Skip to main content

League City, TX Building Permit Fees (2026)

Actual residential building permit fees from the City of League City Building Department Permit Fee Schedule, implemented beginning August 1, 2026. League City is a Galveston County city on Clear Lake between Houston and Galveston. This schedule is current: it took effect August 1, 2026 and we re-verified it against the city's published schedule on October 4, 2026. It replaced the prior March 1, 2024 schedule, raising most flat fees and all trade (MEP) permit fees; always confirm current rates with the Building Division before filing.

Jurisdiction
League City, TX (Galveston County)
Permit Type Covered
Building permit (residential)
Coverage Scope
Per-SF building + plan review; MEP trades SEPARATE
Fee Schedule Effective
August 1, 2026
Last Verified
October 4, 2026
Fee Status
Current official schedule - effective Aug 1, 2026
What This Page Covers - and What It Does Not

This page covers: The residential permit fees printed on the City of League City Building Department Permit Fee Schedule implemented August 1, 2026 - the $0.42 per square foot building permit and $0.21 per square foot plan review for a new single-family residence, the $0.16/sq ft repeat floor plan review rate, the $150 minimum permit fee, and the city's flat residential fees ($600 swimming pool, $300 solar panels, $300 boathouse/bulkhead, $250 demolition, $150 roof/window/door, $150 siding, $150 driveway/flatwork, $150 foundation repair, $150 deck or 7ft-plus fence, and more).

MEP trades are priced SEPARATELY and are NOT bundled: Electrical, plumbing, and gas permits each carry a $75.00 base fee, and mechanical is $100.00 per unit (up to 3 tons), plus per-unit components (circuits, fixtures, tons, and so on). Because those component counts vary by house, no all-in new-home total is published and none is asserted on this page - any full-package figure here is a labeled build-up estimate with its assumptions stated.

Texas has no statewide levy: Texas adds no statewide building permit levy, surcharge, or state permit fee. Every fee on this page is a City of League City municipal fee. The schedule prints no technology fee, application fee, or general administrative surcharge. The only percentage add-on printed is a 3.8% credit card convenience fee (RES-2002-138 or as adopted by the current fee schedule) on card payments.

This page does NOT cover: Impact and capital recovery fees (Roadway Capital Recovery Fee, Water and Wastewater Capital Recovery Fees) and engineering or construction-inspection fees, which are set by separate ordinances and are not part of this permit fee schedule. None of those are captured in any figure on this page.

Line items the 2024 schedule printed but the 2026 schedule no longer does: a dedicated generator fee, a general remodel/repairs flat fee, and an outdoor-structure/patio-cover per-square-foot rate are no longer printed. Such work is now permitted under the applicable trade permit (for example a standby generator through the electrical and/or gas permit) or as the Building Division determines, so this page does not publish a dedicated flat fee for them. Known gaps that remain: there is still no separate residential addition line item, so it is not stated whether an addition bills at $0.42/sq ft new-construction or under another category; and re-roof is bundled with windows and exterior doors in one $150.00 line, so a roof-only fee cannot be isolated. The schedule now prints an explicit $150.00 minimum permit fee.

