Skip to main content

Brownsville, TX Building Permit Fees (2026)

Actual residential building permit fees from the Brownsville Code of Ordinances, Sec. 18-123 - Schedule of permit fees. Brownsville is a Cameron County city in the Rio Grande Valley - the southernmost city in Texas, on the U.S.-Mexico border. Verified directly against the city's codified fee schedule. The permit-fee amounts trace to Ord. 2019-1485-C, effective July 30, 2019, so confirm current amounts with the city before budgeting.

Jurisdiction
Brownsville, TX (Cameron Co.)
Permit Type
Building permit (residential)
Coverage Scope
City of Brownsville
Fee Schedule (last amended)
Ord. 2019-1485-C (Jul 30, 2019)
Last Verified
July 2026
Fee Status
Codified fees - 2019 amendment, verify current
What This Page Covers - and What It Does Not

This page covers: The residential building permit fees in Brownsville from Sec. 18-123. New construction is a $40.00 base fee plus a per-square-foot rate set by the total conditioned square-footage bracket: $0.25 per sq ft for 1-1,450 SF, $0.27 per sq ft for 1,451-3,010 SF, and $0.30 per sq ft for 3,011 SF and up. Interior alterations/repairs are $40.00 base plus $40.00 (up to 1,000 SF) or $75.00 (over 1,000 SF); exterior alterations/repairs are $40.00 base plus $15.00 (up to 1,000 SF) or $35.00 (over 1,000 SF). A residential swimming pool is $200.00, solar panels $225.00, and re-roofing runs $50.00 to $150.00 by area. Each figure is exact from the codified schedule.

Important note on fee schedule age: The permit-fee amounts in Sec. 18-123 trace to Ord. No. 2019-1485-C, effective July 30, 2019 - about seven years old at the time of writing. The Municode supplement that publishes the code is current, but the dollar amounts themselves date to 2019. Fee schedules can be amended by later ordinance, so confirm the current amounts with the City of Brownsville before relying on any figure.

The bracket rate is applied to the whole conditioned area (an assumption): This page computes new construction as $40.00 plus the bracket rate multiplied by ALL conditioned square feet - for example, a 2,000 SF home is $40 + 2,000 × $0.27, not a marginal or stacked computation across brackets. The ordinance sets a single per-SF rate by total square footage but does not explicitly state whether the rate is applied to all square feet or marginally within each band, so this is disclosed as an interpretation. Confirm the correct method with the city.

Trade permits are separate: Electrical, mechanical, plumbing, and gas permit fees are codified in separate articles of Chapter 18 and are NOT included in the per-square-foot building permit. A new build likely requires separate trade permits - confirm which apply with the city. This page does not invent any trade-permit amount.

Texas has no statewide levy: Texas adds no statewide percentage building-permit levy on top of the city's permit fee.

This page does NOT cover: Electrical, mechanical, plumbing, and gas trade permits (separate Chapter 18 articles); capital recovery / impact fees; and certificate-of-occupancy fees - all excluded from every figure on this page. There is no separately listed fence permit in Sec. 18-123, so no fence fee is stated here.

Key Takeaways
  • New construction is a $40.00 base fee plus a per-square-foot rate set by the total conditioned square-footage bracket: $0.25/sq ft (1-1,450 SF), $0.27/sq ft (1,451-3,010 SF), or $0.30/sq ft (3,011 SF and up). This page applies the bracket rate to the whole conditioned area - an interpretation the ordinance does not state explicitly.
  • Interior alterations/repairs are $40.00 base plus $40.00 (up to 1,000 SF) or $75.00 (over 1,000 SF). Exterior alterations/repairs are $40.00 base plus $15.00 (up to 1,000 SF) or $35.00 (over 1,000 SF).
  • Common flat and tiered residential fees: swimming pool $200.00, solar panels $225.00, re-roofing $50.00 (1-500 SF) / $70.00 (501-2,000 SF) / $150.00 (over 2,000 SF), house leveling $75.00, enclosures $70.00, window replacement $70.00 (up to 4 units) / $120.00 (5+ units), mechanical repairs $60.00, mobile/manufactured home $50.00, and re-inspection $75.00.
  • Plan checking is an added surcharge: a flat $50.00 for a single-family or two-family dwelling, or 50% of the permit fee for commercial/multifamily (3+ units). Starting work before the permit is issued doubles the fee. Electrical, mechanical, plumbing, and gas permits are separate Chapter 18 fees and NOT included here.
  • The permit-fee amounts trace to Ord. 2019-1485-C (effective July 30, 2019) - about seven years old - so confirm current amounts with the city. Capital recovery / impact fees and certificate-of-occupancy fees are separate. There is no separately listed fence permit in Sec. 18-123, and Texas has no statewide levy.

