Chesapeake, VA Building Permit Fees (2026)

Actual residential building permit fee structure from the City of Chesapeake Department of Development and Permits Fee Schedule (revised December 31, 2025). Verified directly against the published 49-page city document.

Jurisdiction
Chesapeake, VA (independent city)
Permit Type Covered
Building permit (residential)
Coverage Scope
Building permit only - trade permits separate
Fee Schedule Effective
Revised December 31, 2025
Last Verified
June 8, 2026
Fee Status
Official fee schedule, all figures exact
What This Page Covers - and What It Does Not

This page covers: The residential building permit fees in the City of Chesapeake - the two base methods ($10 per 100 sq ft for new construction and accessory structures over 256 sq ft, and $15 per $1,000 of value for alterations and repairs), the itemized fees for pools, fences, and demolition, the $50 administrative fee, separate plan review, the 2% Virginia state levy, and the $10 technology fee.

This page does NOT cover: Trade permits (electrical, mechanical, gas, plumbing), which are charged on separate schedules; Public Utilities water/sewer connection fees; Health Department well/septic fees; impact or proffer fees; and zoning permit fees that apply to some project types separately from the building permit.

One known data gap: The schedule does not itemize a separate residential "deck" fee. Per the city's building-permit requirements, a residential deck is submitted under residential new-construction/addition review, so it is most likely billed under the per-100-sq-ft addition table or the alteration value table. Confirm which basis applies to your deck with the Department of Development and Permits before budgeting.

Key Takeaways
  • New construction, additions, garages, and sheds over 256 sq ft are billed by area: $50 administrative fee + $10 per 100 sq ft (a 2,000 sq ft project is $250 base before plan review and surcharges).
  • Alterations and repairs are billed by value: $50 administrative fee + $15 per $1,000 of job value (a $30,000 remodel is $500 base before plan review and surcharges).
  • Separate plan review is $100 for new one/two-family structures and $75 for additions and alterations.
  • The 2% Virginia USBC state levy applies to the administrative fee + permit fee + building plan review + certificate of occupancy fee. It does NOT apply to the $10 zoning plan review fee or the $10 technology fee - confirmed against the schedule's own worked examples.
  • An in-ground residential pool is a fully itemized $275 all-in (permit $150 + admin $50 + plan review $50 + zoning $10 + technology $10 + $5 levy), regardless of pool cost.

Chesapeake Building Permit Fee Structure

Chesapeake uses a per-square-foot base for new construction and a per-$1,000 base for alterations, with several common residential projects itemized at flat or value-based rates. Every figure below is exact from the fee schedule (rev 12/31/2025). Plan review, the 2% state levy, and the $10 technology fee are then added on top - see the fee components and worked examples for the all-in totals.

Project / Fee Type Base Fee (exact) Method Notes
New construction / addition / accessory >256 sq ft $50 + $10 / 100 sq ft Per 100 sq ft Admin baked into table; 2,000 sq ft = $250
Alteration / repair $50 + $15 / $1,000 Per $1,000 value Admin baked into table; $30,000 = $500
In-ground swimming pool $275.00 all-in Itemized flat Permit $150 + admin/PR/zoning/tech + levy
Above-ground swimming pool $198.50 all-in Itemized flat Permit $75 + admin/PR/zoning/tech + levy
Fence (non-barrier) $15 / $1,000 + $70 Per $1,000 value Admin $50 + zoning $10 + tech $10; no levy line
Demolition (per structure) $112.00 Flat + $50 rodent inspection unless waived by report
Plan review - new 1/2-family $100.00 Flat Additions / alterations $75; subject to 2% levy
Technology fee $10.00 Flat per permit Every permit; not in the 2% levy base

Source: City of Chesapeake Department of Development and Permits Fee Schedule and Permit Info, revised December 31, 2025. All base fees are exact from the printed schedule. Verify current rates before filing.

Chesapeake Permit Fee Components

Unlike percentage-surcharge jurisdictions, Chesapeake stacks a set of itemized add-ons on top of the base permit fee. The most important rule is the levy base: the 2% Virginia state levy applies to the administrative fee, permit fee, building plan review, and certificate of occupancy fee - but NOT to the $10 zoning plan review fee or the $10 technology fee. This was cross-checked against the two worked examples printed in the schedule.

Component Amount In 2% Levy Base?
Administrative fee $50.00 Yes
Building permit fee $10 / 100 sq ft or $15 / $1,000 Yes
Building plan review $100 new / $75 alter Yes
Certificate of occupancy Varies (where required) Yes
Zoning plan review fee $10.00 No
Technology fee $10.00 No
Virginia state (USBC) levy 2% Of admin + permit + plan review + CO

Every figure here is exact from the rev 12/31/2025 schedule. The levy base rule was verified against the schedule's printed examples (a $190 base + 2% = $3.80, and an $1,830 base + 2% = $36.60), confirming the zoning plan review and technology fees are excluded from the levy.