Key Takeaways
  • A new single-family residence is billed per square foot, not by valuation: $0.42/sq ft for the building permit plus $0.21/sq ft for residential plan review, charged in addition to the permit fee. A 2,000 sq ft home is $840 + $420 = $1,260.00 for those two lines. A $150 minimum permit fee applies.
  • MEP trades are separate line items and are NOT bundled into the $0.42/sq ft building permit. Electrical, plumbing, and gas each carry a $75.00 base fee, and mechanical is $100.00 per unit (up to 3 tons), plus per-unit components (electrical circuits $15 each, plumbing fixtures $7 each, sewer line $35, mechanical $10 per ton over 3 tons, and so on). Because those counts vary by house, the city publishes no all-in new-home total.
  • If the same floor plan has already been reviewed, the repeat floor plan review rate drops to $0.16/sq ft. Multiple plan reviews are charged on each review after the second review, based on the initial plan review fee; a plan revision fee of 25% of the initial plan review (minimum $50) also applies.
  • Common flat residential fees: swimming pool $600, solar panels $300, boathouse or bulkhead $300, manufacture home/construction trailer $300, demolition $250, roof/window/exterior doors $150, siding $150, driveway/flatwork $150, foundation repair $150, grade/fill $150, area drain $150, deck or 7ft-plus fence $150, and culvert $75. The August 1, 2026 schedule no longer prints a dedicated generator, general remodel/repairs, or outdoor-structure/patio-cover rate.
  • The schedule is current: it was implemented August 1, 2026 and re-verified October 4, 2026, replacing the prior March 1, 2024 schedule. Impact and capital recovery fees live in separate ordinances and are excluded from every figure on this page. Texas has no statewide permit levy.
  • Penalty fees escalate fast: the first re-inspection is $100, the second for the same failure is $300, and the third and each thereafter is $500. Working without a permit is charged at double the cost of the permit fee.

League City Building Permit Fee Structure

League City prices new residential construction per square foot, charges plan review as a separate per-square-foot line, and prices most other residential work as flat fees. The tables below reproduce the figures exactly as printed on the Building Department Permit Fee Schedule implemented August 1, 2026. That schedule is current as of this page's October 4, 2026 verification; confirm your project's trade scope with the Building Division before filing.

Per-square-foot residential rates

Category Rate
Residential building permit - new single family residence$0.42 / sq ft
Residential plan review - new single family residence (charged separately, in addition to the permit fee)$0.21 / sq ft
Repeat floor plan review - new single family residence (same floor plan already reviewed)$0.16 / sq ft
Minimum permit fee$150.00
Multiple plan reviews (each review after the 2nd)based on the initial plan review fee
Plan revision fee (all permits, non-refundable)25% of the initial plan review fee, min $50.00

The August 1, 2026 schedule prints an explicit $150.00 minimum permit fee. There is no printed residential addition line item - see the ambiguity note below the flat-fee table.

Flat residential permit fees

Permit Fee
Swimming pool$600.00
Solar panels$300.00
Boathouse / bulkhead$300.00
Manufacture home / construction trailer$300.00
Demolition$250.00
Roof / windows / exterior doors (one combined line)$150.00
Siding$150.00
Driveway / flatwork$150.00
Foundation repair$150.00
Grade / fill$150.00
Area drain$150.00
Fences 7 ft and over / decks$150.00
Irrigation permit$150.00
Culvert$75.00

One ambiguity disclosed, not resolved: The schedule prints no residential addition line item, so it does not state whether a room addition bills at the $0.42/sq ft new-construction rate or under another category - we do not pick one for you; ask the Building Division how they classify your scope. Because re-roof is bundled with windows and exterior doors in a single $150.00 line, a roof-only fee cannot be isolated from the printed schedule. The August 1, 2026 schedule no longer prints a dedicated generator fee, a general remodel/repairs flat fee, or an outdoor-structure/patio-cover per-square-foot rate; that work is routed through the applicable trade permit or Building Division determination. Other items on the schedule: contractor registration & annual renewal $150.00, business registration $100.00, short term rental & annual renewal $300.00, permanent sign $150.00 each and temporary sign $50.00 each, and a backflow prevention program (assembly registration $35.00, assembly tester registration & annual renewal $75.00, enforcement processing fee $40.00).

League City Permit Fee Components and Surcharges

A League City residential project total stacks separate components: the per-square-foot building permit, a separate per-square-foot plan review, and one trade permit per MEP discipline - each with its own base fee plus per-unit charges. The schedule prints no technology fee and no general administrative surcharge.

