Lynchburg, VA Building Permit Fees (2026)

Actual building permit fee structure from the City of Lynchburg Community Development Department Fee Schedule (Building Inspections section), effective May 1, 2018. Lynchburg is an independent city, not part of any county, and its Inspections Division issues building, electrical, mechanical, gas, and plumbing permits. Verified directly against the published city document on October 28, 2026.

Jurisdiction
City of Lynchburg, VA (independent city)
Permit Type Covered
Building permit (residential)
Coverage Scope
Valuation table; plan check + trades SEPARATE
Fee Schedule Effective
May 1, 2018
Last Verified
October 28, 2026
Fee Status
Official 2018 schedule still linked by the city - confirm before budgeting
What This Page Covers - and What It Does Not

This page covers: The City of Lynchburg building permit fee table, which prices Building (new), Repair, Electrical, Mechanical, Gas, and Plumbing permits by total valuation: $40 for $1 to $1,000; $40 for the first $1,000 plus $5 for each additional $1,000 up to $50,000; $285 for the first $50,000 plus $4 for each additional $1,000 up to $100,000; $460 for the first $100,000 plus $3 for each additional $1,000 up to $500,000; and $1,660 for the first $500,000 plus $2 for each additional $1,000 above that. It also covers the city's flat fees ($250 residential demolition, $100 moving fee, $75 certificate of occupancy for an existing building, $50 reinspection, and more).

Plan checking fee is ADDED: When construction exceeds $1,000, a plan checking fee of 10% of the permit fee is charged in addition to the permit fee.

Trade permits are SEPARATE: Electrical, mechanical, gas, and plumbing permits use the same valuation table, but each is priced on its own valuation as its own permit. The worked examples on this page price the building permit only and do not include trade permits.

2% Virginia levy: The schedule notes a 2.00% Virginia levy on fees charged for building permits issued under the Uniform Statewide Building Code (USBC). PermitPrice applies the 2% to the permit fee only. The schedule does not state whether the 10% plan checking fee is part of the levy base - confirm with the city.

Source age: The schedule footer reads "Effective May 1, 2018." It is still the Fee Chart the city links from its Permitting and Inspections page as of October 28, 2026, and no newer adopted schedule was found. Because the schedule is several years old, confirm current fees with Lynchburg Inspections before budgeting.

This page does NOT cover: Planning fees (rezoning, conditional use permits, subdivision, site plan), zoning fees (variances, appeals, sign permits, zoning letters), land disturbance and stormwater permits, code compliance and rental inspection fees, water and sewer connection or utility fees, and the credit card service fee on online payments (amount not published). None of these are in any figure on this page. Lynchburg is not yet covered by the PermitPrice calculator.

Key Takeaways
  • Permits are priced by total valuation, not square footage: $40 covers the first $1,000, and each additional $1,000 costs $5 (to $50,000), $4 (to $100,000), $3 (to $500,000), or $2 (above $500,000).
  • A 10% plan checking fee is charged on top of the permit fee whenever construction exceeds $1,000.
  • The 2.00% Virginia levy applies to building permit fees. PermitPrice applies it to the permit fee only; the schedule does not say whether plan checking is in the levy base.
  • A $300,000 new home computes to $1,187.20 (permit $1,060.00 + plan check $106.00 + levy $21.20), before electrical, mechanical, gas, and plumbing permits.
  • Residential demolition is a flat $250 ($400 commercial); a certificate of occupancy for an existing building is $75, and working without a building permit carries a $100 fee.
  • The schedule is effective May 1, 2018 and is still the fee chart the city links today (verified October 28, 2026) - confirm before budgeting.

Lynchburg Building Permit Fee Structure

Lynchburg uses one valuation table for Building (new), Repair, Electrical, Mechanical, Gas, and Plumbing permits. Each permit is priced on its own total valuation. The tiers below are exact as printed on the city's Fee Schedule.

