Rockville, MD Building Permit Fees (2026)

Residential building permit fees from the City of Rockville's FY27 fee schedule, Resolution No. 08A-26, adopted by the Mayor and Council on May 4, 2026 and effective July 1, 2026. Rockville is an incorporated city in Montgomery County that issues its own building permits through its Inspection Services Division, so Montgomery County's permit fees do not apply inside city limits. Rockville prices homes and additions by square footage: $0.35 per square foot, plus a filing fee and a 10.25% automation fee. Every figure below comes from the resolution; any estimate is labeled as one.

Jurisdiction
City of Rockville, MD (city limits only)
Permit Type Covered
Residential building permit (single-family and townhouse)
Coverage Scope
Building permit; trade permits listed separately
Fee Schedule Effective
July 1, 2026 (Resolution 08A-26, FY27)
Last Verified
October 30, 2026
Fee Status
Official city fee resolution
What This Page Covers - and What It Does Not

This page covers: City of Rockville building permit fees for single-family detached homes and townhouses under Section 2 (Chapter 5, Buildings and Building Regulations) of Resolution No. 08A-26: the $0.35 per square foot rate for new construction, additions, and alterations, the $145 minimum permit fee, the $145 filing fee and $290 single-family dwelling filing fee, the 10.25% automation fee, flat fees for pools, fences, solar panels, and demolition, and the city's plumbing, mechanical, and electrical permit fees for reference.

This page does NOT cover: Montgomery County development impact taxes or any other county charge, Capital Contribution charges for new City water and sewer services, zoning, sediment control, stormwater, forest and tree preservation, and right-of-way fees (set in other sections of the same resolution), and fees from utilities or homeowners associations. Properties outside Rockville city limits are permitted by Montgomery County, not the City; see Montgomery County permit fees.

Filing-fee note: The resolution lists both a $145.00 filing fee and a $290.00 filing fee per dwelling for single-family dwelling (SFD) permits. It does not define which permits count as SFD permits (a new house only, or also additions and alterations to an existing house) or say whether both fees are ever charged together. It also lists no filing fee in the subsections for fences, pools, and demolition. Totals below state which filing fee they include; confirm with Inspection Services before budgeting.

Key Takeaways
  • New construction and additions cost $0.35 per square foot, counting the basement, each floor, the garage, and the roof. Alterations and repairs cost $0.35 per square foot of the affected area.
  • The $145 minimum applies to single-family and townhouse building permits (new construction, additions, alterations), so one under about 415 sq ft pays $145 before the filing and automation fees. Solar panel permits are excluded; pools, fences, and demolition have their own flat fees.
  • A 10.25% automation fee is added to all application and permit fees, including the trade permits. It is the largest add-on on most Rockville permits.
  • Flat fees: in-ground pool $605, above-ground pool $145, fences and small accessory structures $100, solar panels $125 (electrical work included), and voluntary demolition $605.
  • Trade permits are separate: plumbing and gas fixtures are $80 for the first and $20 for each additional, mechanical is $75 for the first unit, and pool electrical is $215.
  • The fees took effect July 1, 2026 under the city's FY27 resolution; Rockville has adopted a new fee resolution taking effect each July 1 since 2023.

Rockville Residential Building Permit Fee Schedule

Section 2 of Resolution No. 08A-26 sets building permit fees for single-family detached homes and townhouses, then for other structures such as pools and fences, then for demolition. Rockville is not in the PermitPrice fee calculator yet because the filing-fee rules below need confirmation; use the worked examples on this page instead.

Residential Permit Line Fee Notes
New construction / addition $0.35 / sq ft Including basement, each floor, garage, and roof
Alteration / repair $0.35 / sq ft Square feet of the affected area
Minimum permit fee $145.00 Excludes solar panel permits
Solar panels $125.00 Includes electrical work
Swimming pool - residential in-ground $605.00 Flat (Other Structures)
Swimming pool - residential above-ground $145.00 Flat (Other Structures)
Fences and small accessory structures $100.00 Flat (Other Structures)
Structures not otherwise listed $0.35 / sq ft Including basement, each floor, and roof; minimum $175.00
Demolition - voluntary $605.00 If condemned by the City after hearings: $605.00 plus $0.06 per cubic foot
Demolition - interior only $175.00 Paid in addition to permit fees
Foundation-only permit $570.00 Paid in addition to permit fees

Source: City of Rockville Resolution No. 08A-26, Section 2 (Chapter 5, Buildings and Building Regulations), adopted May 4, 2026, effective July 1, 2026. Verified October 30, 2026. Decks and sheds are not named lines; ask Inspection Services whether a deck is priced as an addition, an alteration, or a structure not otherwise listed.

