2026 Fees date to Oct 9, 2023 - verify current
  • Texas Local Government Code, Chapter 214 Texas statute (.gov) confirming municipal building-regulation authority and that Texas imposes no statewide percentage building-permit levy. Context for the "no statewide levy" statement. Verified July 2026.
Always verify current shed permit fees directly with the City of New Braunfels (TX) Building Division before budgeting or filing. The figures on this page come from Appendix D of the Code of Ordinances, with the building-permit section last amended by Ordinance No. 2023-76 on October 9, 2023 - more than two years ago. The schedule prints a $75.00 built-on-site shed line and a $50.00 pre-built line; the ~$113.00 all-in figure is a modeled estimate adding a $35.00 inspection and a 3% technology fee, rounded down under Sec. B(k). The city has publicized development-fee amendments effective April 1, 2024, so confirm the current amount and whether the $50.00 application fee or 25% plan review apply to your shed before submitting.
Disclaimer: All fee information on PermitPrice is for informational purposes only and is not an official permit quotation. Actual permit fees are determined by the City of New Braunfels, Texas Building Division at the time of application. The $75.00 built-on-site and $50.00 pre-built shed lines, the $35.00 inspection fee, the 3% technology fee, the $50.00 application fee, and the 25% plan review are as printed in Appendix D of the Code of Ordinances, Building Permit Fee Schedule A Residential; that section was last amended by Ordinance No. 2023-76 on October 9, 2023 - more than two years before this guide - and the city has publicized development-fee amendments effective April 1, 2024, so confirm current amounts. The $75.00 and $50.00 lines are exact; the ~$113.00 all-in figure is a modeled estimate that assumes one $35.00 inspection and the 3% technology fee apply to the built-on-site line and is rounded down under Sec. B(k), and the ~$184.00 figure is a labeled conditional that adds the $50.00 application fee and a 25% plan review modeled on the $75.00 permit line, which apply only if the department classifies the shed as new construction. The schedule prints no residential minimum or maximum permit fee and does not itemize shed fees by size. Electrical for a powered shed (a separate permit with a $15.00 issuance fee), impact fees, NBU connection charges, and any Comal or Guadalupe county fees are separate and excluded. Shed size, height and setback rules, HOA approvals, and material and labor costs are excluded from the shed-permit figures on this page. Verify all fees directly with the department before filing.

Written by: Munib Ur Rehman

Data verified against official fee schedule documents.