Brownsville Building Permit Fee Structure

Brownsville prices a new-construction building permit as a flat $40.00 base fee plus a per-square-foot rate set by the total conditioned square-footage bracket. Alterations, repairs, and specialty projects carry flat or tiered fees, and a plan-checking surcharge applies on top. The tables below show the verified figures exactly as published in Sec. 18-123 of the Brownsville Code of Ordinances (permit-fee amounts per Ord. 2019-1485-C).

New construction & alterations

Category Fee
New construction - base fee (per permit)$40.00
New construction - per-SF rate, 1-1,450 SF bracket$0.25 / sq ft
New construction - per-SF rate, 1,451-3,010 SF bracket$0.27 / sq ft
New construction - per-SF rate, 3,011 SF and up bracket$0.30 / sq ft
Interior alterations / repairs (up to 1,000 SF)$40.00 base + $40.00
Interior alterations / repairs (over 1,000 SF)$40.00 base + $75.00
Exterior alterations / repairs (up to 1,000 SF)$40.00 base + $15.00
Exterior alterations / repairs (over 1,000 SF)$40.00 base + $35.00

The bracket rate is set by the total conditioned square footage. This page applies that single rate to ALL conditioned square feet (for example, a 2,000 SF home computes as $40 + 2,000 × $0.27), which the ordinance does not state explicitly - confirm the correct method with the city. Electrical, mechanical, plumbing, and gas permits are codified in separate Chapter 18 articles and are not included in these figures.

Flat & tiered residential permit fees

Permit Fee
Residential swimming pool$200.00
Residential solar panels$225.00
Re-roofing (1-500 SF)$50.00
Re-roofing (501-2,000 SF)$70.00
Re-roofing (over 2,000 SF)$150.00
House leveling$75.00
Residential enclosures$70.00
Window replacement (up to 4 units)$70.00
Window replacement (5+ units)$120.00
Residential mechanical repairs$60.00
Mobile / manufactured home$50.00
Demolition (first 1,000 SF, then $25 per additional 500 SF)$100.00
Re-inspection$75.00
Moving a building$150.00

There is no separately listed fence permit in Sec. 18-123, so this page states no fence fee - confirm whether a fence requires a permit with the city. Trade permits (electrical, mechanical, plumbing, gas) are separate Chapter 18 fees not shown here.

Plan checking surcharge

Plan Check Category Fee
Residential single-family or two-family dwelling$50.00 flat
Commercial / multifamily (3+ units)50% of permit fee
Work started before permit issuedDouble fee

Plan checking is a surcharge added on top of the permit fee. For a single-family or two-family dwelling it is a flat $50.00; for commercial or multifamily (3+ units) it is 50% of the permit fee. Beginning work before the permit is issued doubles the permit fee.

Brownsville Permit Fee Components

A Brownsville building permit combines a base fee, a per-square-foot or flat project fee, and a plan-checking surcharge. Trade permits and site fees are separate and are not summed into the building-permit figure on this page.

Component Amount Status
New-construction base fee $40.00 Exact schedule figure; added to the per-SF amount
New-construction per-SF rate $0.25 / $0.27 / $0.30 Set by total conditioned SF bracket; whole-area application assumed
Plan checking (single/two-family dwelling) $50.00 flat Surcharge added to the permit fee
Residential percentage surcharge / state levy $0.00 None - Texas has no statewide levy on the city permit fee
Electrical / mechanical / plumbing / gas permits Separate articles Codified in separate Chapter 18 articles - NOT included here
Capital recovery / impact / certificate-of-occupancy fees Separate schedules Excluded - can far exceed the building permit on a new home

For a specialty project - a pool, solar array, or re-roof - the printed fee is the building-permit cost, with plan checking and any required trade permit added separately. For a new home, add the $40 base, the per-SF amount, the $50 plan-check surcharge, and the separate trade permits to reach a true all-in figure; confirm each with the city.

Worked Examples

Every figure below is direct from Sec. 18-123 of the Brownsville Code of Ordinances (permit-fee amounts per Ord. 2019-1485-C). The new-construction example applies the bracket rate to the whole conditioned area (an assumption) and excludes the separate electrical, mechanical, plumbing, and gas trade permits. Capital recovery and certificate-of-occupancy fees are separate and not included.