Fee components and add-ons

Component Amount When It Applies
Automation fee 10.25% Of all application and permit fees; listed under building, other structures, plumbing, mechanical, and electrical (EV charging outlets excluded)
Filing fee $145.00 Listed in the single-family and townhouse subsection
Filing fee - single-family dwelling (SFD) permits $290.00 per dwelling "SFD permits"; the resolution does not define which permits that covers or say whether the $145 filing fee is also charged
Inspector call back $130.00 Unless otherwise provided
Permit or plan revision - residential $100.00 per revision Administrative amendments $45.00 each
Working without a required permit $205.00 Owner doing work on residential property; $405.00 for all others
Inspection outside business hours $265.00 Per inspection, per inspector; $70.00 per hour beyond 4 hours
Permit extension - unexpired permit $70.00 Expired within 12 months: 50% of the original fee, the minimum permit cost, or $67.25, whichever is greater, up to $2,430.00
State permit levy None Maryland has no statewide percentage building-permit levy

Residential trade permits (separate permits)

Trade Line Fee Notes
Plumbing and gas fixtures $80 first + $20 each additional Water or sewer replacement on private property $80.00 each; plumber must hold a City of Rockville license
Mechanical $75 first unit + $20 each additional A unit is each 100,000 BTU of heating or 60,000 BTU of cooling, among other definitions
Electrical - outlets, fixtures, dedicated circuits $80 first block + $20 each additional Outlets and fixtures in blocks of 20; circuits per unit; minimum electrical fee $80.00
Electrical - service up to 225 amp $100.00 Over 225 to 400 amp $125.00
Electrical - swimming pool $215.00 All pool electrical equipment
EV charging $35.00 per outlet Excluded from the automation fee and the electrical minimum

Source: Resolution No. 08A-26, Plumbing and Mechanical Permit Fee Schedule and Electrical Fee Schedule. Each trade schedule adds the 10.25% automation fee. Trade permits are separate permits and are not included in the building permit totals unless an example says so.

How Rockville Calculates Building Permit Fees

Methodology - Rockville Square-Foot Permit Fee
Step What Happens Rockville Rule
1. Measure the area Add up the area the city counts. New work: basement, each floor, garage, and roof. Alterations: the affected area only.
2. Apply the rate Multiply by $0.35, or use the flat fee for pools, fences, solar, or demolition. For single-family and townhouse permits, a result under $145 is raised to the $145 minimum (solar excluded). Pools, fences, and demolition use their own flat fees; structures not otherwise listed have a $175 minimum.
3. Add the filing fee Residential permits carry a filing fee. $145.00; "SFD permits" $290.00 per dwelling (scope not defined in the resolution).
4. Add the automation fee 10.25% of all application and permit fees. Applied to the permit fee and the filing fee; results on this page are rounded to the cent.
5. No value basis, no levy Construction cost does not enter the residential fee. No Maryland statewide levy. Multi-family and non-residential work use a separate rate with a valuation option.

Worked Examples

Example 1: Residential addition, 600 sq ft

Fee Calculation - 600 sq ft Addition in Rockville, MD
Fee Component Rule Applied Amount
Building permit 600 sq ft × $0.35 $210.00
Filing fee Flat $145.00
Automation fee $355 × 10.25% $36.39
Total with the $145 filing fee $210 + $145 + $36.39 $391.39

Assumptions: 600 sq ft of counted area (including any basement and roof area the city counts for the addition). The $210 and $145 are exact from the resolution; the automation fee is $36.3875, rounded to the cent. This total assumes the $145 filing fee; if the City treats an addition to a single-family house as an SFD permit and charges the $290 filing fee instead, the total is $551.25 ($500 × 1.1025); if both filing fees are charged, it is $711.11 ($645 × 1.1025). A small addition under about 415 sq ft pays the $145 minimum instead of the square-foot fee. Trade permits for the addition are separate.

Example 2: New single-family home, 3,000 sq ft of counted area

Fee Calculation - New Single-Family Home in Rockville, MD (Estimate)
Fee Component Rule Applied Amount
Building permit 3,000 sq ft × $0.35 $1,050.00
Filing fee - single-family dwelling Per dwelling $290.00
Automation fee $1,340 × 10.25% $137.35
Estimated Total ($290 filing fee only) $1,050 + $290 + $137.35 $1,477.35
Estimated Total if the $145 filing fee is also charged ($1,050 + $290 + $145) × 1.1025 $1,637.21

Estimate: The $0.35 rate and both filing fees are exact from the resolution, but the resolution does not say whether the $145 filing fee is charged in addition to the $290 single-family dwelling filing fee, so both totals are shown. The 3,000 sq ft is an assumed total of the basement, floors, garage, and roof area the city counts. Plumbing, mechanical, and electrical permits, Capital Contribution charges for a new City water and sewer service ($12,150 for a 1-inch meter, the minimum for new residential construction), and Montgomery County impact taxes are not included.