Total Valuation Fee (exact, from schedule) Method Notes
$1 - $1,000 $40 Flat No plan checking fee at or below $1,000
$1,001 - $50,000 $40 + $5 per $1,000 First $1,000 + each add'l $1,000 $50,000 computes to $285
$50,001 - $100,000 $285 + $4 per $1,000 First $50,000 + each add'l $1,000 See printed-table note below
$100,001 - $500,000 $460 + $3 per $1,000 First $100,000 + each add'l $1,000 $500,000 computes to $1,660
$500,001 and up $1,660 + $2 per $1,000 First $500,000 + each add'l $1,000 No maximum stated
Plan checking fee 10% % of permit fee In addition to the permit fee, when construction exceeds $1,000
Virginia levy (USBC 2%) 2.00% % of building permit fees Schedule note; levy base for plan checking not stated

Printed-table note: The $50,001 - $100,000 tier implies $285 + 50 × $4 = $485 at $100,000, but the next tier starts at "$460 for the first $100,000." As printed, a project just over $100,000 computes lower than one at $100,000 (for example, $101,000 computes to $463). The upper two tiers agree with each other ($460 + 400 × $3 = $1,660). PermitPrice uses each tier exactly as printed; confirm any project valued between about $94,000 and $110,000 with the city. The schedule does not state how partial $1,000 increments are rounded.

Other Building Inspections Fees

Fee Type Fee (exact, from schedule) Method
Demolition - residential $250 Flat (commercial $400)
Moving fee $100 Flat
Manufactured housing $75 / $100 Single wide / double wide
Elevators $42 Flat
Tent / membrane structures over 900 SF $50 Flat
Asbestos removal $30 Flat
Reinspection (new construction permits) $50 Flat
Certificate of occupancy - existing building $75 Flat
Temporary certificate of occupancy $150 Per 30 days
Permit cancellation $50 Flat
Building code appeals $200 Flat
Working without a building permit $100 Flat

Source: City of Lynchburg Community Development Department Fee Schedule, Building Inspections section, effective May 1, 2018 (the "Fee Chart (PDF)" linked from the city's Permitting and Inspections page). All figures above are exact schedule figures.

Lynchburg Permit Fee Components

A Lynchburg building permit total stacks three components: the valuation-based permit fee, a 10% plan checking fee when construction exceeds $1,000, and the 2.00% Virginia levy. Trade permits are priced as separate permits on their own valuations.

Component Amount Status
Building permit fee Valuation table ($40 + tiered $5 / $4 / $3 / $2 per $1,000) Exact schedule figure
Plan checking fee 10% of the permit fee Exact rate; added when construction exceeds $1,000
Virginia state (USBC) 2% levy 2.00% Exact rate; PermitPrice applies it to the permit fee only (base for plan checking not stated)
Trade permits (electrical, mechanical, gas, plumbing) Same valuation table, each on its own valuation Separate - not included in the worked examples
Credit card service fee (online payments) Not published Excluded
Planning, zoning, land disturbance, stormwater, utility fees Separate schedules Excluded

The schedule describes the 2.00% levy as applying to "fees charged for building permits issued under the USBC." It does not say whether the 10% plan checking fee is part of that base. PermitPrice applies the levy to the permit fee only; if the city also levies the plan checking fee, the levy on a $300,000 home would rise by $2.12 (2% of $106.00).

Worked Examples

Each permit fee and the 10% plan checking rate are exact schedule figures. The 2% levy line is PermitPrice-applied to the permit fee only, because the schedule does not state whether plan checking is in the levy base. Every example assumes a valuation in whole $1,000s, since the schedule does not state how partial increments are rounded. Trade permits are not included.

Example 1: New Single-Family Home, $300,000 Valuation

Fee Calculation - $300,000 New Home in Lynchburg, VA
Fee Component Rule Applied Amount
Building permit ($100,001 - $500,000 tier) $460 + 200 × $3 $1,060.00
+ Plan checking fee 10% × $1,060.00 $106.00
+ 2% Virginia levy (PermitPrice-applied) 2% × $1,060.00 permit fee $21.20
Total (building permit only) $1,060.00 + $106.00 + $21.20 $1,187.20

Assumptions: Total valuation of $300,000, which is $200,000 (200 increments of $1,000) above the first $100,000. The $1,060.00 permit fee and the $106.00 plan checking fee are exact from the schedule; the $21.20 levy is PermitPrice-applied to the permit fee only. Separate electrical, mechanical, gas, and plumbing permits (each priced on its own valuation with the same table) are not included. Source: City of Lynchburg Fee Schedule (eff. May 1, 2018).