Component Amount Status
Residential building permit (new SFR) $0.42 / sq ft Exact schedule figure (eff. 08/01/2026)
Residential plan review (new SFR) $0.21 / sq ft Separate - charged in addition to the permit fee
Electrical permit $75.00 base + $15 per circuit + $35 per T-pole + $75 reconnect Separate - NOT bundled into the building permit
Plumbing permit $75.00 base + $7 per fixture + $15 water line + $35 sewer line + $30 backflow preventer Separate - NOT bundled into the building permit
Gas permit $75.00 flat rate + $75 reconnect Separate - NOT bundled into the building permit
Mechanical permit $100.00 per unit up to 3 tons + $10 per ton over 3 tons Separate - NOT bundled into the building permit
Credit card convenience fee 3.8% of payment Applies to all credit card payments (RES-2002-138)
Multiple plan reviews based on the initial plan review fee Each review after the 2nd review
Plan revision fee 25% of initial plan review fee, min $50.00 All permits, non-refundable
Working without a permit Double the cost of the permit fee Penalty - applies when work starts without a permit
Re-inspection fees $100 first / $300 second (same failure) / $500 third and each thereafter Charged per occurrence, on top of permit fees
After hours / same day inspection Same day $200 / after hours $300 for the first 2 hours, then $50/hour Due in advance
Impact / capital recovery / engineering inspection fees Separate ordinances Excluded - not part of this permit fee schedule

Because the MEP per-unit components (circuit count, fixture count, tonnage) depend entirely on the individual house, the city publishes no all-in new-home total and this page does not assert one as a fact. The worked examples below that combine building, plan review, and trade base fees are explicitly labeled build-up estimates with their assumptions stated. Commercial construction uses a separate valuation-tiered table with a plan review fee of 25% of the permit fee; residential new construction does not use that table.

Worked Examples

Every figure below is direct arithmetic from the August 1, 2026 Permit Fee Schedule. Building and plan review lines are exact from the schedule; any figure that adds MEP trade permits is a labeled build-up estimate, because trade totals depend on per-unit counts that vary by project.

Example 1: New 2,000 SF Single-Family Residence

Fee Calculation - New 2,000 SF Single-Family Residence in League City, TX
Fee Component Rule Applied Amount
Residential building permit 2,000 SF × $0.42 $840.00
Residential plan review 2,000 SF × $0.21 $420.00
Building + plan review subtotal (exact) $840 + $420 $1,260.00
+ MEP trade permit BASE fees only (electrical, plumbing, gas, mechanical) $75 + $75 + $75 + $100 $325.00
Building + review + trade base fees (build-up estimate, floor only) $1,260 + $325 $1,585.00 (estimate, excludes per-unit charges)

Assumptions: A 2,000 SF new single-family residence billed at the printed per-square-foot rates, with a first-time (not repeat) floor plan and no more than two plan reviews. The $1,260.00 building-plus-plan-review subtotal is exact arithmetic from the schedule. The $1,585.00 line adds only the trade permit BASE fees (electrical $75, plumbing $75, gas $75, mechanical $100) and is a build-up estimate and a floor, not a total - each trade also carries per-unit charges (circuits at $15 each, plumbing fixtures at $7 each, water line $15, sewer line $35, backflow preventer $30, mechanical $10 per ton over 3 tons) whose counts are project-specific and unknown here. That is why League City publishes no all-in new-home figure. Impact and capital recovery fees are set by separate ordinances and are excluded. Source: City of League City Building Department Permit Fee Schedule, implemented August 1, 2026.

Example 2: 2,600 SF Home Using a Duplicate Floor Plan

Fee Calculation - 2,600 SF Duplicate Floor Plan in League City, TX
Fee Component Rule Applied Amount
Residential building permit 2,600 SF × $0.42 $1,092.00
Duplicate floor plan review 2,600 SF × $0.16 $416.00
Building + duplicate review subtotal (exact) $1,092 + $416 $1,508.00

Assumptions: A production builder repeating a floor plan the city has already reviewed, so the review line drops from $0.21/sq ft to the printed $0.16/sq ft repeat rate. Arithmetic is exact from the schedule. For comparison, the same 2,600 SF home on a first-time plan would be 2,600 × $0.21 = $546.00 for review, or $1,638.00 combined - the repeat rate saves $130.00. MEP trade permits are separate and not included here. Source: City of League City Building Department Permit Fee Schedule, implemented August 1, 2026.

