Alexandria, VA Building Permit Fees (2026)

Actual residential building permit fee structure from the City of Alexandria FY26 Permit Center fee schedule (Council Resolution 3287), effective July 1, 2025. Verified against the published city document.

Jurisdiction
Alexandria, VA (independent city)
Permit Type Covered
Building permit (residential)
Coverage Scope
Building permit only - trade permits separate
Fee Schedule Effective
July 1, 2025 (FY26, Res. 3287)
Last Verified
June 7, 2026
Fee Status
Official base fees; surcharge stack estimated
What This Page Covers - and What It Does Not

This page covers: The residential building permit base fees in the City of Alexandria - the $95 minimum permit fee, the $0.75 per square foot new-construction rate, the greater-of formula for alterations, and the flat fees for decks, pools, and solar - plus the percentage surcharge set the city applies on top.

This page does NOT cover: Trade permits (electrical, plumbing, mechanical, gas), which are charged on separate schedules; Site Plan, Special Use Permit, or DSUP review fees; fire protection system permits; impact, development, or utility connection fees; and the third-party payment processing fee.

Important - surcharge stacking is an assumption: Alexandria lists four local percentage surcharges (14% Administrative + 11% Permit Center + 0.2% Training + 5% Information Technology = 30.2%) plus the Virginia state levy. The published schedule does not state whether these are each calculated against the base fee (additive) or compounded on a running total, and it does not print the state levy percentage. Worked examples on this page treat the surcharges as additive on the base fee and the state levy at the statewide 2% rate, and label every all-in figure as an estimate. Confirm the exact total with the Permit Center.

Key Takeaways
  • The minimum building permit fee is $95 for any permit issued by the Department of Code Administration.
  • New residential construction is $0.75 per square foot of gross area, including basements, garages, and roofed carports.
  • Residential alterations and repairs are the greater of $0.30/sq ft, $18 per $1,000 of construction cost, or the $95 minimum.
  • Special-construction flat fees: deck $100, swimming pool $110; residential solar PV, chimney/fireplace, and historic-district roof/siding/window replacement are each the $95 minimum.
  • On top of the base fee, Alexandria adds 30.2% in local surcharges plus the Virginia state levy. A non-refundable 35% application deposit applies to permits that require plan review.

Alexandria Building Permit Fee Structure

Alexandria uses a per-square-foot base for new construction, a greater-of formula for alterations, and flat fees for several common residential projects. Every base fee below is exact from the FY26 schedule. The percentage surcharge set (30.2% local plus the state levy) is then added on top - see the surcharge breakdown and worked examples for how the all-in total is estimated.

Project / Fee Type Base Fee (exact) Method Notes
Minimum permit fee $95.00 Flat floor Any permit issued by Code Administration
New residential construction $0.75 / sq ft Per gross sq ft Includes basements, garages, roofed carports
Residential alteration / repair Greater of 3 $0.30/sq ft, $18/$1,000, or $95 Whichever is greatest
Deck (residential) $100.00 Flat Special construction
Swimming pool (residential) $110.00 Flat Special construction
Residential solar PV $95.00 Minimum permit fee Same for chimney/fireplace inserts
Demolition (residential structure) $150.00 Flat Accessory/detached garage $85; bond required
Certificate of Occupancy (residential) $156.75 Per dwelling unit Includes addition completion

Source: City of Alexandria Permit Center Fee Schedule, effective July 1, 2025 (FY26), City Council Resolution 3287, Department of Code Administration. Base fees are exact; surcharges are added separately. Verify current rates before filing.

Alexandria Permit Surcharge Stack

On top of the base permit fee, Alexandria assesses four local percentage surcharges plus the Virginia state levy. The schedule does not state whether they are additive on the base or compounded - this page treats them as additive, which is standard practice in neighboring Virginia jurisdictions.

Surcharge Rate Applies To
Administrative Fee 14% All Code Administration and Fire Department fees via APEX
Permit Center Fee 11% All permits and certificates issued
Training Program Fee 0.2% All permits (not certificates)
Information Technology Fee 5% All fees processed via APEX
Virginia state (USBC) levy ~2% (estimated) All permit fees (rate not printed in schedule)
Combined (additive estimate) ~32.2% 30.2% local + ~2% state, additive on base

The four local rates (14% + 11% + 0.2% + 5%) are exact from the FY26 schedule. The ~2% state levy and the additive stacking method are estimates - the schedule references the state levy "as established by the Code of Virginia" without printing the percentage, and does not specify stacking order. Confirm the exact total with the Permit Center before budgeting.