Example 2: Addition or Remodel, $60,000 Valuation

Fee Calculation - $60,000 Addition or Remodel in Lynchburg, VA
Fee Component Rule Applied Amount
Building permit ($50,001 - $100,000 tier) $285 + 10 × $4 $325.00
+ Plan checking fee 10% × $325.00 $32.50
+ 2% Virginia levy (PermitPrice-applied) 2% × $325.00 permit fee $6.50
Total (building permit only) $325.00 + $32.50 + $6.50 $364.00

Assumptions: Total valuation of $60,000, which is 10 increments of $1,000 above the first $50,000. The permit fee and plan checking fee are exact schedule figures; the levy is PermitPrice-applied to the permit fee only. Trade permits for new circuits, HVAC, or plumbing are separate and not included. See the Virginia addition permit cost guide for statewide context. Source: City of Lynchburg Fee Schedule (eff. May 1, 2018).

Example 3: Deck, $15,000 Valuation

Fee Calculation - $15,000 Deck in Lynchburg, VA
Fee Component Rule Applied Amount
Building permit ($1,001 - $50,000 tier) $40 + 14 × $5 $110.00
+ Plan checking fee 10% × $110.00 $11.00
+ 2% Virginia levy (PermitPrice-applied) 2% × $110.00 permit fee $2.20
Total $110.00 + $11.00 + $2.20 $123.20

Assumptions: Total valuation of $15,000, which is 14 increments of $1,000 above the first $1,000. The permit fee and plan checking fee are exact schedule figures; the levy is PermitPrice-applied to the permit fee only. Decks are on the city's list of work that requires a building permit. See the Virginia deck permit cost guide for a full walkthrough. Source: City of Lynchburg Fee Schedule (eff. May 1, 2018).

Example 4: Residential Demolition (Flat Fee)

Fee Calculation - Residential Demolition in Lynchburg, VA
Fee Component Rule Applied Amount
Demolition - residential Flat fee $250.00
+ 2% Virginia levy (PermitPrice-applied) 2% × $250.00 $5.00
Total (plan checking not added) $250.00 + $5.00 $255.00

Assumptions: The $250.00 residential demolition fee is exact from the schedule (commercial demolition is $400). The $5.00 levy is PermitPrice-applied. The 10% plan checking fee is not added here because the schedule does not state whether it applies to a flat demolition permit; if it does, add $25.00. See the Virginia demolition permit cost guide. Source: City of Lynchburg Fee Schedule (eff. May 1, 2018).

Read before you budget from these examples

  • Exact vs PermitPrice-applied: each permit fee, flat fee, and the 10% plan checking rate are exact schedule figures. The 2% levy lines are PermitPrice-applied to the permit fee only, because the schedule does not state whether the plan checking fee is in the levy base.
  • Source age: the schedule is effective May 1, 2018. It is still the fee chart the city links today (verified October 28, 2026), but confirm current fees with Lynchburg Inspections before budgeting.
  • Printed-table inconsistency near $100,000: the $50,001 - $100,000 tier implies $485 at $100,000, while the next tier starts at $460 for the first $100,000. PermitPrice uses each tier as printed; confirm projects valued between about $94,000 and $110,000 with the city.
  • Whole $1,000s only: the schedule does not state how a partial $1,000 increment is rounded, so every example uses a valuation in whole thousands.
  • Trade permits are separate: electrical, mechanical, gas, and plumbing permits are each priced on their own valuation with the same table and are not in any total above.
  • Optional context - swimming pool at $40,000: $40 + 39 × $5 = $235.00 permit, $23.50 plan checking, $4.70 levy (PermitPrice-applied), $263.20 total before pool electrical. See the Virginia pool permit cost guide.
  • Excluded fees: planning, zoning, land disturbance, stormwater, utility connection fees, and the online credit card service fee are not in any total above.

Practitioner Insight

Lynchburg's fee is driven by the valuation you put on the application, not by square footage, so the most important budgeting number is the construction value itself. The per-$1,000 rate also falls as projects get bigger: $5 per $1,000 on small jobs, $4 in the $50,000 to $100,000 range, $3 up to $500,000, and $2 above that. A $15,000 deck finishes at $123.20, while a $300,000 home finishes at $1,187.20 - about 0.8% of valuation on the deck versus about 0.4% on the home once the 10% plan checking fee and the 2% levy are added.

Two things deserve a phone call before you budget. First, the schedule is dated May 1, 2018, even though it is the chart the city still links today. Second, the printed table does not line up at $100,000, so a project valued just above $100,000 computes lower than one at $100,000. If your valuation falls near that break, or you are pricing electrical, mechanical, gas, and plumbing permits alongside the building permit, confirm the numbers with Lynchburg Inspections. For nearby comparisons, see Roanoke City, Roanoke County, and Albemarle County.