Example 1: New 2,000 SF Home

Fee Calculation - New 2,000 SF Home in Brownsville, TX
Fee Component Rule Applied Amount
Base fee flat per permit $40.00
Per-SF fee (1,451-3,010 bracket) 2,000 SF × $0.27 $540.00
Building permit subtotal $40 + $540 $580.00
Plan checking (single-family dwelling) flat $50.00
Total with plan check $580 + $50 $630.00

Assumptions: A 2,000 SF home falls in the 1,451-3,010 SF bracket at $0.27/sq ft, and this page applies that rate to the whole conditioned area: $40 base + 2,000 × $0.27 = $580.00 building permit, plus the $50.00 single-family plan-checking surcharge = $630.00. Two disclosures: (a) the whole-area-at-bracket-rate approach is an interpretation the ordinance does not state explicitly, and (b) electrical, mechanical, plumbing, and gas trade permits are separate Chapter 18 fees and are NOT included in this figure - a new build likely needs them, so confirm which apply with the city. Source: Brownsville Code of Ordinances, Sec. 18-123 (Ord. 2019-1485-C).

Example 2: Interior Remodel up to 1,000 SF

Fee Calculation - Interior Remodel in Brownsville, TX
Fee Component Rule Applied Amount
Base fee flat per permit $40.00
Interior alteration (up to 1,000 SF) flat adder $40.00
Interior remodel permit total (exact) $40 + $40 $80.00

Assumptions: An interior alteration or repair up to 1,000 SF is a $40.00 base fee plus a $40.00 adder = $80.00. Over 1,000 SF the adder rises to $75.00 (total $115.00). Exterior work is cheaper: a $15.00 adder up to 1,000 SF (total $55.00) or $35.00 over 1,000 SF (total $75.00). Any trade work draws a separate electrical, mechanical, plumbing, or gas permit under a different Chapter 18 article. Source: Brownsville Code of Ordinances, Sec. 18-123 (Ord. 2019-1485-C).

Example 3: Residential Swimming Pool

Fee Calculation - Residential Pool in Brownsville, TX
Fee Component Rule Applied Amount
Residential swimming pool permit flat $200.00
Pool permit total (exact) flat fee $200.00

Assumptions: A residential swimming pool is a flat $200.00 building permit. A residential solar-panel permit is $225.00. Pool electrical bonding and any required barrier draw a separate electrical or building permit under a different Chapter 18 article - confirm which apply with the city. Source: Brownsville Code of Ordinances, Sec. 18-123 (Ord. 2019-1485-C).

Example 4: Re-Roofing and Demolition

Fee Calculation - Re-Roof & Demolition in Brownsville, TX
Project Rule Applied Fee
Re-roofing 1,500 SF (501-2,000 bracket) tiered by area $70.00
Demolition (first 1,000 SF) flat base $100.00

Assumptions: Re-roofing is tiered by area - $50.00 for 1-500 SF, $70.00 for 501-2,000 SF, and $150.00 over 2,000 SF - so a 1,500 SF re-roof is $70.00. Demolition is $100.00 for the first 1,000 SF, then $25.00 per additional 500 SF, so a 1,000 SF demolition is $100.00. Each is a flat or tiered fee with no residential percentage surcharge. Source: Brownsville Code of Ordinances, Sec. 18-123 (Ord. 2019-1485-C).

Read before you budget from these examples

  • Source age: the permit-fee amounts trace to Ord. 2019-1485-C, effective July 30, 2019 - about seven years old. Confirm current amounts with the city before relying on any figure.
  • Whole-area assumption: the new-construction example applies the bracket rate to all conditioned square feet, which the ordinance does not state explicitly - verify the method with the city.
  • Trade permits are separate: electrical, mechanical, plumbing, and gas permits are separate Chapter 18 fees and are NOT in the new-home figure above.
  • Plan checking is added: a flat $50 for a single/two-family dwelling, or 50% of the permit fee for commercial/multifamily (3+ units).
  • Excluded fees can dwarf the permit: capital recovery / impact fees and certificate-of-occupancy fees are separate and not in any figure above.

Practitioner Insight

Brownsville uses a low per-square-foot model that keeps a new-home building permit modest: a 2,000 SF house is a $40 base plus $540 in per-SF fees for a $580 building permit, well under the flat new-home permits seen elsewhere in Texas. Its Rio Grande Valley neighbor McAllen is the closest peer for comparing Valley permit costs, and metros like Austin price new construction on a very different, valuation-driven scale - so the building permit itself is one of the cheaper parts of a Brownsville build.