Worked Examples

Example 1: In-Ground Residential Pool (fully itemized)

Fee Calculation - In-Ground Pool in Chesapeake, VA
Fee Component Rule Applied Amount
Permit fee (in-ground) Flat $150.00
Administrative fee Flat $50.00
Building plan review Flat $50.00
Zoning plan review Flat (no levy) $10.00
Technology fee Flat (no levy) $10.00
2% state levy 2% × ($150 + $50 + $50) $5.00
All-in total Sum of components $275.00 (exact)

Assumptions: Every figure is exact from the rev 12/31/2025 schedule - the pool building permit fee is itemized and does not depend on pool cost. A pool barrier/fence and any pool electrical work are separate permits. Source: City of Chesapeake Fee Schedule p. 33.

Example 2: $30,000 Residential Alteration (per-$1,000 method)

Fee Calculation - $30,000 Remodel in Chesapeake, VA
Fee Component Rule Applied Amount
Base permit fee (incl. admin) $50 + $15 × 30 $500.00
Building plan review Alteration flat $75.00
2% state levy 2% × ($500 + $75) $11.50
Technology fee Flat (no levy) $10.00
All-in total $500 + $75 + $11.50 + $10 $596.50 (exact)

Assumptions: $30,000 declared job value. The $500 base is read directly from the printed alteration table ($29,001-$30,000 bracket) and already includes the $50 administrative fee. Any electrical, mechanical, or plumbing work needs separate trade permits. Source: City of Chesapeake Fee Schedule p. 12.

Example 3: New 2,000 sq ft Construction (per-100-sq-ft method)

Fee Calculation - New 2,000 sq ft Home in Chesapeake, VA
Fee Component Rule Applied Amount
Base permit fee (incl. admin) $50 + $10 × 20 $250.00
Building plan review (new) Flat $100.00
2% state levy 2% × ($250 + $100) $7.00
Technology fee Flat (no levy) $10.00
Building-permit subtotal $250 + $100 + $7 + $10 $367.00

Assumptions: 2,000 sq ft of gross enclosed area; base read from the printed per-100-sq-ft table ($1,901-$2,000 bracket = $250 incl. admin). This is the building-permit subtotal only - a residential certificate of occupancy fee is added where required, and electrical, mechanical, and plumbing trade permits are separate. Source: City of Chesapeake Fee Schedule pp. 9-11.

Practitioner Insight

Chesapeake is one of the easier Hampton Roads cities to price because the schedule splits cleanly into two methods: pay by area for anything you are adding (new construction, additions, large sheds), and pay by value for anything you are changing (alterations and repairs). The per-value method runs $15 per $1,000, which is effectively a 1.5% rate - meaningfully higher than the value-based cities nearby like Hampton at 0.39%. On a $30,000 remodel that difference is the gap between $500 and $117 of base permit fee.

The detail people miss is the levy base. Chesapeake does not levy 2% on the whole bill - the $10 zoning plan review and the $10 technology fee sit outside the levy. It is a small dollar amount, but it tells you the city itemizes precisely, which is why the in-ground pool permit lands on an exact $275 every time regardless of how expensive the pool is. When in doubt, ask the Department of Development and Permits whether your project is billed by area or by value, because that single choice drives the entire number.

Permit Requirements - Common Residential Projects in Chesapeake

Project Type Permit Required? Base Fee Category Notes
New construction / addition Yes $50 + $10/100 sq ft Plus plan review, levy, technology fee
Alteration / remodel Yes $50 + $15/$1,000 Trade permits separate
In-ground pool Yes $275 all-in Barrier/fence + electrical separate
Above-ground pool Yes $198.50 all-in Itemized flat permit
Deck Yes Addition or alteration table No separate deck line - confirm basis with DDP
Fence (non-barrier) Yes (zoning-reviewed) $15/$1,000 + $70 No state levy line for non-barrier fences
Shed 256 sq ft and under Zoning permit (not building) $50 admin + $9/100 sq ft + $20 Building permit if in an AE flood zone
Demolition Yes $112 + $50 rodent Rodent inspection waived with pest report
Electrical / mechanical / plumbing Separate trade permit Separate schedules (pp. 39-40) Not included in building permit fee

Permit trigger thresholds and classifications are set by the City of Chesapeake and the Virginia Uniform Statewide Building Code. When uncertain whether a permit is required, contact the Department of Development and Permits before starting work.

Chesapeake Building Permit Office

Department

Development and Permits

306 Cedar Road, 2nd Floor, Chesapeake, VA 23322 · 757-382-6018

Online Portal

eBuild

Apply and pay online at cityofchesapeake.net/ebuild

Fee Schedule

Rev. December 31, 2025

Development and Permits Fee Schedule

Verify with your local building department before budgeting or filing. The fees on this page are from the City of Chesapeake Fee Schedule revised December 31, 2025. Rates can change - confirm current fees with the Department of Development and Permits and apply online at cityofchesapeake.net/ebuild.