Worked Examples

Example 1: Residential Deck (flat fee)

Fee Calculation - Residential Deck in Alexandria, VA
Fee Component Rule Applied Amount
Base permit fee (deck) Flat special-construction fee $100.00 (exact)
Surcharge stack (estimated) $100 × ~32.2% (additive assumption) ~$32.20 (est.)
Estimated all-in total $100 + ~$32.20 ~$132.20 (est.)

Assumptions: The $100 base is exact from the FY26 schedule. The all-in total is an estimate: surcharges are treated as additive on the base (30.2% local + ~2% state). The schedule does not state stacking order or the exact state levy, so confirm the total with the Permit Center. Trade permits (if any electrical work) are separate.

Example 2: $25,000 Residential Alteration (greater-of formula)

Fee Calculation - $25,000 Alteration in Alexandria, VA
Fee Component Rule Applied Amount
Option A - per sq ft 250 sq ft × $0.30 $75.00
Option B - per $1,000 value $25,000 / $1,000 × $18 $450.00
Option C - minimum fee Floor $95.00
Base fee (greatest of A/B/C) Option B governs $450.00 (exact)
Estimated all-in total $450 + ~32.2% surcharges (est.) ~$594.90 (est.)

Assumptions: $25,000 declared construction cost over an estimated 250 sq ft of affected floor area. The greater-of rule selects the per-$1,000 amount ($450), which is exact. The all-in total is estimated using the additive ~32.2% surcharge assumption. A non-refundable 35% application deposit applies if the project requires plan review. Trade permits are separate. Source: Alexandria FY26 fee schedule.

Practitioner Insight

Alexandria's base permit fees are genuinely low - a $100 deck or a $95 solar permit looks cheap next to value-based counties. The catch is the surcharge stack. Four local surcharges totaling 30.2%, plus the state levy, push the real cost up by roughly a third. On small flat-fee jobs the dollar impact is modest ($32 on a $100 deck), but on a value-based alteration it compounds: a $450 base alteration carries close to $145 in surcharges. Always price the surcharges in, not just the headline base fee.

The second thing to plan for is the 35% non-refundable application deposit on anything requiring plan review. You pay it up front when you apply, before the permit is approved, and you do not get it back if you walk away. For homeowners that means the cash outlay starts at application, not at issuance. And because the schedule does not spell out whether the surcharges are additive or compounded, the only way to lock in an exact number is to ask the Permit Center for a fee quote on your specific project before you budget.

Permit Requirements - Common Residential Projects in Alexandria

Project Type Permit Required? Base Fee Category Notes
Deck Yes $100 flat + surcharges Special construction
Swimming pool Yes $110 flat + surcharges Barrier/fence requirements apply
New construction Yes $0.75/sq ft + surcharges Incl. basement, garage, carport area
Alteration / remodel Yes Greater of $0.30/sq ft, $18/$1,000, $95 Trade permits separate
Solar PV Yes $95 minimum + surcharges Residential photovoltaic system
Roof / siding / window (historic district) Yes $95 minimum + surcharges Historic district review may add steps
Demolition (residential structure) Yes $150 + surcharges Performance bond $1/sq ft, min $1,000
Electrical work Separate electrical permit $194/unit new; $19.50/$1,000 alteration (min $95) Trade permit - separate schedule
Plumbing / mechanical Separate trade permit $194/unit new; $19.50/$1,000 alteration (min $95) Trade permit - separate schedule
Gas piping Separate gas permit $40 residential base + $20/outlet Trade permit - separate schedule

Permit trigger thresholds and classifications are set by the City of Alexandria and the Virginia Uniform Statewide Building Code. When uncertain whether a permit is required, contact the Alexandria Permit Center through the city's permit portal before starting work.

Alexandria Building Permit Office

Department

Department of Code Administration

City of Alexandria

Online Portal

Alexandria Permit Center (APEX)

Apply and pay online at alexandriava.gov/permits

Fee Schedule

FY26, Council Res. 3287

Effective July 1, 2025

Verify current fees with the Alexandria Permit Center before budgeting or filing. The fees on this page are from the FY26 schedule (Council Resolution 3287), effective July 1, 2025. Because the schedule does not state how the percentage surcharges stack or print the exact state levy, ask the Permit Center for a fee quote on your specific project. Apply and confirm rates at alexandriava.gov/permits.

When This Estimate May Not Apply

Surcharge stacking method is not published

The all-in totals on this page assume the surcharges are additive on the base fee and the state levy is 2%. If Alexandria compounds the surcharges or applies a different levy rate, your actual total will differ. The base fees are exact; the surcharge add-on is an estimate.

