Skip to main content

Newport News, VA Building Permit Fees (2026)

Actual residential building permit fee structure from the City of Newport News Permit Fee Schedule (City Code Section 13-26). Verified directly against the published city document.

Jurisdiction
Newport News, VA (independent city)
Permit Type Covered
Building permit (residential)
Coverage Scope
Building permit only - trade permits separate
Fee Schedule Effective
July 1, 2009 (still current)
Last Verified
June 8, 2026
Fee Status
Value-based fees exact; new-construction SF table separate
What This Page Covers - and What It Does Not

This page covers: The residential building permit fee in the City of Newport News - a value-based 0.44% of construction value for use groups R3/R4/R5 (0.48% for other use groups), the $56.10 minimum permit fee, and the 2% Virginia state levy. Because alterations, repairs, decks, pools, fences, and similar structures are billed directly off declared construction value at 0.44%, those project costs are fully computable from the published schedule.

This page does NOT give a new-construction or addition dollar example: New buildings and additions use a different path - (Table 13-26 cost-per-square-foot × floor area) × a 0.88 regional factor × 0.44%. The Table 13-26 square-foot cost table is referenced in City Code but is not contained in the published fee PDF, so a new-home or addition dollar figure cannot be reproduced from the source alone. We disclose the formula but do not publish an unverifiable new-construction total.

This page does NOT cover: Trade permits (electrical, plumbing, mechanical), which are separate permits on their own fee lines; impact and proffer fees; water and sewer connection fees (Public Utilities); Health Department fees; and zoning fees.

Key Takeaways
  • The residential building permit fee is 0.44% of the value of construction for use groups R3/R4/R5; other use groups are charged 0.48%.
  • The minimum permit fee is $56.10, which covers projects up to about $12,750 of construction value before the percentage takes over.
  • A 2% Virginia state levy is added to the computed permit fee on every permit.
  • Alterations, repairs, decks, pools, fences, piers, and bulkheads bill directly off declared construction value at 0.44% - there are no separate flat project-type line items.
  • New construction and additions use a square-foot cost table (Table 13-26) that is not in the published fee PDF, so a new-home dollar figure cannot be computed from the source alone - confirm Table 13-26 with the department.
  • The published schedule is printed "Effective July 1, 2009" and is still the city's current adopted fee schedule - the source-age caveat is disclosed throughout this page.

Newport News Building Permit Fee Structure

Newport News uses a value-based percentage for the building permit, with a $56.10 minimum and a 2% state levy on top. Two valuation paths apply: alterations and accessory structures bill directly off construction value, while new construction and additions add a square-foot cost table and a regional factor.

Project / Fee Type Base Fee (exact) Method Notes
Alteration / repair (R3/R4/R5) 0.44% of value Value-based $56.10 minimum; direct off value
Deck / pool / fence / pier (R3/R4/R5) 0.44% of value Value-based Same path as alterations; $56.10 min
Alteration / structures (other use groups) 0.48% of value Value-based $56.10 minimum
New construction / addition (R3/R4/R5) SF table × 0.88 × 0.44% SF cost table Table 13-26 SF cost not in fee PDF - verify with dept
Minimum permit fee $56.10 Flat floor Covers value up to ~$12,750
Electrical (by service panel amps) $56.10 - $198.90 Tiered by amps Separate trade permit; +$30.60 per added 50A
Plumbing $56.10 + $10.20/fixture Per fixture Separate trade permit; $56.10 min
Mechanical 0.44% / 0.48% of value Value-based Separate trade permit; $56.10 min
Virginia state (USBC) levy 2% Of computed fee Added to every permit

Source: City of Newport News Permit Fee Schedule (City Code Section 13-26), printed effective July 1, 2009 and still published as the current schedule. Value-based figures are exact from the schedule; the new-construction square-foot cost table (Table 13-26) is referenced but not contained in the fee PDF. Verify current rates and Table 13-26 before filing.

Newport News Permit Fee Components

The all-in number on a value-based path is the computed permit fee (subject to the $56.10 minimum) plus the 2% Virginia state levy. The schedule's header notes that fees "include" the 2% surcharge, but the city's own worked examples add the 2% as a separate line - we follow the city's worked-example method.

Component Amount In 2% Levy Base?
Building permit fee 0.44% of value (min $56.10) Yes (levy = 2% of this)
Virginia state (USBC) levy 2% Of the computed permit fee

The city's printed example confirms the method: a $13,000 residential project is $13,000 × 0.0044 = $57.20 base, plus a 2% surcharge of $1.15, for $58.35 total. There is no separate technology fee or local surcharge on the Newport News schedule.