Two cautions. First, the fee amounts trace to a 2019 ordinance, so it is worth confirming with the city that the schedule has not been amended before you file. Second - and more consequential for a new build - the per-SF building permit does NOT include the electrical, mechanical, plumbing, and gas trade permits, which are codified in separate Chapter 18 articles, nor capital recovery or certificate-of-occupancy fees. Anyone permitting a whole house should get the full stack of applicable permits and fees from the city rather than treating the $580 building permit as the all-in cost. For a small project - a pool, solar array, or re-roof - the printed fee plus plan checking is the whole permit cost.

Permit Requirements - Common Residential Projects in Brownsville

Project Type Permit Required? Fee Category Notes
New single-family home Yes $40 + $0.25-$0.30/SF Rate set by total SF bracket; trade permits separate
Interior remodel Yes $40 + $40 / $75 $40 adder up to 1,000 SF; $75 over 1,000 SF
Exterior remodel Yes $40 + $15 / $35 $15 adder up to 1,000 SF; $35 over 1,000 SF
Residential swimming pool Yes $200 flat Solar panels are $225
Re-roof Yes $50 / $70 / $150 Tiered: 1-500, 501-2,000, over 2,000 SF
Window replacement Yes $70 / $120 $70 up to 4 units; $120 for 5+ units
Fence Verify Not separately listed No fence fee in Sec. 18-123 - confirm with the city
Electrical / HVAC / plumbing / gas Yes Separate articles Codified in separate Chapter 18 articles - not on this page

Permit trigger thresholds and project-classification determinations (which square footage counts, whether a project is new construction vs. an alteration, whether a fence needs a permit) are set by the City of Brownsville Building Inspection division. When uncertain whether a permit is required, contact the city before starting work - beginning work before the permit is issued doubles the fee.

City of Brownsville Building Inspection

Department

Building Inspection

City of Brownsville, Cameron County, Texas

Permits & Fees

brownsvilletx.gov - Permitting

Confirm the current fee schedule, trade-permit fees, and counter hours on the city's official site

Fee Schedule

Sec. 18-123 (Ord. 2019-1485-C)

Permit-fee amounts effective July 30, 2019 - confirm current amounts before filing

Verify with your local building department before budgeting or filing. The fees on this page are from Sec. 18-123 of the Brownsville Code of Ordinances, with permit-fee amounts traced to Ord. 2019-1485-C (effective July 30, 2019). The amounts are about seven years old, fees are set by the city and can change, trade permits are codified separately, and the whole-area per-SF application is an interpretation - verify directly with the City of Brownsville Building Inspection division before treating any total here as final.

When This Estimate May Not Apply

The fee amounts date to a 2019 ordinance

The permit-fee amounts in Sec. 18-123 trace to Ord. 2019-1485-C, effective July 30, 2019 - about seven years old. The Municode supplement is current, but the dollar amounts date to 2019 and could have been amended since. Confirm current amounts with the city before filing.

You are building a new home

The $40 base plus per-SF building permit is only part of the cost. Electrical, mechanical, plumbing, and gas trade permits are separate Chapter 18 fees, and the whole-area application of the bracket rate is an assumption. Get the full permit stack and confirm the method with the city.

Your project is commercial or multifamily

Plan checking for commercial or multifamily (3+ units) work is 50% of the permit fee, not the flat $50 residential rate, and the fee structure can differ. Verify the commercial figures directly with the city.

You need a fence or other permit not listed in Sec. 18-123

There is no separately listed fence permit in the schedule, so this page states no fence fee. Whether a fence, or another project not itemized here, requires a permit and what it costs is determined by the city - confirm before starting.

Site and occupancy fees apply to a new build

Capital recovery / impact fees and certificate-of-occupancy fees are separate charges NOT in any figure on this page and can far exceed the building permit on a new home.

Source note: All figures come from the Brownsville Code of Ordinances, Chapter 18, Article III, Sec. 18-123 - Schedule of permit fees, published on Municode. The permit-fee amounts trace to Ord. No. 2019-1485-C, effective July 30, 2019; the Municode supplement carrying the code is current, but the dollar amounts date to 2019. Electrical, mechanical, plumbing, and gas trade permits (separate Chapter 18 articles), capital recovery / impact fees, and certificate-of-occupancy fees are not used here.