Example 3: Flat-Fee Projects - Pool, Deck, Roof, Demolition

Fee Calculation - Flat-Fee Residential Permits in League City, TX
Project Rule Applied Building-Side Fee
Swimming pool flat fee as printed $600.00
Deck (or fence 7 ft and over) flat fee as printed $150.00
Roof / windows / exterior doors flat fee as printed (one combined line) $150.00
Demolition flat fee as printed $250.00

Assumptions: Each amount is the flat building-side permit fee exactly as printed - no arithmetic is applied. These are not all-in totals: a pool that needs electrical bonding or gas heater work draws a separate $75.00-base electrical or gas permit plus its per-unit charges, and a re-roof that touches other trades draws those permits separately too. The August 1, 2026 schedule no longer prints a dedicated generator or general remodel/repairs line, so those are routed through the applicable trade permit or Building Division determination. Source: City of League City Building Department Permit Fee Schedule, implemented August 1, 2026.

Example 4: Swimming Pool With Its Separate Pool Electrical Permit

Fee Calculation - Swimming Pool Plus Pool Electrical in League City, TX
Fee Component Rule Applied Amount
Swimming pool building permit flat fee as printed $600.00
Pool electrical permit - base $75.00 base $75.00
+ bonding / equipment circuits (illustrative: 2) 2 × $15.00 $30.00
Pool + pool electrical (build-up estimate) $600 + $75 + $30 $705.00 (estimate)

Assumptions: The $600.00 swimming pool building permit is the exact flat fee as printed. A pool almost always needs electrical bonding and equipment circuits, which are permitted as a separate electrical permit at a $75.00 base plus $15.00 per circuit. The circuit count varies by installation; two circuits are assumed here purely for illustration, so the $705.00 figure is a labeled build-up estimate, not a quotation - a gas pool heater would add a separate $75.00 gas permit. Paying by card adds the 3.8% convenience fee to the total. Source: City of League City Building Department Permit Fee Schedule, implemented August 1, 2026.

Read before you budget from these examples

  • No all-in new-home total exists: MEP trades are priced separately with per-unit components that vary by house, so the city publishes no bundled new-home figure and neither do we. The $1,585.00 example is a floor built from base fees only.
  • The schedule is current: it was implemented August 1, 2026 and re-verified October 4, 2026, replacing the prior March 1, 2024 schedule. Confirm current rates with the Building Division before filing.
  • Additions are ambiguous: the schedule prints no residential addition line, so whether an addition bills at $0.42/sq ft or under another category is not stated. We do not resolve it - ask the Building Division.
  • Roof-only fees cannot be isolated: roof, windows, and exterior doors share one $150.00 line.
  • Excluded fees can dominate a new build: Roadway Capital Recovery, Water and Wastewater Capital Recovery, and engineering or construction-inspection fees are separate ordinances and are in none of these figures.
  • Paying by card adds 3.8%: the credit card convenience fee (RES-2002-138) applies to the payment amount, so it scales with whatever you owe.

Practitioner Insight

League City's residential schedule is unusually easy to read on the building side and unusually incomplete on the trade side. The building math is two lines you can do in your head: $0.42/sq ft for the permit and $0.21/sq ft for plan review, so a 2,000 sq ft house is $1,260.00 before anyone touches a wire or a pipe. The duplicate floor plan rate at $0.16/sq ft is a real production-builder discount that most Gulf Coast cities do not print at all. Compare that structure with Houston-area peers like Pearland, Baytown, and Pasadena.