When This Estimate May Not Apply

A deck has no separate fee line

The schedule does not itemize a residential deck. A deck is most likely billed under the per-100-sq-ft addition table or the per-$1,000 alteration table, but the basis is not printed. Confirm with the Department of Development and Permits before budgeting a deck.

Trade permits are charged separately

Electrical, mechanical, gas, and plumbing permits are on separate schedules (pp. 39-40) and were not extracted here. A remodel that touches multiple trades carries several permit fees.

Certificate of occupancy and utilities

New construction may add a certificate of occupancy fee (in the levy base). Public Utilities water/sewer connection fees and Health Department well/septic fees are separate and can be significant.

Commercial or non-residential construction

This page covers residential permits. Commercial and other use groups have different plan review and certificate fees. Do not apply these residential figures to commercial projects.

Frequently Asked Questions

It depends on the method. New construction and additions are $50 administrative + $10 per 100 sq ft; alterations and repairs are $50 administrative + $15 per $1,000 of value. Every permit then adds plan review ($100 new / $75 alterations), a 2% Virginia state levy, and a $10 technology fee. As concrete examples: an in-ground pool is $275 all-in, a $30,000 remodel is about $596.50, and a new 2,000 sq ft home is about $367 on the building-permit side.
An in-ground residential pool is a fully itemized $275 all-in: a $150 permit fee + $50 administrative + $50 building plan review + $10 zoning plan review + $10 technology fee + $5 state levy (2% of the $250 levy base). The figure does not change with the cost of the pool. An above-ground pool is $198.50 all-in. The pool barrier/fence and any pool electrical work are separate permits.
The 2% Virginia Uniform Statewide Building Code (USBC) levy is collected by Chesapeake and remitted to the Commonwealth. In Chesapeake it applies to the administrative fee + permit fee + building plan review + certificate of occupancy fee. It does NOT apply to the $10 zoning plan review fee or the $10 technology fee - a detail confirmed against the schedule's own printed worked examples.
Chesapeake's schedule does not itemize a separate deck fee. A deck is submitted under residential new-construction/addition review, so it is most likely billed under the per-100-sq-ft addition table or the per-$1,000 alteration value table - both of which start from the $50 administrative fee and add plan review, the 2% levy, and the $10 technology fee. Because the basis is not printed, confirm with the Department of Development and Permits whether your deck is billed by area or by value before budgeting.
A shed 256 sq ft and under generally needs zoning approval rather than a building permit (the schedule lists a $50 administrative fee + $9 per 100 sq ft + $10 zoning + $10 technology). A shed over 256 sq ft - or any shed in an AE flood zone - is treated as an accessory structure under the per-100-sq-ft building permit table. Confirm your lot's flood zone with the city before you decide which path applies.
Chesapeake's per-$1,000 alteration method ($15/$1,000, about 1.5%) runs higher than value-based neighbors like Hampton (0.39%) on remodels, but its itemized flat pool permit ($275) can be cheaper than a value-based pool fee on an expensive pool. Norfolk uses a flat $100 alteration fee, and Virginia Beach uses a tiered structure. See our Chesapeake vs Hampton comparison and the Norfolk and Virginia Beach pages for side-by-side context.

Sources

Official .gov Sources · Verified June 2026
Next Step

Compare Chesapeake fees against a neighboring Hampton Roads city, or calculate your project cost.

Virginia Permit Cost Guide → Chesapeake Pool Permit Guide → Norfolk City Fees → Virginia Beach Fees → Permit Fee Calculator → All Virginia Jurisdictions →

Permit Fees Are One Part of Your Project Budget

Once you know your Chesapeake permit cost, two related numbers round out your total budget picture:

Property tax impact after your project closes

A permitted pool or addition increases your assessed value in Chesapeake. See how each Virginia jurisdiction calculates the ongoing property tax impact at CountyTaxTools.com.

Zoning and utility connection fees for larger projects

Zoning permits, Public Utilities water/sewer connection, and proffer fees in Chesapeake are separate from the building permit and can exceed it for major projects. Research zoning costs at ZoneFee.com.

Always verify current fees directly with the Chesapeake Department of Development and Permits before budgeting or filing. The fees on this page are from the City of Chesapeake Fee Schedule revised December 31, 2025. Fee schedules can change - request confirmation for your specific project and apply at cityofchesapeake.net/ebuild.
Disclaimer: All fee information on PermitPrice is for informational purposes only and is not an official permit quotation. Actual permit fees are determined by the City of Chesapeake Department of Development and Permits at the time of application. Base fees and the itemized pool/alteration figures shown are exact from the rev 12/31/2025 schedule. Trade permits, certificate of occupancy fees, utility connection fees, and impact fees are separate. Fee schedules can change without notice - verify all fees directly with the department before filing.