Pool Permit Cost in Longview, TX (2026)
Residential swimming pool permit fees for the City of Longview, Texas, pulled directly from the Development Services Fee Schedule 2025-2026. Longview prices an in-ground swimming pool as a flat $305.00 building permit and an above-ground pool as a flat $105.00 - the same at any pool size or value, because these are flat lines, not valuation-based fees. Pool pump and equipment bonding may draw a separate $80.00 electrical trade permit, which is not part of the pool building permit. Texas has no statewide permit levy, and Longview adds no percentage surcharge.
This guide covers: The City of Longview (Gregg and Harrison Counties) residential swimming pool building permit fees as printed on the Development Services Fee Schedule 2025-2026 - a flat $305.00 for an in-ground pool and $105.00 for an above-ground pool. Both figures are exact from the schedule and are the same whether the pool is a small plunge pool or a large in-ground pool, because they are flat lines rather than valuation-based fees.
Important note on fee schedule age: The schedule is titled "Development Services Fee Schedule 2025-2026" - the current published fiscal-year edition - but no exact effective date is printed anywhere in the document. Treat these as the current FY2025-2026 published amounts and confirm them with Development Services before relying on any number.
Pool electrical and the safety barrier are separate: the pool figure is the building permit. Pool pump and equipment bonding may draw a separate $80.00 residential electrical trade permit, and a code-required safety barrier (a fence) is handled on its own - a residential fence permit in Longview is a flat $55.00 (see the Longview roof permit guide for another flat-fee example on the same schedule). Whether the barrier needs a separate permit is a department determination.
This guide does NOT cover: pool construction cost, impact or water/sewer tap fees (a 5/8-inch meter set is $450.00 on the same schedule), gas-line permitting for a pool heater, HOA approvals, or zoning setback questions. Zoning, platting, impact, and utility fees are separate schedules and are not included.
A residential swimming pool permit in Longview, TX is a flat $305.00 building permit for an in-ground pool and $105.00 for an above-ground pool - the same at any pool size or value. Pool pump and equipment bonding may draw a separate $80.00 electrical trade permit, and a safety barrier (fence) is separate. Texas adds no state levy. Figures are from the Development Services Fee Schedule 2025-2026, which prints no exact effective date.
- Longview charges a flat $305.00 for an in-ground swimming pool building permit and $105.00 for an above-ground pool - the same fee regardless of pool size or construction value, because these are flat lines, not a valuation-based schedule.
- Pool pump and equipment bonding may draw a separate $80.00 residential electrical trade permit, which the schedule lists as its own permit. It is not included in the pool building permit.
- A code-required safety barrier is handled separately - a residential fence permit in Longview is a flat $55.00. Whether the barrier is pulled as its own permit is a department call.
- Texas has no statewide percentage permit levy - unlike Virginia's 2% USBC add-on - and Longview adds no city percentage surcharge on the pool permit.
- For context among verified Texas cities: Longview's $305 in-ground pool building permit sits at the higher end, near Pearland's $350 and Denton's $357, and well above Abilene's $180 and Temple's $110 - though each city bundles or excludes trades differently.
- The figures come from the current City of Longview Development Services Fee Schedule 2025-2026, the current fiscal-year edition, which prints no exact effective date. Confirm current amounts with Development Services before budgeting.
Longview Pool Permit Fee Structure
The pool building permit is a single flat line, priced by pool type rather than size or value. Pool electrical and the safety barrier are separate. There is no valuation calculation, no technology surcharge, and no statewide levy.
| Item | Fee | How It Is Calculated |
|---|---|---|
| In-ground swimming pool permit | $305.00 | Flat fee from the "Swimming Pool In-ground" residential line - same at any pool size. |
| Above-ground swimming pool permit | $105.00 | Flat fee from the "Swimming Pool Above-ground" residential line. |
| Pool electrical (pump, equipment bonding) | $80.00 | Residential electrical trade permit, listed separately - not part of the pool fee. |
| Safety barrier (residential fence) | $55.00 | Flat residential fence permit, only if pulled as a separate permit. |
| State / city percentage levy | None | Texas has no statewide permit levy; Longview adds no percentage surcharge. |
Source: City of Longview Development Services Fee Schedule 2025-2026. The schedule prints no exact effective date; treat these as the current FY2025-2026 published amounts. The $80.00 electrical and $55.00 fence figures are separate residential permits from the same schedule, shown for context - confirm whether either applies to your pool with Development Services.