The trade side is where budgets go wrong. Electrical, plumbing, and gas are three distinct permits at $75.00 base each, mechanical is $100.00 per unit, and each adds per-unit charges - $15 a circuit, $7 a plumbing fixture, $35 for a sewer line, $10 per ton over three on a mechanical unit. Those counts are house-specific, which is exactly why no all-in new-home number is published by the city and why anyone quoting you one for League City is guessing. One more change worth noting: the August 1, 2026 schedule that replaced the old 2024 one raised every trade base fee and most flat fees, and dropped the standalone generator, remodel/repairs, and patio-cover lines - so a standby generator now rides on the electrical (and, if gas, the gas) permit. The re-inspection ladder is steep ($100, then $300, then $500 for the same failure); confirm your project's trade scope with the Building Division before you file.

Permit Requirements - Common Residential Projects in League City

Project Type Permit Required? Fee Category Notes
New single-family residence Yes $0.42/SF + $0.21/SF review 2,000 SF = $1,260.00; MEP trades separate
New SFR on a duplicate floor plan Yes $0.42/SF + $0.16/SF review Reduced review rate where the plan was already reviewed
Addition Yes Not printed separately Schedule does not state the category - ask the city how they classify your scope
Deck Yes $150.00 flat Same line as fences 7 ft and over
Swimming pool Yes $600.00 flat Pool electrical or gas heater draws separate trade permits
Re-roof / windows / exterior doors Yes $150.00 flat (combined line) Roof-only fee cannot be isolated from the printed schedule
Solar panels Yes $300.00 flat Electrical permit is a separate $75.00-base line
Standby generator Yes No dedicated flat line Permitted through the electrical and (if gas) gas permit, or per Building Division
Demolition Yes $250.00 flat Printed as a single residential-adjacent line
Electrical / plumbing / gas / mechanical work Yes $75 base each ($100/unit mechanical) + per-unit charges Never bundled into the building permit

Permit trigger thresholds and chargeable-area determinations (which square footage counts for garages, porches, and covered patios) are set by the City of League City Building Division and are not printed on the fee schedule. When uncertain whether a permit is required, contact the Building Division before starting work - the penalty for working without one is double the regular permit fees.

City of League City Building Division

Department

Building Division - City of League City

Galveston County, Texas

Contact

City website: leaguecitytx.gov

The Building Department Fee Schedule page (leaguecitytx.gov/4735) carries the current schedule as on-page tables. We do not publish a phone number here because none was captured in our verified extraction - use the city site for current contact details.

Fee Schedule

Building Department Permit Fee Schedule

Effective August 1, 2026 · re-verified October 4, 2026

Verify with your local building department before budgeting or filing. The fees on this page come from the City of League City Building Department Permit Fee Schedule implemented August 1, 2026, which we re-verified October 4, 2026. It replaced the prior March 1, 2024 schedule. Trade permit totals depend on per-unit counts the schedule cannot predict. Confirm current rates and your project's trade scope directly with the League City Building Division before treating any figure here as final.

When This Estimate May Not Apply

The city adopts another fee schedule

The schedule used here was implemented August 1, 2026 and re-verified October 4, 2026, replacing the prior March 1, 2024 schedule. League City last revised its fees after about two years, so a future revision is possible. Confirm with the Building Division before filing.

You want one all-in number for a new home

There is not one. Electrical, plumbing, and gas are separate permits at $75.00 base each, mechanical is $100.00 per unit, plus per-unit charges tied to circuit, fixture, and tonnage counts specific to your house. Only the $0.42/sq ft building and $0.21/sq ft review lines can be computed exactly in advance.

Your project is a room addition

The schedule prints no residential addition line item. Whether an addition is charged at the $0.42/sq ft new-construction rate or under another category is not stated, and we do not resolve the ambiguity for you. Ask the Building Division how they classify your scope before budgeting.

You are re-roofing only

Roof, windows, and exterior doors are printed as one combined $150.00 line, so a roof-specific fee cannot be isolated from the schedule and we do not infer one.