Worked Examples

Example 1: $15,000 Residential Deck (value-based)

Fee Calculation - $15,000 Deck in Newport News, VA
Fee Component Rule Applied Amount
Building permit fee 0.44% × $15,000 $66.00
2% state levy 2% × $66.00 $1.32
All-in building permit total $66.00 + $1.32 $67.32 (exact)

Assumptions: $15,000 declared construction value, above the $56.10-minimum threshold so the 0.44% rate governs. Decks bill on the alteration/structures path - directly off value, with no square-foot table or regional factor. Any deck electrical work needs a separate trade permit. Source: City of Newport News Permit Fee Schedule, Section (a)(3).

Example 2: Small Project at the Minimum Fee

Fee Calculation - $10,000 Project in Newport News, VA
Fee Component Rule Applied Amount
Calculated permit fee 0.44% × $10,000 = $44.00 below minimum
Minimum permit fee applies Floor $56.10
2% state levy 2% × $56.10 $1.12
All-in building permit total $56.10 + $1.12 $57.22 (exact)

Assumptions: Any project under about $12,750 of declared value produces a calculated fee below $56.10 and therefore pays the $56.10 minimum, so the all-in building permit is $57.22. Source: City of Newport News Permit Fee Schedule, Section (a)(1).

Example 3: $50,000 Major Renovation (value-based)

Fee Calculation - $50,000 Renovation in Newport News, VA
Fee Component Rule Applied Amount
Building permit fee 0.44% × $50,000 $220.00
2% state levy 2% × $220.00 $4.40
All-in building permit total $220.00 + $4.40 $224.40 (exact)

Assumptions: $50,000 declared construction value for an interior alteration/renovation (value-based path). This is the building-permit side only - electrical, plumbing, and mechanical work pulls separate trade permits, each with its own $56.10 minimum and 2% levy. Source: City of Newport News Permit Fee Schedule, Section (a)(3).

Why there is no new-home dollar example here

New construction and additions are not billed off declared value - they use (Table 13-26 cost per square foot × floor area) × a 0.88 regional factor × 0.44%. Table 13-26 sets the per-square-foot construction cost by building type and is not printed in the published fee PDF, so any new-home total would be an unverifiable guess. Confirm Table 13-26 with the Department of Codes Compliance before budgeting new construction.

Practitioner Insight

Newport News is one of the lower-cost building-permit cities in Hampton Roads on remodel-type work: 0.44% of value with a $56.10 floor means a $15,000 deck is under $70 all-in, and there is no technology fee or plan-review add-on stacked on top the way some Northern Virginia counties do. For decks, pools, fences, and interior alterations, you can price the permit in one line - value times 0.0044, plus 2%.

The catch is new construction. The 0.44% rate does not apply directly to a new home's value - the city runs it through a published square-foot cost table (Table 13-26) and a 0.88 regional factor, and that table is not in the fee PDF. If you are pricing a new house or a large addition, do not assume 0.44% of the construction contract; call the Department of Codes Compliance and ask for the Table 13-26 cost-per-square-foot figure for your building type. And remember the schedule is the long-standing 2009-adopted structure - still in force, but always worth a confirmation call before you file.

Permit Requirements - Common Residential Projects in Newport News

Project Type Permit Required? Base Fee Category Notes
Deck Yes 0.44% of value (min $56.10) $15,000 deck = $67.32 all-in
Swimming pool Yes 0.44% of value (min $56.10) $30,000 pool = $134.64; barrier + electrical separate
Fence Yes 0.44% of value (min $56.10) Listed with other structures in Section (a)(3)
Alteration / repair Yes 0.44% of value (min $56.10) $50,000 renovation = $224.40 all-in
New construction / addition Yes SF table × 0.88 × 0.44% Table 13-26 SF cost not in fee PDF - verify with dept
Electrical / plumbing / mechanical Separate trade permit $56.10 min each Electrical tiered by amps; plumbing per fixture

Permit trigger thresholds and classifications are set by the City of Newport News and the Virginia Uniform Statewide Building Code. Work performed before obtaining the required permit is subject to a double-fee charge. When uncertain whether a permit is required, contact the Department of Codes Compliance before starting work.

Newport News Building Permit Office

Department

Department of Codes Compliance

City Hall, 2400 Washington Ave., Newport News, VA 23607 · 757-926-8861

Online Portal

Newport News Permits

Apply and check permit info at nnva.gov

Fee Schedule

City Code Section 13-26

Printed effective July 1, 2009 (still current)

Verify with your local building department before budgeting or filing. The fees on this page are from the City of Newport News Permit Fee Schedule (City Code Section 13-26). Rates can change and the square-foot cost table for new construction is held separately - confirm current fees and Table 13-26 with the Department of Codes Compliance and apply at nnva.gov.

When This Estimate May Not Apply

New construction and additions use a separate cost table

The 0.44% value-based path applies to alterations, decks, pools, and fences. New buildings and additions run through Table 13-26 (cost per square foot) and a 0.88 regional factor, and that table is not in the published fee PDF. Do not apply 0.44% directly to a new home's value.