35% non-refundable application deposit

Permits requiring plan review need a non-refundable deposit of 35% of the total estimated fee at application. The balance is due when the permit is approved. This changes your cash timing and is not refundable if the project does not proceed.

Trade permits are charged separately

Electrical ($194/dwelling unit new, or $19.50/$1,000 for alterations), plumbing, mechanical, and gas permits are separate from the building permit. A remodel that touches multiple trades can carry several permit fees plus surcharges on each.

Historic district and site-plan review

Alexandria has extensive historic districts. Roof, siding, and window work in a historic district is the $95 minimum permit, but separate Board of Architectural Review approvals may apply. Site Plan, Special Use Permit, and DSUP review fees are not part of the building permit fee.

Commercial or non-residential construction

This page covers residential permits only. Non-residential new construction uses a tiered base-fee table by square footage. Do not apply these residential rates to commercial projects.

Frequently Asked Questions

The minimum building permit fee is $95. A residential deck is a flat $100 and a swimming pool is a flat $110 (base fees). New construction is $0.75 per square foot; alterations are the greater of $0.30/sq ft, $18 per $1,000 of construction cost, or the $95 minimum. On top of the base, Alexandria adds 30.2% in local surcharges plus the Virginia state levy - roughly a third more. So a $100 deck is about $132 all-in (estimated).
Four local surcharges apply: a 14% Administrative Fee, an 11% Permit Center Fee, a 0.2% Training Program Fee, and a 5% Information Technology Fee - totaling 30.2%. The Virginia state (USBC) levy also applies, estimated at the statewide 2%. The published schedule does not state whether these are added to the base (additive) or compounded, so the combined ~32.2% all-in figure is an estimate. Ask the Permit Center for an exact quote.
Residential alterations and repairs are the greater of three numbers: $0.30 per square foot of gross floor area, $18 per $1,000 of total construction cost, or the $95 minimum permit fee. For most value-driven remodels the per-$1,000 figure governs - a $25,000 alteration is $450 base (before surcharges). Then the surcharge stack is added on top.
For permits that require plan review, Alexandria collects a non-refundable deposit of 35% of the total estimated permit fee (including levies) when you apply. The remaining balance is paid when the permit is approved. Because it is non-refundable, you do not get it back if you decide not to proceed with the project after review begins.
A residential solar photovoltaic system permit is charged at the $95 minimum permit fee, plus the surcharge stack (about $30 estimated), for an estimated all-in of roughly $125. The electrical interconnection typically needs a separate electrical permit. Confirm whether your installer pulls the electrical permit or you do.
Alexandria's base fees are low and largely flat for small projects ($95-$110), while neighbors like Prince William County use per-square-foot minimums and Fairfax County uses a percentage-of-value model. Alexandria's distinguishing feature is its 30%+ surcharge stack and the 35% non-refundable application deposit on plan-review projects. See our Prince William County and Loudoun County pages for side-by-side context.

Sources

Official .gov Sources · Verified June 2026
Next Step

Compare Alexandria fees against a neighboring jurisdiction, or calculate your project cost.

Virginia Permit Cost Guide → Alexandria Deck Permit Guide → Prince William County Fees → Loudoun County Fees → Fairfax County Fees → Permit Fee Calculator → All Permit Guides →

Permit Fees Are One Part of Your Project Budget

Once you know your Alexandria permit cost, two related numbers round out your total budget picture:

Property tax impact after your project closes

A permitted deck or addition increases your assessed value in Alexandria. See how each Virginia jurisdiction calculates the ongoing property tax impact at CountyTaxTools.com.

Zoning, site-plan, and impact fees for larger projects

Site Plan, Special Use Permit, DSUP review, and development fees in Alexandria are separate from the building permit and can exceed it for major projects. Research them at ZoneFee.com.

Always verify current fees directly with the Alexandria Permit Center before budgeting or filing. The fees on this page are from the FY26 schedule (Council Resolution 3287), effective July 1, 2025. Because the schedule does not specify surcharge stacking order or print the exact state levy, the all-in totals are estimates. Request a fee quote for your specific project at alexandriava.gov/permits.
Disclaimer: All fee information on PermitPrice is for informational purposes only and is not an official permit quotation. Actual permit fees are determined by the City of Alexandria Department of Code Administration at the time of application. Base fees shown are exact from the FY26 schedule; all-in totals are estimates because the schedule does not state the surcharge stacking method or the state levy percentage. Trade permits, plan review deposits, and impact fees are separate. Fee schedules can change without notice - verify all fees directly with the Permit Center before filing.

Written by: Munib Ur Rehman

Data verified against official fee schedule documents.