Frequently Asked Questions

New construction is a flat $40.00 base fee plus a per-square-foot rate set by the total conditioned square-footage bracket: $0.25/sq ft for 1-1,450 SF, $0.27/sq ft for 1,451-3,010 SF, and $0.30/sq ft for 3,011 SF and up. Applying the bracket rate to the whole area (an assumption), a 2,000 SF home is $40 + 2,000 × $0.27 = $580.00, plus a $50.00 single-family plan-checking surcharge = $630.00. These figures come from Sec. 18-123 of the Brownsville Code of Ordinances (permit-fee amounts per Ord. 2019-1485-C, effective July 30, 2019) - verify current amounts before budgeting.
No. Electrical, mechanical, plumbing, and gas permit fees are codified in separate articles of Chapter 18 and are NOT included in the per-square-foot building permit. A new build likely requires separate trade permits, so confirm which apply and their current amounts with the city. This page does not state any trade-permit amount because those are outside Sec. 18-123.
Alterations and repairs are a $40.00 base fee plus an adder that depends on whether the work is interior or exterior and its size. Interior work is $40.00 up to 1,000 SF or $75.00 over 1,000 SF (total $80.00 or $115.00). Exterior work is $15.00 up to 1,000 SF or $35.00 over 1,000 SF (total $55.00 or $75.00). Any trade work draws a separate electrical, mechanical, plumbing, or gas permit under a different Chapter 18 article.
A residential swimming pool permit is a flat $200.00 and a residential solar-panel permit is $225.00. Re-roofing is tiered by area: $50.00 for 1-500 SF, $70.00 for 501-2,000 SF, and $150.00 over 2,000 SF. These are flat or tiered fees with no residential percentage surcharge, so the figures are exact - though pool bonding or a required barrier may draw a separate trade or building permit.
Sec. 18-123 does not separately list a fence permit, so this page states no fence fee rather than inventing one. Whether a fence requires a permit in Brownsville - and what it would cost - is determined by the City of Brownsville Building Inspection division. Contact the city before building a fence to confirm the requirement and any applicable fee.
The permit-fee amounts trace to Ord. 2019-1485-C, effective July 30, 2019 - about seven years old - so confirm current amounts with the city before relying on any figure. The Municode supplement itself is current. Brownsville's low per-square-foot model keeps a new-home building permit modest compared with the Rio Grande Valley neighbor McAllen and with valuation-driven metros like Austin. See every city on the Texas permit fees hub.

Sources

Official Sources · Verified July 2026
Next Step

See how Brownsville's per-SF fees compare to other Texas cities, or estimate fees in covered jurisdictions.

Texas Permit Fees Hub → McAllen Permit Fees → Austin Permit Fees → Permit Fee Calculator → Laredo Permit Fees → Laredo Fence Guide → Brownsville Pool Permit Guide → Brownsville Roof Permit Guide → All Texas Cities →

Permit Fees Are One Part of Your Project Budget

Once you know your Brownsville permit cost, two related numbers round out your total budget picture:

Property tax impact after your project closes

A permitted addition or pool increases your assessed value in Cameron County. A permitted project may change the property's taxable value. The county appraisal district determines that value and local taxing units adopt the rates, both separately from this permit fee.

Impact and utility fees for larger projects

Capital recovery / impact fees and certificate-of-occupancy fees in Brownsville are separate from the building permit. These items are governed by fee schedules separate from the building permit and are not included in the figures above.

These charges are administered separately from the building permit fee, though the responsible office and billing process vary by jurisdiction. See which tool covers each charge →

Always verify current fees directly with the City of Brownsville Building Inspection division before budgeting or filing. The fees on this page are from Sec. 18-123 of the Brownsville Code of Ordinances, with permit-fee amounts traced to Ord. 2019-1485-C (effective July 30, 2019). The amounts are about seven years old and fees can change - confirm the project classification, the applicable trade permits, and the current amounts with Building Inspection before you file.
Disclaimer: All fee information on PermitPrice is for informational purposes only and is an estimate, not an official permit quotation. Actual permit fees are determined by the City of Brownsville Building Inspection division at the time of application. The new-construction $40.00 base fee plus per-square-foot brackets ($0.25 / $0.27 / $0.30), the interior ($40/$75) and exterior ($15/$35) alteration adders, the specialty fees (pool $200.00, solar $225.00, re-roof $50.00-$150.00, and others), and the plan-checking surcharge ($50.00 residential / 50% commercial) shown are as codified in Sec. 18-123 (permit-fee amounts per Ord. 2019-1485-C, effective July 30, 2019). This page applies the bracket rate to the whole conditioned area, an interpretation the ordinance does not state explicitly. Electrical, mechanical, plumbing, and gas trade permits (separate Chapter 18 articles), capital recovery / impact fees, and certificate-of-occupancy fees are not included in any figure here. There is no separately listed fence permit. Verify all fees directly with Building Inspection before filing.

Written by: Munib Ur Rehman