Worked Examples - Real Pool Projects in Longview
Because the pool building permit is a flat fee by pool type, the permit cost does not change with pool size or value. What can add to the total is a separate electrical permit and a separate barrier permit. Figures are from the Development Services Fee Schedule 2025-2026.
A homeowner installs an in-ground pool on a lot that already has a compliant safety barrier, so no new fence permit is needed.
- In-ground pool building permit: $305.00
- Texas state levy: $0.00 (none)
- Pool building permit: $305.00 (before any electrical)
The same $305 applies whether the pool is a small plunge pool or a large in-ground pool - it is a flat line, not valuation-based. Pool pump bonding may add a separate $80.00 electrical permit; confirm with the department.
A new in-ground pool that also needs a separate electrical permit for equipment bonding and a new fence barrier, both pulled as separate permits.
- In-ground pool building permit: $305.00
- Electrical trade permit (pump/equipment bonding): $80.00
- Fence barrier permit: $55.00
- Pool + electrical + fence permits: $440.00
Whether the barrier must be pulled as a separate fence permit is the department's call - some jurisdictions fold it into the pool permit. Confirm before assuming the $55 fence line applies.
A homeowner installs an above-ground pool.
- Above-ground pool building permit: $105.00
- Pool building permit: $105.00 (before any electrical)
The above-ground pool line is a flat $105.00. If the pump draws a separate electrical permit, add $80.00. Confirm the barrier requirement for above-ground pools with the department.
When This Estimate May Not Apply
The flat pool fees cover the pool building permit itself on the FY2025-2026 schedule. Route your project to Longview Development Services before relying on these figures if any of the following applies:
- Pool electrical is permitted separately. Pump and equipment bonding may draw its own $80.00 electrical trade permit, which is not included in the pool building permit.
- Your pool needs a new safety barrier. A residential fence permit is a flat $55.00 as a separate permit, or the barrier may be folded into the pool permit - the department decides. This guide does not assume one way or the other.
- Your pool has a gas heater. Gas-line work may be permitted separately as an $80.00 gas trade permit - a question for the department.
- Impact or utility fees apply. Water/sewer tap (a 5/8-inch meter set is $450.00) and impact fees are on separate schedules and are not part of the pool permit.
- The schedule is updated. The figures come from the FY2025-2026 schedule with no printed exact effective date and can change with the next fiscal-year edition - confirm before filing.
Pool electrical, barrier, gas-heater, and impact fees are excluded from the pool building permit on this page, and the page-standard disclaimer applies - always verify with Development Services before budgeting.
Longview Pool Permit Cost vs Other Verified Texas Cities
Texas cities price pool permits on different models - flat building permits, valuation-based fees, and flat fees that bundle trades. The table below compares Longview's flat in-ground pool building permit with other verified Texas cities. Scope differs, so each figure notes its basis.
| City | Pool Fee Basis | In-Ground Pool Permit |
|---|---|---|
| Longview, TX | Flat building permit; electrical separate | $305.00 |
| Denton, TX | Flat pool line; electrical separate | $357.00 |
| Abilene, TX | Flat pool line; trades separate | $180.00 |
| Temple, TX | Flat pool/spa line; trades separate | $110.00 |
Scope note: Longview's $305 is the in-ground pool building permit only, with pool electrical ($80) separate. Denton's $357 and Temple's $110 are flat pool lines with electrical billed separately; Abilene's $180 is a flat in-ground pool line. Longview and Denton anchor the higher end of verified East and North Texas pool permits, while Temple and Abilene are among the lowest. Confirm current figures and trade treatment with each department.
See Longview's full residential fee schedule, or price a re-roof.
Frequently Asked Questions
Who to Contact
| Department | City of Longview - Development Services (Building & Permits) |
| Location | City of Longview, Gregg & Harrison Counties, Texas |
| Contact | Confirm current fees and counter hours on the city's Development Services Fees page |
| Fee schedule | Development Services Fee Schedule 2025-2026 |
Sources
-
City of Longview - Development Services Fee Schedule 2025-2026 Longview, TX - official city fee schedule served as a PDF at the stable longviewtexas.gov Development Services Fees page. Primary source for the $305 in-ground and $105 above-ground pool building permits, the $80 electrical trade permit, and the $55 fence permit. Captured July 4, 2026 FY2025-2026 - no printed date, verify current
-
Texas Local Government Code, Chapter 214 Texas statute (.gov) confirming municipal building-regulation authority and that Texas imposes no statewide percentage building-permit levy. Context for the "no statewide levy" statement. Verified July 2026.