The schedule carries a source-age caveat

The published schedule is printed "Effective July 1, 2009." The city still lists it as the current fee schedule and confirms the $56.10 minimum, but a structure this established is always worth a confirmation call before you file.

Trade permits are separate

Electrical (tiered by service-panel amps), plumbing (per fixture), and mechanical (0.44%/0.48% of value) are separate permits, each with its own $56.10 minimum and 2% levy. A multi-trade renovation pulls several permits.

Work before permit doubles the fee

Any work started before the appropriate permit is issued is charged a double fee, except defined emergencies (emergency heat, water-heater replacement, safety-glass replacement) where the permit must be obtained the next working day. Zoning, impact/proffer, utility connection, and Health Department fees are also separate.

Frequently Asked Questions

For alterations, decks, pools, and fences, the building permit fee is 0.44% of the value of construction (use groups R3/R4/R5), with a $56.10 minimum, plus a 2% Virginia state levy on the computed fee. A $15,000 deck is about $67.32 all-in; a project under roughly $12,750 of value lands on the $56.10 minimum and is $57.22 all-in; a $50,000 renovation is about $224.40 all-in. New construction and additions use a separate square-foot cost table (Table 13-26) that is not in the published fee PDF.
A deck is billed on the alteration/structures path at 0.44% of construction value, directly off value with no square-foot table. A $15,000 deck is $66.00 permit + $1.32 state levy = $67.32 all-in. A smaller deck under about $12,750 of value falls on the $56.10 minimum ($57.22 all-in). Any deck electrical work needs a separate trade permit. See our Newport News deck permit guide for more worked examples.
The minimum permit fee is $56.10. Because the rate is 0.44%, any project with a declared construction value up to about $12,750 produces a calculated fee below $56.10 and therefore pays the $56.10 minimum. With the 2% levy, a minimum-fee permit is $57.22 all-in. The same $56.10 minimum also applies to plumbing, electrical, and mechanical permits.
New buildings and additions are not billed off declared value. They use (Table 13-26 cost per square foot × floor area) × a 0.88 regional factor × 0.44%, plus the 2% levy. Table 13-26 sets the per-square-foot cost by building type and is referenced in City Code but is not printed in the published fee PDF, so we cannot reproduce a verified new-home total from the source. Contact the Department of Codes Compliance for the Table 13-26 figure for your building type.
No. Electrical, plumbing, and mechanical permits are separate. Electrical is tiered by service-panel amperage ($56.10 single-phase up to 125A, rising to $198.90 over 200A three-phase, plus $30.60 per added 50A). Plumbing is $56.10 minimum plus $10.20 per fixture. Mechanical is 0.44% (R3/R4/R5) or 0.48% (other) of value. Each carries its own $56.10 minimum and 2% levy.
Newport News's 0.44% value-based rate is low and simple on remodel work. Norfolk charges a flat $100 for residential alterations regardless of value, so Newport News is cheaper on smaller jobs and Norfolk on larger ones. Virginia Beach stacks a $50 base plus $5 per $1,000 of value and a $100 plan review, which is higher on most jobs. See our Newport News vs Norfolk and Newport News vs Virginia Beach comparisons for side-by-side worked examples.

Sources

Official .gov Sources · Verified June 2026
Next Step

Compare Newport News fees against a neighboring Hampton Roads city, or calculate your project cost.

Virginia Permit Cost Guide → Newport News Deck Permit Guide → Hampton City Fees → Norfolk City Fees → Permit Fee Calculator → All Virginia Jurisdictions →

Permit Fees Are One Part of Your Project Budget

Once you know your Newport News permit cost, two related numbers round out your total budget picture:

Property tax impact after your project closes

A permitted deck or addition increases your assessed value in Newport News. See how each Virginia jurisdiction calculates the ongoing property tax impact at CountyTaxTools.com.

Zoning and connection fees for larger projects

Zoning permits, impact/proffer fees, and water/sewer connection fees in Newport News are separate from the building permit. Research zoning costs at ZoneFee.com.

Always verify current fees directly with the Newport News Department of Codes Compliance before budgeting or filing. The fees on this page are from the City of Newport News Permit Fee Schedule (City Code Section 13-26). Fee schedules can change and the Table 13-26 square-foot cost table for new construction is held separately - request confirmation for your specific project and apply at nnva.gov.
Disclaimer: All fee information on PermitPrice is for informational purposes only and is not an official permit quotation. Actual permit fees are determined by the City of Newport News Department of Codes Compliance at the time of application. The 0.44%/0.48% value-based rates, the $56.10 minimum, and the 2% levy shown are exact from the published Section 13-26 schedule. New-construction valuation (Table 13-26), trade permits, zoning, utility connection, and impact fees are separate. The schedule is printed effective July 1, 2009 and is still the city's current published structure - verify all fees directly with the department before filing.

Written by: Munib Ur Rehman

Data verified against official fee schedule documents.