Example 3: In-ground pool with pool electrical

Fee Calculation - In-Ground Pool in Rockville, MD
Fee Component Rule Applied Amount
Pool building permit Flat $605.00
Pool electrical permit Flat $215.00
Automation fee $62.01 + $22.04 $84.05
Pool Building + Electrical Total $605 + $215 + $84.05 $904.05

Assumptions: The $605 and $215 are exact; 10.25% of each is rounded to the cent. The Other Structures subsection lists no filing fee, so none is included; if Inspection Services charges the $145 filing fee on a pool permit, the total becomes $1,063.92 (automation fee recomputed on $750 and $215). Pool plumbing, a pool barrier fence, and any above-ground pool ($145 flat) are separate.

Example 4: Fence, solar panels, and an HVAC replacement

Fee Calculation - Common Flat-Fee Permits in Rockville, MD
Permit Rule Applied Amount
Fence $100 + 10.25% $110.25
Solar panels (electrical included), before any filing fee $125 + 10.25% $137.81
HVAC replacement, one mechanical unit $75 + 10.25% $82.69
Voluntary demolition (for comparison) $605 + 10.25% $667.01

Assumptions: Each base fee is exact from the resolution and the automation fee is rounded to the cent. Fence and mechanical permits are listed outside the subsection that carries the filing fee, so none is included; if a $145 filing fee is charged, recompute the automation fee on the combined amount (it adds $159.86 to either the fence or the HVAC total). Solar panels are listed in the same residential subsection as the filing fees, so a filing fee may apply: with the $145 filing fee, the solar total is $297.68 ($270 × 1.1025). A heat pump or furnace larger than one mechanical unit (100,000 BTU heating or 60,000 BTU cooling) adds $20 per extra unit before the automation fee.

Practitioner Insight

The first question in Rockville is whether you are in the city at all. Many homes with a Rockville mailing address sit outside city limits and are permitted by Montgomery County, whose fee structure is different (see Montgomery County permit fees). Confirm with the City before you apply; the city's permit search lists its permit records. Gaithersburg is the other Montgomery County city that issues its own permits, under its own fee schedule.

Inside the city, the fee is easy to estimate: square footage times $0.35, a filing fee, then 10.25% on everything. The automation fee is easy to miss because it is not a separate line in the residential table; it is restated under every fee subsection. Rockville counts more area than many jurisdictions on new work (the basement, garage, and roof are all in), so measure the way the city does before comparing it with a county that charges only finished floor area, such as Calvert County. Call Inspection Services at 240-314-8240.

Permit Requirements - Common Residential Projects in Rockville

Project Type Schedule Line Fee Category Notes
New single-family home Named $0.35/sq ft 3,000 sq ft counted: est. $1,477.35 to $1,637.21 with filing and automation fees
Addition Named $0.35/sq ft 600 sq ft: $391.39 with the $145 filing fee; $551.25 with the $290 SFD filing fee; $711.11 with both
Alteration / interior remodel Named $0.35/sq ft affected $145 minimum, plus filing and automation fees
Swimming pool Named $605 / $145 flat In-ground / above-ground; pool electrical $215 separate
Fence or small accessory structure Named $100 flat $110.25 with the automation fee
Solar panels Named $125 flat Includes electrical work; minimum fee does not apply; filing fee may apply
Demolition Named $605 flat Interior-only demolition $175
Deck or shed Not named - Ask Inspection Services which line applies

City of Rockville Inspection Services Division

Department

Community Planning and Development Services - Inspection Services Division

Rockville City Hall, 111 Maryland Ave., Rockville, MD 20850

Phone and Email

240-314-8240

permits@rockvillemd.gov - Monday to Friday, 8:30 am to 5 pm

Fee Schedule

Resolution No. 08A-26 (FY27)

Adopted May 4, 2026; effective July 1, 2026

Verify current fees with the City of Rockville Inspection Services Division before budgeting or filing. Ask whether your property is inside city limits, which filing fee applies to your permit, and how a deck or shed is priced. Call 240-314-8240 or email permits@rockvillemd.gov.