Plans need extra review, inspections fail, or work started early

Multiple plan reviews are charged based on the initial plan review fee for each review after the second, and a plan revision fee of 25% of the initial plan review (minimum $50) applies to all permits. Re-inspections run $100, then $300 for a second failure of the same item, then $500 for the third and each after. Working without a permit is charged at double the cost of the permit fee. After-hours or same-day inspection is due in advance: same day $200 and after hours $300 for the first 2 hours, plus $50 per hour thereafter.

You are budgeting the whole development cost, not just the permit

Roadway Capital Recovery Fees, Water and Wastewater Capital Recovery Fees, and engineering or construction-inspection fees are set by separate League City ordinances (for example Ordinance No. 2024-03 and the 2024 Roadway CRF ordinance) and are not part of this permit fee schedule or any figure on this page.

Source note: All figures come from the City of League City Building Department Permit Fee Schedule, implemented beginning August 1, 2026 and published as on-page tables at leaguecitytx.gov/4735/Building-Department-Fee-Schedule. It was re-verified on October 4, 2026 using trafilatura table extraction with a raw-HTML cross-check of each line item; the prior 2024 PDF (DocumentCenter/View/43931) now returns a 404. The commercial valuation table is noted for context only - residential new construction does not use it.

Frequently Asked Questions

A new single-family residence is $0.42 per square foot for the building permit plus $0.21 per square foot for residential plan review - $1,260.00 for a 2,000 sq ft home, with a $150 minimum permit fee. Electrical, plumbing, and gas permits are separate at $75.00 base each (mechanical is $100.00 per unit) plus per-unit charges, so no all-in total is published. Flat fees include a pool at $600, a deck at $150, and demolition at $250. These come from the schedule implemented August 1, 2026 and re-verified October 4, 2026.
No. The schedule prices electrical, plumbing, gas, and mechanical as separate permits. Electrical, plumbing, and gas each carry a $75.00 base fee and mechanical is $100.00 per unit (up to 3 tons), plus per-unit components - $15 per circuit and $35 per T-pole on electrical, $7 per fixture plus $15 water line and $35 sewer line on plumbing, and $10 per ton over 3 tons on mechanical. Those counts vary by house, which is why the city publishes no bundled new-home permit total.
It is the Building Department Permit Fee Schedule implemented beginning August 1, 2026, which we re-verified against the city's published schedule on October 4, 2026. It replaced the prior March 1, 2024 schedule (whose PDF link now returns a 404) and raised most flat fees and all trade permit fees. It is current as of this writing; confirm current rates with the League City Building Division before you budget or file.
The schedule does not say. There is no printed residential addition line item, so it is not stated whether an addition is charged at the $0.42/sq ft new-construction rate or under another category (the August 1, 2026 schedule no longer prints a general remodel/repairs line). We disclose that ambiguity rather than pick one - ask the Building Division how they classify your scope. See the addition permit cost walkthrough for how per-square-foot addition math works in another Texas city.
A swimming pool is a flat $600.00 and a deck is a flat $150.00 (the same line as fences 7 ft and over). Neither is an all-in total: pool bonding or a gas heater draws a separate electrical or gas permit at $75.00 base plus per-unit charges. Our League City pool permit cost guide works through the trade add-ons and the card convenience fee line by line, and solar installs get the same treatment in the League City solar permit cost guide. The League City deck permit cost guide covers that $100.00 deck line and the covered-deck exception in full. For a comparable Gulf Coast walkthrough, see the Baytown pool permit cost guide.
Texas has no statewide building permit levy, surcharge, or state permit fee - every fee here is a City of League City municipal fee. The schedule prints no technology fee, application fee, or general administrative surcharge. The only percentage add-on printed is a 3.8% credit card convenience fee (RES-2002-138) applied to card payments. Impact and capital recovery fees exist but are set by separate ordinances.
When the same floor plan has already been reviewed by the city, residential plan review drops from $0.21/sq ft to the $0.16/sq ft repeat rate. On a 2,600 sq ft house that is $416.00 instead of $546.00, a $130.00 saving. Separately, multiple plan reviews are charged based on the initial plan review fee for each review after the second review, and a plan revision fee of 25% of the initial plan review (minimum $50) applies.
Working without a permit is charged at double the cost of the permit fee. Re-inspections escalate: $100 for the first, $300 for a second re-inspection of the same failure, and $500 for the third and each thereafter. After-hours or same-day inspection is due in advance: same day is $200 and after hours is $300 for the first two hours, plus $50 per hour thereafter.