Permit Requirements - Common Residential Projects in Lynchburg

Project Type Permit Required? Fee Category Notes
New single-family home Yes Valuation table $300,000 = $1,187.20 with plan check + levy; trades separate
Addition / renovation Yes Valuation table $60,000 = $364.00 with plan check + levy
Small repairs Yes (listed) Valuation table (Repair) $1 - $1,000 valuation = $40; no plan check at or below $1,000
Deck Yes Valuation table $15,000 = $123.20 with plan check + levy
Shed / storage building Yes, over 256 SF Valuation table The city lists sheds and storage buildings over 256 SF; confirm smaller sheds
Swimming pool Yes Valuation table $40,000 = $263.20 with plan check + levy; pool electrical separate
HVAC install or replacement Yes Valuation table (Mechanical) Separate mechanical permit on its own valuation
Plumbing and electrical fixtures Yes Valuation table (trade) Separate plumbing or electrical permit on its own valuation
Demolition Yes $250 flat (residential) Commercial $400; $255.00 with levy
Moving a building Yes $100 moving fee Flat schedule fee
Re-roofing (residential) Not on the building permit list - The city lists re-roofing as "commercial only"; confirm with Inspections before skipping a permit

Permit triggers are from the City of Lynchburg's "What Requires a Building Permit" page and the Virginia Uniform Statewide Building Code. The city lists new buildings, sheds, decks, additions, renovations, small repairs, HVAC installation or replacement, plumbing and electrical fixtures, and demolition or moving as work that requires a permit. When uncertain whether a permit is required, contact Lynchburg Inspections before starting work.

Lynchburg Building Permit Office

Department

City of Lynchburg Inspections

900 Church Street, 1st Floor Permitting Center, Lynchburg, VA 24504 · 434-455-3910

Applying for a Permit

Online through eTRAKiT

Online payments carry a credit card service fee; the amount is not published

Fee Schedule

Community Development Department Fee Schedule (Building Inspections)

Effective May 1, 2018 · Legal authority: Virginia USBC · Verified October 28, 2026

Verify with your local building department before budgeting or filing. The fees on this page are from the City of Lynchburg Fee Schedule effective May 1, 2018, which the city still links as its current fee chart. Because the schedule is several years old, the printed table is inconsistent near $100,000, and the levy base is not stated, verify directly with Lynchburg Inspections (434-455-3910) before treating any total here as final.

When This Estimate May Not Apply

The schedule is dated May 1, 2018

The fee chart the city links today carries a May 1, 2018 effective date, and no newer adopted schedule was found when PermitPrice verified it on October 28, 2026. Fees may have been updated without a new chart being posted. Confirm current fees with Lynchburg Inspections before budgeting.

Valuations near $100,000 hit a printed-table inconsistency

The $50,001 - $100,000 tier implies $485 at $100,000, but the next tier starts at $460 for the first $100,000, so $101,000 computes to $463. PermitPrice uses each tier exactly as printed. If your project is valued between about $94,000 and $110,000, ask the city how it calculates the fee.

Partial $1,000 increments and the levy base are not stated

The schedule does not say how a valuation that is not a whole multiple of $1,000 is rounded, so the examples use whole thousands. It also does not say whether the 10% plan checking fee is in the 2% levy base (PermitPrice applies the levy to the permit fee only), or whether plan checking applies to trade permits and flat fees such as demolition.

Trade permits are priced separately

Electrical, mechanical, gas, and plumbing permits each use the same valuation table on their own valuation. A building-permit-only figure understates the total for any project with trade work, and a new home will usually draw several trade permits.

Planning, zoning, site, and utility fees are excluded

Planning fees, zoning fees, land disturbance and stormwater permits, code compliance and rental inspection fees, water and sewer connection or utility fees, and the online credit card service fee are not included in any figure on this page.