When This Estimate May Not Apply

Your property is outside Rockville city limits

A Rockville mailing address does not by itself place a property inside the city. Outside city limits, Montgomery County issues the permit and its own fees apply.

The filing fee that applies is not spelled out

The resolution lists a $145 filing fee and a $290 filing fee per single-family dwelling without saying whether both apply to a new house, does not define which permits count as SFD permits, and lists no filing fee for pools, fences, or demolition. The new-home and addition totals are shown both ways; other totals leave the filing fee out where the resolution does not list one, and the solar total is shown with and without it.

Decks and sheds are not named lines

The resolution has no deck or shed line, so this page gives no fee for them. A deck could be priced as an addition, an alteration, a small accessory structure ($100), or a structure not otherwise listed ($0.35 per sq ft, $175 minimum); ask Inspection Services.

New homes carry much larger charges than the permit

A new City water and sewer service carries a Capital Contribution charge ($12,150 for a 1-inch meter under the same resolution), and Montgomery County impact taxes may apply. Neither is included in the permit totals on this page.

Fees change each fiscal year

Rockville has revised its fee resolution every year since 2023, each taking effect July 1. These figures are the FY27 amounts in effect from July 1, 2026; a FY28 resolution would replace them.

Frequently Asked Questions

New homes, additions, and alterations cost $0.35 per square foot with a $145 minimum, plus a filing fee and a 10.25% automation fee. A 600 sq ft addition comes to $391.39 with the $145 filing fee, $551.25 if the $290 single-family dwelling filing fee applies instead, or $711.11 if both are charged. A new house with 3,000 sq ft of counted area is an estimated $1,477.35, or $1,637.21 if both filing fees are charged.
It is 10.25% of all application and permit fees. The resolution lists it under the building, other structures, plumbing, mechanical, and electrical schedules, so it applies to trade permits too. EV charging outlets are excluded.
A residential in-ground pool is a flat $605 and an above-ground pool is $145. Pool electrical is a separate $215 permit. With the 10.25% automation fee, an in-ground pool plus its electrical permit comes to $904.05.
The resolution sets a $100 fee for fences and small accessory structures, which is $110.25 with the automation fee. Ask Inspection Services whether your fence needs a permit and whether a filing fee is added.
Not inside city limits. The City of Rockville sets and collects its own building, plumbing, mechanical, and electrical permit fees under Chapter 5 of the City Code. Properties outside the city, even with a Rockville mailing address, are permitted by Montgomery County.
$125, which includes the electrical work. The $145 minimum permit fee does not apply to solar panel permits. With the 10.25% automation fee it is $137.81; solar is listed in the residential subsection that also carries the $145 filing fee, and if that fee is charged the total is $297.68.
No. Maryland has no statewide percentage building-permit levy like Virginia's 2% levy. The only percentage add-on on a Rockville residential permit is the City's own 10.25% automation fee.

Sources

Official Sources - Verified October 2026
Next Step

Outside city limits? Check Montgomery County's permit fees, or compare nearby Maryland jurisdictions.

Montgomery County Fees → Gaithersburg (City) Fees → Howard County Fees → Calvert County Fees → Montgomery County Addition Guide → Maryland Permit Fees Hub →

Permit Fees Are One Part of Your Project Budget

Once you know your Rockville permit cost, two related numbers complete your total budget picture:

Property tax impact after your project closes

A permitted project may change the property's assessed value. Maryland's State Department of Assessments and Taxation performs that assessment and certifies it to the local jurisdictions, separately from this permit fee.

Utility connection and impact charges

Capital Contribution charges for new City water and sewer services and any county impact taxes on new construction are separate from the building permit and are excluded from the figures above.

These charges are administered separately from the building permit fee, though the responsible office and billing process vary by jurisdiction. See which tool covers each charge →

Always verify current fees directly with the City of Rockville Inspection Services Division before budgeting or filing. These are the FY27 amounts in Resolution No. 08A-26, effective July 1, 2026. Call 240-314-8240 to confirm current amounts, which filing fee applies, and whether your property is inside city limits.
Disclaimer: All fee information on PermitPrice is for informational purposes only and is not an official permit quotation. Actual permit fees are determined by the City of Rockville at the time of application. Building permit totals on this page exclude trade permits unless stated, Capital Contribution and other water and sewer charges, Montgomery County impact taxes, and zoning, stormwater, and right-of-way fees. The new-home, addition, and solar totals depend on which filing fee the City charges, which the resolution does not spell out.

Written by: Munib Ur Rehman

Data verified against official fee schedule documents.