Sources

Official .gov Sources · Verified October 2026
  • City of League City - Building Department Permit Fee Schedule (effective August 1, 2026) League City, TX - official permit fee schedule implemented beginning August 1, 2026, published as on-page tables. Primary and only source for every per-square-foot rate, flat fee, trade permit fee, penalty fee, and the 3.8% card convenience fee on this page. Re-verified October 4, 2026 with trafilatura table extraction and a raw-HTML line-item cross-check. It replaced the prior March 1, 2024 PDF, whose link now returns a 404 Verified
  • City of League City - official website (Building Department) City site hosting the Building Department Fee Schedule page. Use it to confirm whether the permit fee schedule has been revised since August 1, 2026. Accessed October 4, 2026.
Next Step

Compare League City's per-square-foot structure with nearby Houston-area cities, or estimate fees in covered jurisdictions.

Texas Permit Fees Hub → Pearland Permit Fees → Baytown Permit Fees → Pasadena Permit Fees → Corpus Christi Permit Fees → League City Pool Permit Guide → League City Solar Permit Guide → League City Deck Permit Guide → League City Generator Permit Guide → Baytown Pool Permit Guide → Permit Fee Calculator → All Guides →

Permit Fees Are One Part of Your Project Budget

Once you know your League City permit cost, two related numbers round out your total budget picture:

Property tax impact after your project closes

A permitted addition or pool increases your assessed value in Galveston County. A permitted project may change the property's taxable value. The county appraisal district determines that value and local taxing units adopt the rates, both separately from this permit fee.

Capital recovery and site fees for larger projects

League City's Roadway and Water/Wastewater Capital Recovery Fees sit in separate ordinances, outside the permit fee schedule. These items are governed by fee schedules separate from the building permit and are not included in the figures above.

These charges are administered separately from the building permit fee, though the responsible office and billing process vary by jurisdiction. See which tool covers each charge →

Always verify current fees directly with the City of League City Building Division before budgeting or filing. The fees on this page are from the League City Building Department Permit Fee Schedule implemented August 1, 2026, re-verified October 4, 2026. Fee schedules change by city action, and MEP trade totals depend on project-specific unit counts. Confirm the current schedule and your project's trade scope with the Building Division before you file.
Disclaimer: All fee information on PermitPrice is for informational purposes only and is an estimate, not an official permit quotation. Actual permit fees are determined by the City of League City Building Division at the time of application. The per-square-foot rates ($0.42 building, $0.21 plan review, $0.16 repeat plan review), the $150 minimum permit fee, the flat residential fees, the trade permit base fees ($75 electrical/plumbing/gas, $100 per mechanical unit) and their per-unit components, the penalty fees, and the 3.8% credit card convenience fee are exact as printed on the schedule implemented August 1, 2026 and re-verified October 4, 2026, which replaced the prior March 1, 2024 schedule. MEP trades are priced separately and are NOT bundled into the building permit, so no all-in new-home total is published and any full-package figure on this page is a labeled build-up estimate. The schedule prints no residential addition line item, so addition treatment is ambiguous and unresolved here; roof-only fees cannot be isolated from the combined $150.00 roof/window/exterior-door line; and the schedule no longer prints a dedicated generator, general remodel/repairs, or outdoor-structure/patio-cover fee. Impact fees, Roadway and Water/Wastewater Capital Recovery Fees, and engineering or construction-inspection fees are set by separate ordinances and are not included in any figure on this page.