Frequently Asked Questions

Lynchburg prices building permits by total valuation. The fee is $40 for the first $1,000, then $5 for each additional $1,000 up to $50,000, $4 up to $100,000, $3 up to $500,000, and $2 above $500,000. A 10% plan checking fee is added when construction exceeds $1,000, and the 2% Virginia levy applies to building permit fees. A $300,000 new home works out to $1,187.20 before trade permits. The schedule is dated May 1, 2018, so confirm current fees with the city.
The plan checking fee is 10% of the permit fee, charged in addition to the permit fee when construction exceeds $1,000. On a $1,060.00 permit fee for a $300,000 home, plan checking adds $106.00. The schedule does not state whether plan checking applies to trade permits or flat fees such as demolition.
A deck is priced on its valuation. A $15,000 deck computes to $40 + 14 × $5 = $110.00, plus an $11.00 plan checking fee and a $2.20 levy (PermitPrice-applied to the permit fee), for $123.20. See the Virginia deck permit cost guide for statewide context.
Yes. The city's schedule notes a 2.00% Virginia levy on fees charged for building permits issued under the Uniform Statewide Building Code. The schedule does not say whether the 10% plan checking fee is part of the levy base, so PermitPrice applies the 2% to the permit fee only. On a $300,000 home that is $21.20; if plan checking were also levied, it would be $2.12 more.
The city's "What Requires a Building Permit" page lists re-roofing as "commercial only," so residential re-roofing is not on the building permit list. Structural roof repairs or other work may still need a permit. Confirm with Lynchburg Inspections at 434-455-3910 before starting.
The city lists storage buildings over 256 square feet and swimming pools as work that needs a building permit. Both are priced on valuation. A $40,000 pool computes to a $235.00 permit fee, $23.50 plan checking, and a $4.70 levy, for $263.20 before pool electrical. Confirm smaller sheds with the city.
The printed table is not continuous at $100,000. The $50,001 - $100,000 tier implies $285 + 50 × $4 = $485 at $100,000, but the next tier starts at "$460 for the first $100,000," so $101,000 computes to $463. PermitPrice uses each tier exactly as printed and recommends confirming any project valued between about $94,000 and $110,000 with the city.
Separate electrical, mechanical, gas, and plumbing permits; planning and zoning fees; land disturbance and stormwater permits; code compliance and rental inspection fees; water and sewer connection or utility fees; and the credit card service fee on online payments are all excluded. Compare Lynchburg with Richmond City, Roanoke City, and Albemarle County, or read the Virginia permit cost guide for full context.

Sources

Official .gov Sources · Verified October 2026
Next Step

See how Lynchburg's valuation-based table compares to other Virginia localities, or read how PermitPrice builds these figures.

Virginia Permit Cost Guide → Virginia Deck Permit Guide → Virginia Pool Permit Guide → All Permit Guides → Roanoke City Fees → Roanoke County Fees → Albemarle County Fees → Richmond City Fees → Permit Fee Calculator (covered jurisdictions) → Methodology → All Virginia Jurisdictions →

Permit Fees Are One Part of Your Project Budget

Once you know your Lynchburg permit cost, two related numbers round out your total budget picture:

Property tax impact after your project closes

A permitted project in Lynchburg may change the property's assessed value. The city's assessing office determines that value, separately from this permit fee.

Zoning, planning, and land disturbance fees for larger projects

Lynchburg's planning, zoning, land disturbance, and stormwater fees are separate from the building permit. These charges are governed separately from the building permit and are excluded from the figures above.

These charges are administered separately from the building permit fee, though the responsible office and billing process vary by jurisdiction. See which tool covers each charge →

Always verify current fees directly with City of Lynchburg Inspections before budgeting or filing. The fees on this page are from the City of Lynchburg Community Development Department Fee Schedule (Building Inspections) effective May 1, 2018. Fee schedules can change - confirm the valuation tier, plan checking, levy, and trade-permit treatment for your specific project with Lynchburg Inspections before you file.
Disclaimer: All fee information on PermitPrice is for informational purposes only and is not an official permit quotation. Actual permit fees are determined by the City of Lynchburg Inspections Division at the time of application. The valuation tiers, the 10% plan checking rate, the 2.00% Virginia levy rate, and the flat fees shown are exact from the published Fee Schedule effective May 1, 2018. The levy amounts in the worked examples are PermitPrice-applied to the permit fee only, because the schedule does not state whether plan checking is in the levy base. Examples assume valuations in whole $1,000s and exclude trade permits. Planning, zoning, land disturbance, stormwater, utility connection fees, and the online credit card service fee are not included in any figure on this page. Verify all fees directly with Lynchburg Inspections before filing.

Written by: Munib Ur Rehman

Data verified against official fee schedule documents.